Laserfiche WebLink
i <br /> 4.4 Flow Control <br /> Flow control is required to match developed discharge durations to the existing condition <br /> durations for the range of pre-developed discharge rates from 50 percent of the 2-year peak flow <br /> up to the full 50 year peak flow. <br /> The project site is achieving the flow control standard implementing OSM methods, as follows: <br /> • Reducing impervious percent from existing to proposed. <br /> • Converting existing lawn to pasture by providing BMP T12.20 Post-Construction Soil <br /> Quality and Depth for all proposed landscaping. <br /> • Providing bioretention cells, which attenuate flows, allow for biological processes, provide <br /> evapotranspiration, and provide some infiltration. <br /> Refer to Table 1 above for inputs into the MGSFlood model. Refer to Appendices A-2 and A-3 for <br /> delineation of areas. Refer to Appendix C-1 for flow control calculations showing that the project <br /> meets the flow control standard at the point of compliance. <br /> 4.5 Stormwater Conveyance Analysis and Design <br /> Conveyance analysis and design is performed using the Autodesk Storm and Sanitary Analysis <br /> and the outputs from the MGSFlood model. Delineation of subbasins and modeling results are <br /> provided in Appendix D-1 and D-2. The system conveys the 25-year event and contains the 100- <br /> year event. <br /> 5.0 Stormwater Pollution Prevention <br /> The project does not require a Construction Stormwater General Permit (CSGP)from the DOE <br /> because the project site is less than 1 acre. The contractor will provide temporary BMPs per the <br /> Construction Stormwater Pollution Prevention Plan (CSWPPP) report and engineering drawings. <br /> A separate CSWPPP report will be provided in the final report. <br /> 5.1 Source Control of Pollution BMPs <br /> In addition to the temporary construction BMPs outlined in the CSWPPP report, the project will <br /> provide the following permanent Source Control of Pollution BMPs per Volume IV of the City <br /> Manual. <br /> Source Control BMPs: <br /> • Landscaping and Lawn/Vegetation Management. <br /> • Maintenance of Stormwater Drainage and Treatment Systems. <br /> • Parking and Storage of Vehicles and Equipment. <br /> • Roof/Building Drains at Manufacturing and Commercial Buildings <br /> 6.0 Special Reports and Studies <br /> Refer to Appendix B-1 for the following information: <br /> • Geotechnical Report—North Puget Sound Behavioral Health—Treatment Center Addition <br /> by GeoTest Services, Inc., dated November 16, 2018 <br /> Stormwater Site Plan Report <br /> North Sound Behavioral Health Treatment CMOS <br /> AHBL No.2170857.10 <br />