Laserfiche WebLink
I <br /> 1 <br /> 2 I 3 DIVISIONI.GR1 <br /> 4 Division 1 <br /> 5 General Requirements I <br /> 6 <br /> 7 DESWORK.GR1 <br /> 8 DESCRIPTION OF WORK <br /> 9 <br /> 10 FDESWORKI.DOCX <br /> 11 (March 13, 1995) <br /> 12 This Contract provides for the improvement of***The construction of up to 17,610 tons of Hot <br /> 13 Mix Asphalt depending on selected schedules, Class '/2 inch, PG 64-22, two inch (2")thick, on <br /> 14 selected City Streets, including grinding, utility adjustments, such as manhole, catch basin, I <br /> 15 inlet, valve box, monument case and cover, striping, channelization, traffic induction loops.*** <br /> 16 and other work, all in accordance with the attached Contract Plans, these Contract Provisions, <br /> 17 and the Standard Specifications. <br /> 18 <br /> 19 1-01.DOCX <br /> 20 Definition and Terms <br /> 21 1 22 1-01.3.RTF <br /> 23 1-01.3 Definitions <br /> 24 (January 4, 2016 APWA GSP) I <br /> 25 <br /> 26 Delete the heading Completion Dates and the three paragraphs that follow it, and replace <br /> 27 them with the following: <br /> 28 <br /> 29 Dates <br /> 30 Bid Opening Date I <br /> 31 The date on which the Contracting Agency publicly opens and reads the Bids. <br /> 32 Award Date <br /> 33 The date of the formal decision of the Contracting Agency to accept the lowest I <br /> 34 responsible and responsive Bidder for the Work. <br /> 35 Contract Execution Date <br /> 36 The date the Contracting Agency officially binds the Agency to the Contract. I <br /> 37 Notice to Proceed Date <br /> 38 The date stated in the Notice to Proceed on which the Contract time begins. <br /> 39 Substantial Completion Date <br /> 40 The day the Engineer determines the Contracting Agency has full and unrestricted <br /> 41 use and benefit of the facilities, both from the operational and safety standpoint, any <br /> 42 remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> 43 replacement of temporary substitute facilities, plant establishment periods, or <br /> 44 correction or repair remains for the Physical Completion of the total Contract. <br /> 45 Physical Completion Date <br /> 46 The day all of the Work is physically completed on the project. All documentation <br /> 47 required by the Contract and required by law does not necessarily need to be <br /> 48 furnished by the Contractor by this date. I <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 2 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 I <br />