My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 6/21/2021 Change Order 1
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 6/21/2021 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:34 AM
Creation date
7/16/2021 11:31:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
6/21/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0002362
Total Compensation
$84,394.48
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/22/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Sewer"0"Utility Upgrades <br /> Change Order No. 1 <br /> Change Order Effective Date; May 4,2021 <br /> • <br /> New Item 107—Deletion of Traffic Loop Installations @ 3711'&39`1'of Colby Avenue. Delete the <br /> installation of Traffic Loops under Bid Item#49 in the lump sum amount of$12,500.00 and Traffic <br /> Loops under Bid Item#50 in the lump sum amount of$6,000.00 for a combined contract price <br /> decrease in the amount of($18,500.00). <br /> New Item 108—Equitable Adjustment. Create new item#108 entitled,"Equitable Adjustment",in <br /> the agreed upon lump sum amount of$230,607.48,resulting in a$230,607,48 contract price increase. <br /> Schedule 13: -Modified Items <br /> Bid Item#64—Traffic,Control Labor. Modify existing bid item#64 by adding 1,073 hours of Traffic <br /> Control Labor®the unit price of$62.00/hour,resulting in a$66,526.00 contract price increase. <br /> Bid Item#65—Traffic Control—Of Duty Police Officer. Modify existing bid item#65 by deducting <br /> $13,200.00 from this force account bid item,resulting in a($13,200.00)contract price decrease. <br /> Bid Item#70—Saw Cutting Existing Pavement. Modify existing bid item#70 by deducting 1,600 <br /> linear feet of Saw cutting Existing Pavement @ the unit price of$5.00/LF,resulting in a($8,000.00) <br /> contract price decrease. <br /> Bid Item#72—Crushed Surfacing Top Course. Modify existing bid item#72 by deducting 446 tons of <br /> Crushed Surfacing Top Course @ the unit price of$40.00/ton,resulting in a($17,840,00)contract <br /> price decrease. <br /> Bid Item#73 —Foundation Material, Class A or B. Modify existing bid item#73 by deducting 100 <br /> tons of Foundation Material, Class A or B®the unit rate of$65.00/ton,resulting in a($6,500,00) <br /> contract price decrease. <br /> Bid Item#74—Crushed Surfacing Base Course, Modify existing bid item#74 by adding 1,620 tons of <br /> Crushed Surfacing Base Course @ the unit price of$25.00/ton,resulting in a$40,5000.00 contract <br /> price increase. <br /> Bid Item#96—Cement Concrete Pavement Base Type III(High Early Strength)For Trench Patch. <br /> Modify existing bid item#96 by adding 540 square yards of Cement Concrete Pavement Base Type <br /> III, (High Early Strength)For Trench Patch®the unit price of$36.00/SY,resulting in a$19,440.00 <br /> contract price increase. <br /> Bid Item#98—HMA,for Overlay. Modify existing bid item#98 by deducting 320 tons of HMA,for <br /> Overlay a the unit price of$110.00/ton,resulting in a($35,200.00) contract price decrease. <br /> Bid Item#99—Planing Bituminous Pavement(2-inch deep). Modify existing bid item#99 by <br /> deducting 2,022 square yards of Planing Bituminous Pavement(2-inch deep), at the unit price of$5.00 <br /> per square yard, resulting in a($10,110,00) contract price decrease. <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.