Laserfiche WebLink
I <br /> Refer to Appendix B-2 for the following information: 1 <br /> • Supplemental Environmental Sampling—North Puget Sound Behavioral Health — <br /> Treatment Center Addition by GeoTest Services, Inc., dated October 30, 2019 <br /> 7.0 Operation and Maintenance Manual <br /> Onsite stormwater management and conveyance systems are maintained and operated by the I <br /> owner. An Operation and Maintenance (O&M) Manual was developed for the permanent <br /> stormwater controls and is provided in Appendix E. The O&M Manual includes the following <br /> items: description of facilities, identification and description of maintenance tasks, frequency of <br /> each task, and maintenance activity logs. In addition, copies of Source Controls are included in <br /> the O&M Manual, also provided in Appendix E. <br /> 8.0 Conclusion I <br /> This analysis is based on data and records either supplied to or obtained by AHBL. These <br /> documents are referenced within the text of the analysis. The analysis has been prepared using <br /> procedures and practices within the standard accepted practices of the industry. <br /> AHBL, Inc. I <br /> Yi Yang, PE , <br /> Project Engineer <br /> YY/Isk I <br /> January 2020 <br /> Revised May 2020 <br /> Q:\2017\2170857\WORDPROC\Reports\20200507 Rpt(TIR)2170857.10.docx <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Stormwater Site Plan Report <br /> North Sound Behavioral Health Treatment 1:3 <br /> © : Q <br /> AHBL No.2170857.10 <br />