My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/07/14 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/07/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2021 3:57:40 PM
Creation date
7/15/2021 3:54:59 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item # B-124 — Disputes Review Board (DRB) Chairman Reimbursement. This new item is being <br />created to account for 50% of the costs for the DRB Chairman to be reimbursed to the City of Everett <br />by the contractor. The Contract required that in a dispute between the contractor (ICI) and owner <br />(COE), a DRB would be set up and that the chairman's costs would be split equally between the <br />contractor and the City of Everett but paid initially by the City of Everett. At the conclusion of the <br />DRB, the contractor is to reimburse the City of Everett 50% of the costs due to the chairman of the <br />DRB. <br />Total Cost of Change Order No. 26 <br />New Item B-122: $40,392.00 <br />New Item B-123: $ 4,223.00 <br />New Item B-124: $(24,768.00) <br />Total Cost: $19,847.00 <br />Exhibit C—Additional Contract Time: <br />There are 27.5 working days (all for additional work occurring after bridge erection) added to the <br />Contract in Change Order No. 26. <br />
The URL can be used to link to this page
Your browser does not support the video tag.