My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries Inc. 6/21/2021
>
Contracts
>
Capital Contract
>
Lakeside Industries Inc. 6/21/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 10:40:20 AM
Creation date
7/9/2021 10:08:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries Inc. 6/21/2021
Approval Date
6/21/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Jim Souder/Gael Fisk
Subject / Project Title
2021 Pavement Maintenance Overlay Project
Public Works WO Number
PW3751
Total Compensation
$2,881,595.60
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 • The proposed HMA mix design on WSDOT Form 350-042 with the seal and ' <br /> 2 certification (stamp & signature) of a valid licensed Washington State <br /> 3 Professional Engineer. <br /> 4 • The Mix Design Report for the proposed HMA mix design developed by a <br /> 5 qualified City or County laboratory that is within one year of the approval date.** I <br /> 6 <br /> 7 The mix design shall be performed by a lab accredited by a national authority such as I <br /> 8 Laboratory Accreditation Bureau, L-A-B for Construction Materials Testing, The <br /> 9 Construction Materials Engineering Council (CMEC's) ISO 17025 or AASHTO <br /> 10 Accreditation Program (AAP) and shall supply evidence of participation in the AASHTO: <br /> 11 resource proficiency sample program. I <br /> 12 <br /> 13 Mix designs for HMA accepted by Nonstatistical evaluation shall; <br /> 14 I <br /> 15 • Have the aggregate structure and asphalt binder content determined in <br /> 16 accordance with WSDOT Standard Operating Procedure 732 and meet the <br /> 17 requirements of Sections 9-03.8(2), except that Hamburg testing for ruts and I <br /> 18 stripping are at the discretion of the Engineer, and 9-03.8(6). <br /> 19 • Have anti-strip requirements, if any, for the proposed mix design determined in <br /> 20 accordance with AASHTO T 283 or T 324, or based on historic anti-strip and <br /> 21 aggregate source compatibility from previous WSDOT lab testing. <br /> 22 <br /> 23 At the discretion of the Engineer, agencies may accept verified mix designs older than 12 I <br /> 24 months from the original verification date with a certification from the Contractor that the <br /> 25 materials and sources are the same as those shown on the original mix design. <br /> 26 I <br /> 27 Commercial Evaluation Approval of a mix design for"Commercial Evaluation" will be <br /> 28 based on a review of the Contractor's submittal of WSDOT Form 350-042 (For <br /> 29 commercial mixes, AASHTO T 324 evaluation is not required) or a Mix Design from the I <br /> 30 current WSDOT QPL or from one of the processes allowed by this section. Testing of the <br /> 31 HMA by the Contracting Agency for mix design approval is not required. <br /> 32 I <br /> 33 For the Bid Item Commercial HMA, the Contractor shall select a class of HMA and <br /> 34 design level of Equivalent Single Axle Loads (ESAL's) appropriate for the required use. <br /> 35 I <br /> 36 5-04.2(2)A Vacant <br /> 37 <br /> 38 5-04.2(2)B Using Warm Mix Asphalt Processes I <br /> 39 The Contractor may elect to use additives that reduce the optimum mixing temperature <br /> 40 or serve as a compaction aid for producing HMA. Additives include organic additives, 111 <br /> 41 chemical additives and foaming processes. The use of Additives is subject to the <br /> 42 following: <br /> 43 I 44 • Do not use additives that reduce the mixing temperature more than allowed in <br /> 45 Section 5-04.3(6) in the production of mixtures. <br /> 46 • Before using additives, obtain the Engineer's approval using WSDOT Form 350- I <br /> 47 076 to describe the proposed additive and process. <br /> I <br /> 2021 PAVEMENT MAINTENANCE OVERLAY PAGE 48 OF 84 DIVISION T <br /> WORK ORDER 3751 MARCH 29,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.