My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 <br /> 3 D!Y1S1QN2.GR2 <br /> 4 � � Division 2 <br /> 5 Earthwork <br /> 6 <br /> 7 2-02.GR2 <br /> 8 Removal of Structures and Obstructions , <br /> 9 <br /> 10 2-02.3.GR2 <br /> 11 Construction Requirements , <br /> 12 <br /> 13 2-02.3(3).GR2 <br /> 14 Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> 15 <br /> 16 GLF 2-02.3(3)A.DOCX <br /> 17 2-02.3(3) A Removal of Cement Concrete Sidewalks <br /> 18 (******) <br /> 19 <br /> 20 For removal purposes, all concrete slabs that average 4 inches or less in <br /> 21 thickness shall be considered as sidewalk removal. <br /> 22 <br /> 23 Cement concrete sidewalk shall be removed by sawcutting at the nearest scribe <br /> 24 marks beyond the neat line limits subject to the following requirements: <br /> 25 <br /> 26 Removal shall be extended to a through joint or to the edge of the sidewalk if <br /> 27 within 4 feet of a neat line. <br /> 28 <br /> 29 The minimum width of new or remaining concrete walk shall be as follows: <br /> 30 I 31 Two feet when sidewalk is or will be supported on each side by properly <br /> 32 placed concrete walk or other improvement that will prevent the <br /> 33 sidewalk from shifting. <br /> 34 <br /> 35 Four feet when sidewalk is or will be bounded by earth planting strip. <br /> 36 <br /> 37 The depth of saw cut shall be a minimum of 2 inches. Saw cuts shall leave <br /> 38 straight edges and vertical faces. No diagonal cuts in sidewalk will be allowed <br /> 39 unless otherwise indicated on the drawings or directed by the Engineer. <br /> 40 <br /> 41 A concrete walk that is to remain in place will be protected from equipment <br /> 42 damage. <br /> 43 <br /> 44 Where sidewalk adjacent to a sidewalk opening is in poor condition, removal <br /> 45 shall be extended to the nearest through joint or scribe mark as may be directed <br /> 46 by the Engineer. <br /> 47 <br /> 48 Pavement breakers shall be approved by the Engineer before use. <br /> 49 <br /> 50 Temporary asphalt concrete sidewalk shall be included in the bid item, <br /> 51 "Removing Sidewalk". <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 42 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.