Laserfiche WebLink
I <br /> I <br /> 1 <br /> project the area shall be cleared of all media and all debris including no <br /> Iremnants of ground up media. <br /> Q4 - The advertisement for bid (p. 4 of 222 in the specs) says the work to install <br /> I the media will be performed after January 1, 2022; Spec 01 1100-3 1.5 Work <br /> Sequence (p. 143 of 222) says that the trickling filter shall remain fully <br /> operational until November 1, 2021 but contractor can mobilize and begin <br /> 1 prep work prior to November 1, 2021. Please confirm what actual start dates <br /> are or if there is something that precludes work between November 1, 2021 <br /> and Jan 1, 2022. — The Trickling filter shall remain fully operational until <br /> I <br /> November 1st, 2021. City staff will begin flushing the filter on November <br /> 1st, 2021 and continue doing so until November 21st, 2021. The <br /> Contractor may begin work on the Trickling Filter the morning of <br /> INovember 22n , 2021. See Items 1 and 3 Above <br /> IQ5 - Reference General Conditions 16.2 Permits & Licenses (P. 133 of 222 of the <br /> specs) and Summary of Work— permits (spec 01 1100 — 3 1.6): Please advise <br /> if the Owner is paying for the permits or the Contractor is responsible for paying <br /> Ifor all permits? — The General Conditions, Article 16.2 states "Unless <br /> otherwise specified..." Specification 01 1100, page 3, Section 1.6 is <br /> correct- The Contractor shall be responsible to obtain and pay the cost <br /> Iof any applicable permits required to do the Work, and such costs shall <br /> be included in their Bid. <br /> I <br /> PRE-BID MEETING AGENDA AND SIGN-IN SHEETS <br /> IThe agendas and sign-in sheets from the Pre-bid meetings held on April 22nd, <br /> 2021 and April 29th, 2021 are attached. <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> 1 Addendum 1 Page 3 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />