Shearer & Associates Inc. 7/2/2021 Change Order 1
>
Contracts
>
Capital Contract
>
Shearer & Associates Inc. 7/2/2021 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 1:26:39 PM
Creation date
7/16/2021 1:26:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer & Associates Inc.
Approval Date
7/2/2021
Department
Public Works
Department Project Manager
Richard Hefti/Bill Fisher
Subject / Project Title
WFP East Clearwell Roof Replacement
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003662
Total Compensation
$17,415.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: WFP East Clearwell Roof Replacement <br /> Change Order No. 01 <br /> Change Order Effective Date: June 18, 2021 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts.The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts,Washington State sales tax,if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to,this <br /> Change Order,the work described in Exhibit A,and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order,including,but <br /> not limited to, claims for equitable adjustment of time and compensation, delay,impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest,dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition,protest,dispute,claim,or Contract Claim that ends <br /> after the date of this Change Order,but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> 41101,F. <br /> or Ma 7�f <br /> y Clerk City Attorney <br /> �D�Date: -o2- 1 Date: �-� d( Date: 7 - Z - 2-1 <br /> Recommended By: <br /> Construction Project Engineer(if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> Waal_ <br /> Date: j-1¢-2/ Date: Date: D e: 6-2-1;a3 f2-1 <br /> Page 2 of 4 <br />