Laserfiche WebLink
I <br /> 1 <br /> 2 DIVISION 7 I <br /> 3 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> 4 SEWERS, WATER MAINS, AND CONDUITS I <br /> 5 7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS 69 <br /> 6 7-05.3 Construction Requirements 69 <br /> 7 7-05.3(1) Adjusting Manholes and Catch Basins to Grade 69 <br /> 8 7-05.3(5) Adjusting Valve Boxes to Grade 70 <br /> 9 7-05.4 Measurement 70 <br /> 10 7-05.5 Payment 71 <br /> 11 <br /> 12 DIVISION 8 <br /> 13 MISCELLANEOUS CONSTRUCTION 111 <br /> 14 8-09 RAISED PAVEMENT MARKERS 72 <br /> 15 8-09.1 Description 72 1 <br /> 16 8-09.2 Materials 72 <br /> 17 8-09.3 Construction Requirements 72 <br /> 18 8-09.3(5) Asphalt Adhesives 72 <br /> 19 8-09.4 Measurement 73 1 <br /> 20 8-09.5 Payment 73 <br /> 21 8-13 MONUMENT CASES 73 <br /> 22 8-13.1 Description 73 <br /> 23 8-13.2 Vacant 73 <br /> 24 8-13.3 Construction Requirements 73 <br /> 25 8-13.4 Measurement 73 <br /> 26 8-13.5 Payment 73 <br /> 27 8-20 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, INTELLIGENT <br /> 28 TRANSPORTATION SYSTEMS, AND ELECTRICAL 74 I <br /> 29 8-20.2 Materials - Fiber Optic Cable, Electrical Conductors, and Cable 74 <br /> 30 8-20.3 Construction Requirements 75 1 <br /> 31 8-20.3(6) Junction Boxes, Cable Vaults, and Pull Boxes 75 <br /> 32 8-20.3(14) Signal Systems 75 <br /> 33 8-20.3(14)C Induction Loop Vehicle Detectors 75 <br /> 34 8-20.4 Measurement 77 <br /> 35 8-20.5 Payment 77 <br /> 36 8-22 PAVEMENT MARKING 78 <br /> 37 8-22.2 Materials 78 <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE F OF G SPECIAL PROVISIONS <br /> WORK ORDER 3751 MARCH 29, 2021II <br />