My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2 1-07.24.RTF <br /> 3 1-07.24 Rights of Way <br /> 4 (July 23, 2015 APWA GSP) <br /> I 5 <br /> 6 Delete this section and replace it with the following: <br /> 7 <br /> I <br /> 8 9 Street Right of Way lines, limits of easements, and limits of construction permits are <br /> indicated in the Plans. The Contractor's construction activities shall be confined within <br /> 10 these limits, unless arrangements for use of private property are made. <br /> I 11 <br /> 12 Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of <br /> 13 way and easements, both permanent and temporary, necessary for carrying out the <br /> I 14 work. Exceptions to this are noted in the Bid Documents or will be brought to the <br /> 15 Contractor's attention by a duly issued Addendum. <br /> 16 <br /> Whenever any of the work is accomplished on or through property other than publicI17 <br /> 18 Right of Way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> 19 easement agreement obtained by the Contracting Agency from the owner of the private <br /> 20 property. Copies of the easement agreements may be included in the Contract <br /> 21 Provisions or made available to the Contractor as soon as practical after they have been <br /> 22 obtained by the Engineer. <br /> 23 <br /> I 24 Whenever easements or rights of entry have not been acquired prior to advertising, <br /> 25 these areas are so noted in the Plans. The Contractor shall not proceed with any portion <br /> 26 of the work in areas where right of way, easements or rights of entry have not been <br /> I 27 acquired until the Engineer certifies to the Contractor that the right of way or easement is <br /> 28 available or that the right of entry has been received. If the Contractor is delayed due to <br /> 29 acts of omission on the part of the Contracting Agency in obtaining easements, rights of <br /> I <br /> 30 31 entry or right of way, the Contractor will be entitled to an extension of time. The <br /> Contractor agrees that such delay shall not be a breach of contract. <br /> 32 <br /> 33 Each property owner shall be given 48 hours notice prior to entry by the Contractor. This <br /> I34 includes entry onto easements and private property where private improvements must <br /> 35 be adjusted. <br /> 36 <br /> I 37 The Contractor shall be responsible for providing, without expense or liability to the <br /> 38 Contracting Agency, any additional land and access thereto that the Contractor may <br /> 39 desire for temporary construction facilities, storage of materials, or other Contractor <br /> I 40 needs. However, before using any private property, whether adjoining the work or not, <br /> 41 the Contractor shall file with the Engineer a written permission of the private property <br /> 42 owner, and, upon vacating the premises, a written release from the property owner of <br /> I <br /> 43 44 each property disturbed or otherwise interfered with by reasons of construction pursued <br /> under this contract. The statement shall be signed by the private property owner, or <br /> 45 proper authority acting for the owner of the private property affected, stating that <br /> I 46 permission has been granted to use the property and all necessary permits have been <br /> 47 obtained or, in the case of a release, that the restoration of the property has been <br /> 48 satisfactorily accomplished. The statement shall include the parcel number, address, <br /> 49 and date of signature. Written releases must be filed with the Engineer before the <br /> 50 Completion Date will be established. <br /> 51 <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 31 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.