My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 The Contracting Agency has estimated and included in the Proposal, dollar amounts for <br /> 2 all items to be paid per force account, only to provide a common proposal for Bidders. All <br /> 3 such dollar amounts are to become a part of Contractor's total bid. However, the <br /> 4 Contracting Agency does not warrant expressly or by implication, that the actual amount <br /> 5 of work will correspond with those estimates. Payment will be made on the basis of the <br /> 6 amount of work actually authorized by Engineer. <br /> 7 <br /> I 8 1-09.8.GR1 <br /> 9 Payment For Material On Hand <br /> 10 <br /> Ii 1 1-09.8.INSTI.GR1 <br /> 12 The last paragraph of Section 1-09.8 is revised to read: <br /> 13 <br /> I 14 1-09.8.OPTI.GR1 <br /> __.., <br /> 15 (August 3, 2009) <br /> 16 The Contracting Agency will not pay for material on hand when the invoice cost is less <br /> 17 than $2,000. As materials are used in the work, credits equaling the partial payments for <br /> 18 them will be taken on future estimates. Each month, no later than the estimate due date, <br /> 19 the Contractor shall submit a letter to the Engineer that clearly states: 1) the amount <br /> 20 originally paid on the invoice (or other record of production cost)for the items on hand, 2) <br /> 21 the dollar amount of the material incorporated into each of the various work items for the <br /> 22 month, and 3) the amount that should be retained in material on hand items. If work is <br /> 23 performed on the items and the Contractor does not submit a letter, all of the previous <br /> I <br /> 24 material on hand payment will be deducted on the estimate. Partial payment for materials <br /> 25 on hand shall not constitute acceptance. Any material will be rejected if found to be faulty <br /> 26 even if partial payment for it has been made. <br /> I 27 <br /> 28 1-09.9(Payments).RTF <br /> 29 1-09.9 Payments <br /> I 30 (March 13, 2012 APWA GSP) <br /> 31 <br /> 32 Delete the first four paragraphs and replace them with the following: <br /> I 33 <br /> 34 The basis of payment will be the actual quantities of Work performed according to the <br /> 35 Contract and as specified for payment. <br /> I36 <br /> 37 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> 38 Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> I <br /> 39 performed on a monthly basis. A breakdown is not required for lump sum items that <br /> 40 include a basis for incremental payments as part of the respective Specification. Absent <br /> 41 a lump sum breakdown, the Project Engineer will make a determination based on <br /> I 42 information available. The Project Engineer's determination of the cost of work shall be <br /> 43 final. <br /> 44 <br /> 45 Progress payments for completed work and material on hand will be based upon <br /> 46 progress estimates prepared by the Engineer. A progress estimate cutoff date will be <br /> 47 established at the preconstruction conference. <br /> I 48 <br /> 49 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 50 commences the work, and successive progress estimates will be made every month <br /> ' 51 thereafter until the Completion Date. Progress estimates made during progress of the <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 37 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.