Laserfiche WebLink
' 2 <br /> 3 GLF 2-02.3(3)B DOCX <br /> 4 2-02.3(3)B Temporary Asphalt Concrete Sidewalk <br /> 6 <br /> 7 Temporary asphalt concrete sidewalk shall be placed by the end of each shift <br /> ' 8 after finishing connections to the junction boxes. <br /> 9 <br /> 10 Temporary asphalt concrete sidewalk shall be constructed of Commercial HMA <br /> 11 as specified in Section 5-04. The HMA will have a dense, uniform surface and <br /> 12 will fully retain its shape, grade, and shall be free of tripping hazards after <br /> 13 placement. <br /> 14 <br /> 15 Temporary asphalt concrete sidewalk shall be included in the bid item <br /> 16 "Removing Sidewalk". <br /> t 17 <br /> 18 <br /> 19 2-02.4.GR2 <br /> 20 Measurement <br /> ' 21 <br /> 22 2-02.4.INSTI GR2 <br /> 23 Section 2-02.4 is supplemented with the following: <br /> I 24 <br /> 25 CNH 2-02.4OPT3.DOCX <br /> ' 26 27 (******) <br /> Sidewalk removal will be measured by the square yard. The unit contract price shall be <br /> 28 full pay as described in this Section for removing sidewalk where shown in the Plans, <br /> 29 including sawcutting up to 6" in depth, removal of concrete panels entirely, restoration of <br /> 30 native vegetation disturbed by the operation, and all other Work necessary for the removal <br /> 31 of sidewalk panels and disposal of materials from the site. <br /> 32 <br /> 33 <br /> 34 2-02.5.GR2 <br /> 35 Payment <br /> 36 <br /> 37 2-02.5.INST2.GR2 <br /> 38 Section 2-02.5 is supplemented with the following: <br /> 39 <br /> 40 CNH 2-02.5.OPT16.DOCX <br /> ' 41 (******) <br /> 42 "Removing Sidewalk", per square yard. <br /> 43 <br /> i <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 43 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />