Laserfiche WebLink
h <br /> w ...71 <br /> / <br /> 1/2"SMOKE GRAY TINTED s o e s m I t <br /> J1 m LL 6'-9" / / CEDAIGLAS-R 2x4s THRU BOLT TO 2 8"TYP. • <br /> / <br /> \ C 0 X <br /> B4(, a a m / 1'-0" 5 3/4" 1'-6 1/4" / 2'-0' <br /> .D.,.<„ z_ m <br /> m Q w PROVIDE RUBBER GASKET v \./ <br /> ' <br /> / <br /> Q X O BETWEEN CEDAR AND /� _ <br /> `%" W ~ O O PLEXIGLAS AT EACH BOLT �} a r h I c to cts <br /> 2"STEEL C-RUNNER �f �, <br /> l SLOPE 1/4" PER FOOT, MIN. METAL FLASHING CAP 1928 43rd Ave E., Ste A <br /> Seattle , WA 98112 <br /> CEDAR '/ ' ( 2 0 6 ) 453 . 4053 <br /> O Cl I <br /> shoesmithcox. com <br /> v / - <br /> / _J METAL CLIPS <br /> k <br /> \ CEDAR 4x4 <br /> � <br /> :.-.1 w , 1 '.411111, - ALAG SCREWS <br /> p �° PER STRUCTURAL <br /> a COUNTERSINK <br /> 0 I- B INTO 4x6 <br /> FURR WALL OUT AS w <br /> REQUIRED TO ALIGN �' z CEDAR 4x6 <br /> WITH ADJACENT r_- <br /> z , ef, <br /> SOFFIT O 2"STEEL C-RUNNER <br /> \ <br /> t (2)LAYERS 1" ✓ <br /> GYPSUM LINER PANELS I <br /> (2)LAYERS 1" GYPSUM LINER PANELS 2"STEEL C-RUNNER <br /> 2"STEEL C-RUNNER0 bethany <br /> SEE 4& 16/A8.02 FOR - LAG SCREWS <br /> 4/A8.02 SIM. -' _�) <br /> f PER STRUCTURAL <br /> DRYVIT REPAIR AT ti w <br /> NEW CONSTRUCTION �/ COUNTERSINK INTO 4x6 <br /> or skilled nursing <br /> ,71- - <br /> X IF/ <br /> r additions <br /> I <br /> .�'" < ill �� <br /> �� r= -- ) 2235 Lake Heights Drive <br /> Everett, WA 98208 <br /> 2"STEEL C-RUNNER <br /> 1'-6" A A <br /> (2) LAYERS 1" GYPSUM LINER PANELS B4 / F <br /> F <br /> 2" STEEL C-RUNNER <br /> _ \ <br /> _____i\---- A <br /> ...\._ <br /> " \ TERMINATION OF 2-HOUR FIRE WALL TERMINATION OF 2-HOUR FIRE WALL TRELLISCMU WALL Bethany <br /> 19 , 0 @ <br /> 1 1 J 1 1/2" = 1'-0" <br /> of the Northwest <br /> NO. DATE REVISION <br /> A01.28.2019 DOH CRS RESPONSE#1 <br /> 5/8"TYPE X GYPSUM PANEL <br /> 2"C-RUNNER <br /> 2.5 LB LEAD FLASHING APPROVED SEALANT A°3°72019 <br /> DOH CRS RESPONSE#2 <br /> SLEEVE TO OVERLAP ROOF CONT. SEALANT <br /> PLYWOOD ROOF DECK PER CAULK SMOKE-TIGHT JOINT AS REQUIRED BY IBC FLASHING,TYP. S.S. CLAMP MECH. L ©03.29.2019 CITY RESPONSE#1 <br /> STRUCTURAL \ ) EQUIPMENT& -- PREFINISHED GALV. <br /> APIPE FLASHING COLLAR <br /> ,_. CONTINUE 1"GYP SHAFT LINER PANELS SUPPORTED BY 2" -f: I� PRE-FABRICATED .` RECEIVER W/COUNTER <br /> ,/ <br /> ��°`` H-STUDS TO BOTTOM OF PLYWOOD ROOF DECK CURB. SEE MECH 1 FLASHING. FACE NAIL w/ ©05.30.2019 CITY RESPONSE#2 <br /> �` I, ;I DRAWINGS. • I NEOPRENE WASHERS. <br /> 5/8"TYPE X GYPSUM PANEL - FIRE BLOCKING WITH MINERAL FIBER INSULATION Z <br /> - , , <br /> ALUMINUM CLIP <br /> 2 LAYERS 3/4" • <br /> j 4" LAP MIN. <br /> • + <N LINE OF CRIPPLE WALL (BEYOND)TO SUPPORT 1 / ROOFING EXT. PLYWD. � I� TERMINATION BAR <br /> i it� OVERFRAMED 2x8 JOISTS �� <br /> NAILER, SCREW <br /> � ► J� '�� TO PREFAB. CURB ♦ P.T. WOOD CANT STRIPS <br /> �: LINE OF EXISTING PLYWOOD BEYOND (REMOVED IN AREA `��\ ��`� ���� ,t; 17 ���� ���� '���� <br /> WHERE ROOFS OVERLAP TO ALLOW FOR VENTING ♦ ROOFING <br /> Oloirkt PROJECT MANAGER <br /> FIRE BLOCKING WITH SEE 16JA8.01 FOR TRANSITION FROM TPO ROOF TO SHINGLES ' <br /> 011,A111. <br /> LEVEL CURB WITH JS <br /> PROJECT ARCHITECT <br /> MINERAL FIBER INSULATION <br /> ALUMINUM CLIPS X X SIM CONTINUOUS <br /> TAPEREDPT4x6 // < "/ ' i //// / JS <br /> 1 WOODT J+ <br /> ROOF TRUSS J SHIM P 1 JCTTEAMMEMBERS <br /> i. <br /> TH 1 <br /> _ �. . .�:. <br /> a` q '� &JOIST SEE CHECK <br /> PLYW'D DECKS, <br /> STRUCTURAL. <br /> CONTINUE 1 GYP SHAFT LINER -- <br /> PANELS SUPPORTED BY 2" / lamb <br /> �/ �_ <br /> H-STUDS TO BOTTOM OF <br /> i <br /> PLYWOOD ROOF DECK <br /> .. -� �� �. _ -\ . . �. .. .� .� ARCHITECT SEAL <br /> 1 ' IR". \i ____ __,_--- --- r_ <br /> )( I I\/ <br /> 6 PIPE PENETRATION PRE-MANUFACTURED MECH. CURB <br /> 1 1/2" = 1'-0" 1 1/2" - 1' 0" 7534 <br /> REGISTERED <br /> Y ".. / C K SMOKE TIGHT JOINT AS REQUIRED ARCHITECT <br /> IA BY THE IBC <br /> FIRE BLOCKING WITH ' — : , . �— - - � -� / \I / EXTEND (2) LAYERS TYPE X GWB TO <br /> MINERAL FIBER INSULATION h `'` /\ _ \I r. / PLYWOOD ROOF DECKING- FIRE STOP AT <br /> ALUMINUM CLIP # 7 SPRAY 30 MIL ' <br /> J / TRUSS PENETRATIONS MECH DUCT-SEE MECH. JOHN A. SHOESMITH <br /> INTUMESCENT i — l 2x BLOCKING BETWEEN TRUSSES / STATE OF WASHINGTON <br /> COATING OVER4 \ / y i WRB <br /> TOP PLATE \\I / \ / )\ 2x PAINTED I )11 1 •d <br /> / \ SHEET METAL COUNTER FLASHING- <br /> I FIRE BLOCKING _ / / \ N N // ) ��- _ SEE MECH. <br /> \I / EXPOSED RAFTER TAILS, PAINT �!� <br /> ' � ; W/MINERAL FIBER , / \ � � <br /> INSULATION1 / i. p, I <br /> / 'N N / y ) -� EXPOSED SHEATHING, PAINT �, SEALANT CITY OF EVF_RETT <br /> ALUMINUM CLIP �I N // N / r )\ _/ g,f— <br /> / \ / `�, REVIEWED FOR PERMIT <br /> i \ / r ) 2x8 PAINTED �'� �_ 4" LAP MIN. <br /> \ / \ / �=- LAP CAP OVER CURB TO INT. &ATTACH TITLE <br /> )\` REMOVE EXISTING R 38 BATT � , z ), <br /> \ / \ / INSULATION IN AREA WHERE NEW AND v <br /> I i ) ` _� EXISTING ROOF OVERLAP 0\ 0 J01"- \ 1 EXTERIOR DETAILS <br /> is / 0 ifk . co-- <br /> i . <br /> t. <br /> ,------- -.-.--e' / - . <br /> • \ `I <br /> ROOFING <br /> EXISTING ROOF TRUSS <br /> i <br /> __MF <br /> 2x P.T. WOOD CURB i <br /> •�► PER ROOF PLAN4 PROJECT NO. <br /> ____,..„ <*'-:<"--, - ,, illil - _ . , , . _ . _ _ , , _, _. , . 1 1 " .,.., <br /> EXISTING ROOF TRUSS Y, 40 - _",., • <br /> .f . // //. //_/ 18.03-01 <br /> FIRE BLOCKING WITH NEW 5/8"TYPE X GWB ON RESILIENT NOTE: VERIFY DATE <br /> MINERAL FIBER INSULATION 1 FURRING CHANNELS PERPENDICULAR REQ'D DIMENSIONS 12/21/2018 <br /> / <br /> w/MECH. <br /> i litio <br /> LEVEL CURB WITH CONTINUOUS PROJECT NETWORK PATH <br /> ALUMINUM CLIP TO TRUSSES ON 16 O.C. IBB CONTRACTOR TAPERED PT WOOD SHIM <br /> FIRE BLOCKING WITH MINERAL FIBER <br /> F F INSULATION <br /> ALUMINUM CLIP t <br /> 1_1 <br /> ROOF FRAMING, SEE STRUCT. SHEET NUMBER <br /> CPI <br /> 0 TERMINATION OF 2-HR. WALL AT ROOF 0 TERMINATION OF 2-HR. WALL AT FLAT ROOF ROOF TERMINATION O XT. 2-HR. WALL MECHANICAL CURB <br /> 13C5)1 1/2"= 1'-0" 1 1/2" = 1'-0" 1 1/2"= 1'-0" 1 1/2" = 1'-0" . <br /> 03 <br /> COPYRIGHT©2019 shoesmith cox architects <br />