LIFT STATION # 24 EMERGENCY FORCE MAIN REPLACEMENT PROJECT, PHASE 2
<br />11/6/2012 UP3515
<br />ITEM #
<br />QTY
<br />UNIT
<br />BID ITEM DESCRIPTION
<br />UNIT PRICE
<br />TOTAL
<br />1
<br />0.5
<br />LS
<br />Mobilization
<br />$40,000.00
<br />$20,000.00
<br />2
<br />0.22
<br />LS
<br />Surveying
<br />$4,000.00
<br />$880.00
<br />3
<br />191
<br />HRS
<br />Traffic Control Labor
<br />$50.00
<br />$9,550.00
<br />4
<br />0.22
<br />LS
<br />Maintenance Protection and Traffic Control
<br />$12,000.00
<br />$2,640.00
<br />5
<br />0.22
<br />LS
<br />Street Cleaning and Sweeping
<br />$30,000.00
<br />$6,600.00
<br />6
<br />0
<br />LS
<br />Surface Restoration
<br />$5,000.00
<br />$0.00
<br />7
<br />0
<br />LF
<br />Sawcutting Pavement, Final Joint Cut, Up to 6-Inch
<br />Thickness
<br />$1.00
<br />$0.00
<br />8
<br />0
<br />LF
<br />Sawcutting Pavement, Final Joint Cut, Additional 1-Inch
<br />Thickness
<br />$2.00
<br />$0.00
<br />9
<br />0.22
<br />LS
<br />Trench Excavation Safety System
<br />$90,000
<br />$19,800.00
<br />10
<br />0.22
<br />LS
<br />Temporary Sedimentation and Erosion Control
<br />$13,000.00
<br />$2,860.00
<br />11
<br />0
<br />TON
<br />Foundation Material Class A
<br />$5.00
<br />$0.00
<br />12
<br />300.31
<br />TON
<br />Gravel Borrow
<br />$5.00
<br />$1,501.55
<br />13
<br />158.97
<br />TON
<br />Crushed Surfacing Top Course
<br />$13.00
<br />$2,066.61
<br />14
<br />912.28
<br />TON
<br />Crushed Surfacing Base Course
<br />$13.00
<br />$11,859.64
<br />15
<br />0
<br />TON
<br />HMA, Class B Patch
<br />$185.00
<br />$0.00
<br />16
<br />102.86
<br />TON
<br />Pavement Patch, Temporary
<br />$150.00
<br />$15,429.00
<br />17
<br />0
<br />LS
<br />Pavement Marking
<br />$5,000.00
<br />$0.00
<br />18
<br />0
<br />LF
<br />Cement Concrete Curb & Gutter
<br />$28.00
<br />$0.00
<br />19
<br />0
<br />SY
<br />Cement Concrete Sidewalk
<br />$45.00
<br />$0.00
<br />20
<br />660
<br />LF
<br />Sanitary Sewer Force Main Pipe, 20-Inch, HDPE, DR
<br />17, IPS, Including Fittings
<br />$75.00
<br />$49,500.00
<br />21
<br />0
<br />EACH
<br />Sewage Air Release Valve, 2-Inch
<br />$15,000.00
<br />$0.00
<br />22
<br />0
<br />LF
<br />36-Inch Steel Casing with 20-Inch HDPE Carrier Pipe,
<br />Installed by Boring & Jacking (Crossing Wetland)
<br />$1,500.00
<br />$0.00
<br />23
<br />0
<br />LF
<br />36-Inch Steel Casing with 20-Inch HDPE Carrier Pipe,
<br />Installed by Boring & Jacking (Crossing 112th St SE)
<br />$1,500.00
<br />$0.00
<br />24
<br />1
<br />LS
<br />Clearing and Grading
<br />$12,000.00
<br />$12,000.00
<br />25
<br />1
<br />LS
<br />Tree Removal
<br />$25,000.00
<br />$25,000.00
<br />26
<br />0
<br />FA
<br />Force Account
<br />$100,000.00
<br />$0.00
<br />27
<br />0.22
<br />LS
<br />Contractor Liaison
<br />$39,000.00
<br />$8,580.00
<br />28
<br />0.25
<br />LS
<br />North End Connection
<br />$30,000.00
<br />$7,500.00
<br />29
<br />0.30
<br />LS
<br />South End Connection
<br />$30,000.00
<br />$9,000.00
<br />30
<br />0
<br />FA
<br />Dewatering for Boring & Receiving Shafts & Casing
<br />Installation
<br />$50,000.00
<br />$0.00
<br />31
<br />0
<br />EACH
<br />Cement Concrete Curb Ramp, Type B
<br />$1,792.00
<br />$0.00
<br />32
<br />0
<br />EACH
<br />Cement Concrete Curb Ramp, Type C
<br />$1,792.00
<br />$0.00
<br />33
<br />0
<br />SY
<br />Cement Concrete Driveway Approach, Class 3,000
<br />$61.60
<br />$0.00
<br />34
<br />0
<br />LF
<br />Remove/Replace 12-Inch Storm Pipe
<br />TOTAL
<br />$204,766.80