Laserfiche WebLink
1\/ <br /> SEE 4/A8.02 FOR DRYVIT REPAIR Ii 0 e Sm I t Ii <br /> -/-• AT NEW CONSTRUCTION <br /> - <br /> .' <br /> WALL TYPE B4 PER A2.03 W/ADD'L C 0 X <br /> E2 !?',> CONTINUE GYPSUM LINER CH-STUD WALL LAYER OF GWB ON INSIDE FACE <br /> TO OUTSIDE EDGE OF EAVE TO ALIGN WITH ADJACENT GWB ' c� <br /> , I ><_- _ 1• � arc i to cts Q <br /> � j <br /> �.�., _ _ _ �, 1928 43rd Ave E., Ste A <br /> f <br /> � 53 4053 <br /> v � � �' 10pr-� Seattle ,0 8 <br /> x._ . ° ._ .. .. oesmlthcox . com <br /> +�. '.:. rra•J"• J:•` :4..ki�:' ,.v�t`r ,.••.`'�. ai: °ar':*',Ax...+. �� 1 ,I 2 <br /> I4 Ch <br /> I I 1 1 B4 <br /> I4,. <br /> 3/4' <br /> \ I I <br /> I I (2) 1"GYPSUM LINER PANELS <br /> \ I I <br /> I I <br /> \ I I <br /> MAGNETIC HOLD-OPEN <br /> WIRED TO SMOKE DETECTOR <br /> VERIFY DEPTH AND BLOCK <br /> AS REQUIRED <br /> SWING CLEAR DOOR HINGE HANDRAIL <br /> 3'-10" DOOR IN OPEN POSITION <br /> WIN LEAR DOOR HINGE I I HOLLOW METAL FRAME \ <br /> V 8-2 TO FACE CLOSER <br /> S G CI I \ <br /> OF FINISH ( I I CLOSER 8'-0"TO FACE <br /> I, bethany <br /> .4. <br /> m HOLLOW METAL FRAME I I 3-10 DOOR IN OPEN POSITION <br /> ' `3/4"3/4" OF FINISH <br /> HANDRAIL - I) (D' <br /> IA <br /> a N HANDRAIL (2) 1" GYPSUM LINER PANELS '�y`�` skilled nursing <br /> Qw 4„ I I B4 <br /> ..___ a. \ <br /> additions <br /> `t II 2"STEEL C-RUNNE- 1 <br /> M �-- II 2235 Lake Heights Drive <br /> 3 3/8° it .�-. \ <br /> ' Q '� 7\ \__ I "', i WA 98208 <br /> 1A <br /> Everett,, <br /> 0 ‘,.-, .)A I >-<.-,_ *, i e'. -- - - - --:1 -- t e '°° ®hri mimes--'GtlF. <br /> x <br /> t <br /> MAGNETIC HOLD OPEN . <br /> DETECTOR • IIII j ��:_ :j �;r't� 4 i=rJr s> ,�i•y =44-;1 � u ` ; +'\ <br /> WIRED TO SMOKE C i <br /> /\ <br /> Q <br /> VERIFY DEPTH AND BLOCK (9 w F '�, °+ ?�r '` ` 7r Y �_ �4I <br /> AS REQUIRED <br /> cc w <br /> I LLI z p I 1 - <br /> -1 w CON NUE GYPSUM LINER CH-STUD WALL WALL TYPE B4 PER A2.03 <br /> • w TO OUTSIDE EDGE OF EAVE I <br /> 3'-10" DOOR IN OPEN POSITION ;I cn o <br /> I <br /> ' ? 2"STEEL C-RUNNER I 2"STEEL C-RUNNER <br /> I w p p _.___ SEE 4/A8.02 FOR DRYVIT REPAIR ' AGNETIC HOLD-OPEN <br /> i � <br /> z ~ ____-- <br /> AT NEW CONSTRUCTION WIRED TO SMOKE DETECTOR <br /> VERIFY DEPTH AND BLOCK Bathany <br /> I i ZO AS REQUIRED <br /> II:I II U <br /> I► I 90 MIN. FIRE WALL DOOR @ CORRIDOR 630 <br /> 11 I 11 1-1/2" = 1'-0" of the Northwest <br /> I .I I _ NO. DATE REVISION <br /> CLOSER (2) 1"GYPSUM LINER V I 01.28.2019 DOH CRS RESPONSE#1 <br /> • 11/ PANELS CITY RESPONSE#1 <br /> F • � , `C MAGNETIC HOLD-OPEN <br /> A03.29.2019 <br /> \ I' I ;.� r— WIRED TO SMOKE DETECTOR 05.30.2019 CITY RESPONSE#2 <br /> �' !'. �- F I —, VERIFY DEPTH AND BLOCK <br /> / POCKET DOOR PIVOT r AS REQUIRED <br /> II 1 I, SEE 4/A8.02 FOR DRYVIT D2 <br /> M 6111411 li <br /> REPAIR AT NEW CONST. D1 <br /> K "i_ . <br /> ` <br /> '.a,t..A:iP.°t.sa^ — _ — _ IM ll:-ww-iiiiiipt , /____i ,\ \ Y \\,/, \ / <br /> \I <br /> — , JP- 71,,,,X5 \( \7 ).7 \\, 4 Y Y \I/ Y" ' Y A ( k_) / 7 <br /> ,1--- , , <br /> �,�-- ,� / .> i - . . , _i 1 ,r-2, i‘ 1 i :1.. .i. / <br /> PROJECT MANAGER <br /> 1 <br /> HOLLOW METAL FRAME4\1 _ JS..S <br /> 2"STEEL C-RUNNER 1 1 PROJECT ARCHITECT <br /> Adii <br /> SWING CLEAR DOOR HINGE <br /> I I �S <br /> 2"STEEL -RU 1 1 R (2) 1 GYPSUM LINER PANELS <br /> A ' <br /> PROJECT TEAM MEMBERS <br /> TS <br /> jj 2" STEEL C-RUNNER 4" I I <br /> I '��� CHECK <br /> CLOSER I �3 <br /> • Ill <br /> �® <br /> REMOVE AND REPLACE I \\ I / <br /> /43/4(2) LAYERS 5/8"GWB AS I I <br /> REQ'D FOR NEW CONSTRUCTION I I 3'-10" DOOR IN OPEN POSITION <br /> I I CLOSER / <br /> 4; <br /> 1 I j NEW 2x4 STUD I I / ARCHITECT SEAL <br /> II HOLLOW METAL FRAME <br /> ° II {, HANDRAIL 7534 <br /> i HANDRAIL SWING CLEAR DOOR HINGE <br /> REGISTERED <br /> .\ <br /> f r <br /> ARCHITECT <br /> I. I HOLLOW METAL FRAME \ <br /> 3'-10" DOOR IN OPEN POSITION I I CLOSER 8'-0"TO FACE JOHN A. SHOESMITH <br /> (2) 1" GYPSUM LINER PANELS I I 3'-10" DOOR IN OPEN POSITION OF FINISH STATE OF WASHINGTON <br /> 2"STEEL C-RUNNER I I \ n <br /> +/-8'-3 1/2"TO FACE I I /4"3/4" <br /> / I <br /> D1 I � � , . <br /> _.�F1 OF FINISH � I I CITY OF ��s <br /> MAGNETIC HOLD-OPEN <br /> WIRED TO SMOKE DETECTOR ' F 4 <br /> VERIFY DEPTH AND BLOCK I ' I I I REVIEWED FOR PERMIT <br /> AS REQUIRED III 11 l i <br /> II # + ; l I <br /> / 1'. I � ' I N Aii.1111111.17-__ <br /> TITLE <br /> J2 I, I' \/ v ", . M2 � _ DOOR <br /> 1/2' <br /> i <br /> __ y •vII �_I ., . `• \ 4 <br /> �,,. <br /> M rF r <br /> 4 <br /> `}, r - ._,-.... a �: <br /> co DETAILS <br /> � d ll' � ,�"r„t�� ' �. a� � � <br /> i 1r; .' s..R <br /> \ '\/' - ' ' a' may, � � ` <br /> J � <br /> 1 • _ <br /> i .I •,,,�;�.—. �. ` f ...,;�..a .,,.. _._11 'W a,. Nee. 1 ` PROJECT NO. <br /> 3 ,� i ,•3 " " " " . ` - - ' - - -- ' ' . . _ ' - - - - - - <br /> G G1 18.03-01 <br /> I <br /> HANDRAIL ,}'$411111-t i l 2"STEEL C-RUNNER DATE <br /> D ' I WALL PE B4 PER A2.03 W/ CONTINUE GYPSUM LINER CH-STUD WALL 1 <br /> I k' 41, ADDE LAYER OF GWB ON TO OUTSIDE FACE OF EAVE I 12/21/2018 <br /> 8-2 TO FACE }I I ' INSID FACE TO ALIGN WITH I PROJECT NETWORK PATH <br /> OF FINISH 1+ I MAGNETIC HOLD-OPEN <br /> ADJA ENT GWB /\ . ,^ SEE 4/A8.02 FOR DRYVIT REPAIR <br /> ;� i AT NEW CONSTRUCTION WIRED TO SMOKE DETECTOR <br /> f VERIFY DEPTH AND BLOCK <br /> IAAS REQUIRED <br /> A A <br /> _l. �. �J.t SHEET NUMBER <br /> 17 <br /> 0 90 MIN. FIRE WALL DOOR @CORRIDOR 531 90 MIN. FIRE WALL DOOR @ CORRIDOR 530 <br /> 1-1/2"= 1-0" A10 . 04 <br /> COPYRIGHT©2019 shoesmith cox architects <br />