My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 occur between the hours of 5:30am to 7:00pm. Lane closures for casting adjustments <br /> 2 will not be permitted 2:00pm to 6:00pm and 9:00pm to 7:00am. <br /> 3 <br /> 4 Casino Rd - 5th Ave W To Evergreen Way <br /> 5 No lane closures will be permitted between 5:30am and 7:00pm, except for casting <br /> 6 adjustments. One Lane shall remain open in each direction between 7:00pm and <br /> 7 5:30am. Lane closures for plastic pavement marking and traffic loop work shall not <br /> 8 occur between the hours of 5:30am to 7:00pm. Lane closures for casting adjustments <br /> 9 will not be permitted 2:00pm to 6:00pm and 9:00pm to 7:00am. <br /> 10 <br /> 11 Pecks Dr - Evergreen Way To Beverly Ln <br /> 12 *Work shall not be permitted while school is in session* <br /> 13 No lane closures or single lane alternating flagging operation will be permitted between <br /> 14 2:30pm and 5:30pm. Lane closures for plastic pavement marking work shall not occur <br /> 15 between the hours of 5:00am to 6:00pm. Lane closures for casting adjustments will <br /> 16 not be permitted 2:30pm to 6:00pm and 9:00pm to 7:00am. <br /> 17 <br /> 18 An early start variance has been obtained on behalf of the Contractor. The early start <br /> 19 time shall be requested and approved by the Engineer at the preconstruction <br /> 20 conference. <br /> 21 <br /> 22 SCHEDULE B <br /> 23 <br /> 24 Wetmore Ave -Alverson Blvd To 11th Street Seg (Except 7th — 10th) <br /> 25 No lane closures or single lane alternating flagging operation will be permitted between <br /> 26 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 27 <br /> 28 Colby Ave -Alverson Blvd To 10th St <br /> 29 No lane closures or single lane alternating flagging operation will be permitted between <br /> 30 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 31 <br /> 32 5th St -Wetmore Ave To Colby Ave <br /> 33 No lane closures or single lane alternating flagging operation will be permitted between <br /> 34 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 35 <br /> 36 5th St—Wetmore Ave To Rockefeller Ave <br /> 37 No lane closures or single lane alternating flagging operation will be permitted between <br /> 38 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 39 <br /> 40 6th St -Wetmore Ave To Colby Ave 111 <br /> 41 No lane closures or single lane alternating flagging operation will be permitted between <br /> 42 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 43 <br /> 44 7th St -Wetmore Ave To Colby Ave <br /> 45 No lane closures or single lane alternating flagging operation will be permitted between <br /> 46 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 47 <br /> 48 8th St -Wetmore Ave To Colby Ave <br /> 49 No lane closures or single lane alternating flagging operation will be permitted between <br /> 50 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 51 <br /> 52 9th St -Wetmore Ave To Colby Ave <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 28 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.