My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 6/21/2021 Change Order 1
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 6/21/2021 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:34 AM
Creation date
7/16/2021 11:31:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
6/21/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0002362
Total Compensation
$84,394.48
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/22/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Sewer"0"Utility Upgrades <br /> Change Order No. 1 <br /> Change Order Effective Date: May 4,2021 <br /> CONTRACTOR •••interwcst Construction,*Inc. .. . <br /> r g <br /> By ,t.� Date: <br /> ,7 Officer <br /> Roy Swihart,Vicc President <br /> Exhibit A—Description of Changed Work <br /> Change Order#1 modifies thirty,(30),bid items and adds three, (3),new items to the contract as <br /> follows: <br /> Schedule A: -Modified Items <br /> Bid Item#4—Traffic Control Labor. Modify existing bid item#4 by adding 1,725 hours of Traffic <br /> Control Labor @ the unit price of$62.00/hour,resulting in a$106,950.00 contract price increase. <br /> Bid Item#5—Traffic Control—Off-Duty Police Officer. Modify existing bid item#5 by deducting <br /> $25,860.00 from this force account bid item,resulting in a($25,860.00)decrease to the contract <br /> amount. <br /> Bid Item#13—Foundation Material,Class A or B. Modify existing bid item#13 by deducting 191 <br /> tons of Foundation Material,Class A or B @ the unit price of$65.00/ton,resulting in a($12,415.00) <br /> contract price decrease. <br /> Bid Item#14—Crushed Surfacing Base Course. Modify existing bid item.#14 by adding 1,966 tons of <br /> Crushed Surfacing Base Course @ the unit price of$27.00/ton,resulting in a$53,082.00 contract price <br /> increase. <br /> Bid Item#16—Control Density Fill, Modify existing bid item#16 by deducting 67 cubic yards of <br /> Control Density Fill @ the unit price of$170.00/CY,resulting in a($11,390.00)contract price <br /> decrease. <br /> Bid Item#29—Side Sewer Replacement. Modify existing bid item#29 by deducting 14 each Side <br /> Sewer Replacements @ the unit price of$2,600.00/each,resulting in a($36,400.00)contract price <br /> decrease. <br /> Bid Item#37—Cement Concrete Pavement Base Type III(High Early Strength)For Trench Patch. <br /> Modify existing bid item#37 by adding 567 square yards of Cement Concrete Pavement Base Type <br /> III, (High Early Strength)For Trench Patch @ the unit price of$39.00/SY,resulting in a$22,113.00 <br /> contract price increase. <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.