My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 During nonworking hours equipment or materials shall not be within the WZCZ <br /> 2 unless they are protected by permanent guardrail or temporary concrete barrier. <br /> 3 The use of temporary concrete barrier shall be permitted only if the Engineer <br /> 4 approves the installation and location. <br /> I 5 <br /> 6 During actual hours of work, unless protected as described above, only <br /> 7 materials absolutely necessary to construction shall be within the WZCZ and <br /> I 8 only construction vehicles absolutely necessary to construction shall be allowed <br /> 9 within the WZCZ or allowed to stop or park on the shoulder of the roadway. <br /> 10 <br /> 11 The Contractor's nonessential vehicles and employees private vehicles shall not <br /> 12 be permitted to park within the WZCZ at any time unless protected as described <br /> 13 above. <br /> I 14 <br /> 15 Deviation from the above requirements shall not occur unless the Contractor <br /> 16 has requested the deviation in writing and the Engineer has provided written <br /> 17 approval. <br /> I18 <br /> 19 Minimum WZCZ distances are measured from the edge of traveled way and will <br /> 20 be determined as follows: <br /> I 21 <br /> Regulatory Distance From <br /> Posted Speed Traveled Way <br /> I (Feet) <br /> 35 mph or less 10 <br /> 40 mph 15 <br /> I 45 to 50 mph 20 <br /> 55 to 60 mph 30 <br /> 65 mph or greater 35 <br /> I 22 <br /> 23 Minimum Work Zone Clear Zone Distance <br /> 24 <br /> I 25 F1-07.23(1).OPT5.DOCX <br /> 26 (January 5, 2015) <br /> 27 <br /> 28 Lane closures are subject to the following restrictions: <br /> I29 <br /> 30 *** <br /> 31 SCHEDULE A <br /> I 32 <br /> 33 Evergreen Way - E Casino Rd To Holly Dr <br /> 34 No lane closures will be permitted between 5:30am and 7:00pm, except for casting <br /> I 35 adjustments. One Lane shall remain open in each direction between 7:00pm and <br /> 36 5:30am. Lane closures for plastic pavement marking and traffic loop work shall not <br /> 37 occur between the hours of 5:30am to 7:00pm. Lane closures for casting adjustments <br /> I 38 will not be permitted 2:00pm to 6:00pm and 9:00pm to 7:00am. <br /> 39 <br /> 40 Broadway - 15th St To 18th St <br /> I 41 No lane closures will be permitted between 5:30am and 7:00pm, except for casting <br /> 42 adjustments. One Lane shall remain open in each direction between 7:00pm and <br /> 43 5:30am. Lane closures for plastic pavement marking and traffic loop work shall not <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 27 OF 84 DIVISION T <br /> I <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.