Laserfiche WebLink
I <br /> 1 No lane closures or single lane alternating flagging operation will be permitted between <br /> 2 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 3 <br /> 4 Alverson Blvd - Maulsby Ln To Rockefeller Ave <br /> I 5 No lane closures or single lane alternating flagging operation will be permitted between <br /> 6 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 7 <br /> I <br /> 8 9 Grand Ave - Alverson To 10th <br /> No lane closures or single lane alternating flagging operation will be permitted between <br /> 10 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> I 11 <br /> 12 Rockefeller Ave - 5th St To Alverson Blvd <br /> 13 No lane closures or single lane alternating flagging operation will be permitted between <br /> I 14 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 15 <br /> 16 SCHEDULE C <br /> 17 <br /> 1 18 Wetmore Ave Intersections — 5th St, 6th St, 11th St <br /> 19 No lane closures or single lane alternating flagging operation will be permitted between <br /> 20 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> I <br /> 21 <br /> 22 SCHEDULE D <br /> 23 <br /> I 24 Lowell Rd - Broadway To S 2nd Ave <br /> 25 Detour route will not be permitted 2:30pm to 6:00pm and 10:00pm to 6:00am, except <br /> 26 for pavement marking work. No lane closures or single lane alternating flagging <br /> I 27 operation will be permitted between 2:00pm and 6:00pm. Lane closures for plastic <br /> 28 pavement marking work shall not occur between the hours of 5:00am to 6:00pm. Lane <br /> 29 closures for casting adjustments will not be permitted 2:00pm to 6:00pm and 9:00pm <br /> 30 to 7:00am. <br /> 31 <br /> 32 An early start variance has been obtained on behalf of the Contractor. The early start <br /> 33 time shall be requested and approved by the Engineer at the preconstruction <br /> I 34 conference. <br /> 35 <br /> 36 SCHEDULE E <br /> I 37 <br /> 38 Beverly Ln - Pecks Dr To Sunset Ln <br /> 39 No lane closures or single lane alternating flagging operation will be permitted between <br /> I 40 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 41 <br /> 42 SCHEDULE F <br /> I 43 <br /> 44 33rd Ave W - 54th St SW To 52nd P1 SW <br /> 45 No lane closures or single lane alternating flagging operation will be permitted between <br /> ' 46 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 47 <br /> 48 52nd St SE - Ocean Ave To 33rd Ave W <br /> 49 No lane closures or single lane alternating flagging operation will be permitted between I <br /> 50 10:00pm and 7:00am. Casting adjustments will not be permitted 9:00pm and 7:00am. <br /> 51 <br /> 52 SCHEDULE G <br /> I53 <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 29 OF 84 DIVISION T <br /> IIIWORK ORDER 3751 MARCH 29,2021 <br />