Laserfiche WebLink
• <br /> ✓ CSO Tenant Improvement • IP 22 March 2019 <br /> Page 2 of 2 <br /> inch accessible route clearance (i.e., drinking fountains create obstruction) per <br /> ICC A117.1-09 Figure 404.2.3.2(e); note that it is anticipate the doors include <br /> closers and must meet the 48-inch clearance. <br /> R: Please see revised sheet A0.4. <br /> I have attached the emails as well for reference. <br /> I trust that the above responses will be sufficient to complete the review of this project. Should <br /> there be further questions or clarifications needed please do not hesitate to contact Clover <br /> Schuler at 425-885-4300 or via email at clover@magellanarchitects.com. <br /> Sincerely, <br /> Clover Schuler- Magellan Architects <br />