My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 work are tentative, and made only for the purpose of determining progress payments. <br /> 2 The progress estimates are subject to change at any time prior to the calculation of the <br /> 3 final payment. <br /> 4 <br /> 5 The value of the progress estimate will be the sum of the following: I <br /> 6 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of <br /> 7 work completed multiplied by the unit price. <br /> 8 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum <br /> 9 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 10 determination. <br /> 11 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site <br /> 12 or other storage area approved by the Engineer. <br /> 13 4. Change Orders—entitlement for approved extra cost or completed extra work as <br /> 14 determined by the Engineer. <br /> 15 <br /> 16 Progress payments will be made in accordance with the progress estimate less: <br /> 17 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 18 2. The amount of progress payments previously made; and <br /> 19 3. Funds withheld by the Contracting Agency for disbursement in accordance with the I <br /> 20 Contract Documents. <br /> 21 <br /> 22 Progress payments for work performed shall not be evidence of acceptable performance ' <br /> 23 or an admission by the Contracting Agency that any work has been satisfactorily <br /> 24 completed. The determination of payments under the contract will be final in accordance <br /> 25 with Section 1-05.1. <br /> 26 <br /> 27 1-09.9(1).GR1 <br /> 28 Retainage I <br /> 29 <br /> 30 1-09.9(1),INSTI.GR1 <br /> 31 Section 1-09.9(1) content and title is deleted and replaced with the following: <br /> 32 <br /> 33 1-09.9(1).OPTI.GR1 <br /> 34 (June 27, 2011) <br /> 35 Vacant <br /> 36 <br /> 37 1-10.GR1 <br /> 38 Temporary Traffic Control <br /> 39 <br /> 40 1-10.2.GR1 <br /> 41 Traffic Control Management <br /> 42 <br /> 43 1-10.2(1).GR1 <br /> 44 General <br /> 45 <br /> 46 1-10.2(1),INSTI.GR1 <br /> 47 Section 1-10.2(1) is supplemented with the following: , <br /> 48 <br /> 49 1-10.2(1).OPTI.GR1 <br /> 50 (January 3, 2017) ' <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 38 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.