Laserfiche WebLink
FOUNDATION PLAN NOTES <br /> 1. GENERAL 2. FOUNDATIONS 3. SLABS <br /> 4. WALLS AND COLUMNS ABOVE <br /> 1.1. ELEVATION AT TOP OF SLAB SHALL BE PER ARCH. <br /> 2.1. EXCAVATE, BACKFILL,AND PREPARE SOILS AS REQUIRED PER STRUCTURAL GENERAL NOTES 3.1. TYPICAL SLAB ON GRADE SHALL BE 4" THICK WITH #3 @ 18" OC EACH WAY AT CENTER OF SLAB. 4.1. STRUCTURAL WALL STUDS AT THIS LEVEL SHALL BE AS FOLLOWS, UNO: (, <br /> ELEVATION AT TOP OF FOOTING SHALL BE 1'-6" BELOW TOP OF SLAB, UNO. AND GEOTECHNICAL REPORT. t � <br /> 3.2. UNLESS NOTED OTHERWISE IN A GEOTECH REPORT, SLAB-ON-GRADE SHALL BE PLACED OVER 6" EXTERIOR WALLS 2x6 @ 16" OC . <br /> FOOTING ELEVATIONS SHOWN ARE FOR CONTRACTOR CONVENIENCE AND BIDDING ONLY. 2.2. STEP FOOTINGS FOR UNDERGROUND PIPING AND AS REQUIRED PER TYPICAL STEPPED FOOTING OF COMPACTED, FREE-DRAINING,WELL GRADED SAND OR SAND &GRAVEL CAPILLARY BREAK. INTERIOR WALLS 2x6 @ 16" OC <br /> FINAL ELEVATIONS SHALL BE DETERMINED BY ON-SITE VERIFICATION BY SOILS ENGINEER, DETAIL. USE 10 MIL VAPOR BARRIER OVER CAPILLARY BREAK AT INTERIOR SPACES. DO NOT PUNCTURE AHL <br /> BUT SHALL NOT BE SHALLOWER THAN THOSE SHOWN ON THIS PLAN. VAPOR BARRIER. REPAIR ALL TEARS AND HOLES. SEE DETAIL SHEET S6.01 FOR TYPICAL WALL FRAMING REQUIREMENTS AND FOR TYPICAL <br /> REFER TO STRUCTURAL GENERAL NOTES FOR ADDITIONAL INFORMATION. SHEARWALL REQUIREMENTS. FRAME ALL SHEARWALL INTERSECTIONS PER TYPICAL DETAILS. 1201 First Avenue South, Suite 310 <br /> 3.3. PROVIDE CONTROL OR CONSTRUCTION JOINTS ON ALL COLUMN LINES,AT ALL RE-ENTRANT Seattle, Washington 98134 <br /> 1.2. GRID LINES ARE TO FACE OF STUD AND CENTERLINE OF COLUMN. REFER TO ARCHITECTURAL CORNERS, AND AT A MAXIMUM SPACING OF 30x SLAB THICKNESS. 4.2. USE (1) KING STUD AND (1)TRIMMER STUD AT EXTERIOR HEADERS AT THIS LEVEL, UNO. /\ 206-402-5156 www.1undopsahl.com <br /> DRAWINGS FOR DIMENSIONS NOT SHOWN. PLACE JOINTS IN A MANNER THAT DIVIDES THE SLAB INTO RECTANGULAR AREAS 400 SQUARE '-3 <br /> FEET OR LESS.AREAS SHALL BE APPROXIMATELY SQUARE AND HAVE NO ACUTE ANGLES. 4.3. ALL EXTERIOR WALLS SHALL BE CONSTRUCTED AS SW6 PER TYPICAL SHEAR WALL SCHEDULE, UNO. <br /> ALL JOINT LOCATIONS MUST BE APPROVED BY THE ARCHITECT PRIOR TO CONSTRUCTION. <br /> REFER TO TYPICAL SLAB JOINT DETAIL. 3 , 4.4. WALLS PARALLEL TO TRUSSES SHALL BE BRACED TO THE ROOF PER 9/S6.05. <br /> Engineer's Stamp <br /> A• OA, <br /> an_467:411 <br /> alrWra'Ato : 4 i Is, , <br /> VIW.:V <br /> 1. 24234 ;s44' <br /> e. „f . <br /> `'10 AL <br /> Project Title <br /> 0) <br /> C <br /> t 1 <br /> Lii <br /> AA BB CC DD EE FF GG HH JJ KK LL o o24' - 0" 8' - 11' 13' - 6' 13' - 6' 13' - 6' 13' - 6' 13' - 6' 13' - 6" 13' - 6" 13' - 6" 13' - 6" 91 " <br /> 3 0 12 <br /> i---- <br /> z <br /> 1 , —0 <br /> 1 10 0 A. ,A 0 0 0 0 1 A, <br /> ro JO' J'L +ro +ro 'L L �O ti ti ro ti ti e <br /> 1, 'L n <br /> II U, 41l q 1 1' /0 4 O O `L ti QJ7;,.;\ 53.02OJOJiti+ OJi OJ �" L+ ,�" �i/S3.02 tittit `L,/ / `tit `'L1 <br /> l <br /> N <br /> 53.02 I r - - - - + � (1) <br /> > <br /> _ Jg' Jg' I I TYP JI' �, ti r i 3 Q <br /> �� ,I ---- AI - i - ..- I .ZO I •O 11 ,UNO ,ZO �O`) j �QJ - l S3.02 ( /�Il J <br /> I I I 53.02 V / coJ W <br /> l_ <br /> L___ , ,- S I r'L i 1 �o ''� 1' - 6' W x 0 10" D ti I <br /> C O <br /> -�� 53.02 N ( �� tO $ �° +� `° OJ l ti+ ti /4.(0 <br /> >1�� n ,y ,„ GONG FTG,TYP UNO ��„ `, OJ 0 <br /> y �, /OIL <br /> I A. 0 C <br /> `� O� w 3 #4 LONGIT&#4 6 18" OC TRANS I <br /> , , 6, 7 <br /> o� y I Q <br /> 7Ir- <br /> \'`)6/' a c' TYP I l <br /> t <br /> U <br /> i � II a) ""C".3 L.r) L._ <br /> �� �------)., - <br /> 1 L i , �t���' ; �4 II LJ02 - y� <br /> 0 sw6 <br /> x'L 'L `L 51�V6 ti SW6 SW6 � SW6 � � � _ ( - � - _ � W <br /> I QJti �" OJti ,�" QJti ,�" OJti Nxti Jti �'P �Xti Jti 1xti J'L �Xti J'L �xti Jti \xti 4 1),41141 3 Project Information <br /> 4 Aft I <br /> x- 1 x- x- .ZO �UNO NNc)- `ZQ N' X' N ' I--- -- i '� cu S3.02 0 <br /> 1 <br /> 53.02 -�,� - % 53.02 L. I G� N Eck Project No. 18 098 01 <br /> L <br /> K‘---._ <br /> 2 <br /> �.� CD <br /> - ��. �: tt. - I - - f I- i 1-�-1 - (� - f�— -1 - -I- - Checked By BB <br /> FI <br /> I 56.0pvi g'+ /c° <br /> /� p+�` '56Cic� AFC` 2' 0" S x 1' 0" D CONC FTG ,L`L <br /> 1' 6" Wx0' 10" D <br /> • <br /> \ w/(3) 4 EA WAY BOT,TYP <br /> CONC FTG, TYP UNO '� I II I /� .� o Issue <br /> 1 MN <br /> OKm-- _ <br /> j / \ ► /'/ S3.01 .SO I I i i SLAB ON GRADE 2 <br /> G� i I I PER NOTE 3.1. ,Lco S3.02 ( PERMIT SET 12/21/2018 <br /> --- 1 I - - tit � T �2 DOH CRS RESPONSE#2 03/07/2019 <br /> __ � <br /> /$\ CITY RESPONSE#1 03/29/2019 <br /> �O 1111I Tr, ti I'ifir '� `O y ��' �' (10 A CITY RESPONSE#2 05/31/2019 <br /> 1:4 ( OG I; r O I J <br /> fliallialliggialligaL <br /> WOW Ai- <br /> - - - - - �'�� - ���-- ��� - --� J-- �A46, <br /> --i ---I I1 4 y6G� I- , 3 S3112/I - N ao <br /> �1 + + ��� 411S3.02 <br /> I 6 r 6' I -, I I I' 53.02 <br /> (-----" _J <br /> --1 1 02 <br /> '►! <br /> SLAB ON GRADE I A c6+r9 <br /> �'Jr, iX ��� <br /> LI PER NOTE 3.1. ICD <br /> ' 9 +6 �' +6 �c' <br /> I �- 53.02 S3.02 53.02 <br /> L 1 SLAB ON GRADE <br /> d c PER NOTE 3.1. <br /> _ 2'-0" SQ x 1'-0" D CONC FTG / <br /> SIM 9 w/(3)#4 EA WAY BOT ---/ <br /> 3 <br /> 02 Department Approval <br /> S3.02 EMBED & EPDXY LONGITCo <br /> REINF 4" MIN,TYP SIM f, <br /> (----- II I II II u u v u I' if A\ g��. 3 v� <br /> �,.,. <br /> (E) PLINTH &COL 53.02Co <br /> N <br /> ��� _ --- <br /> -- - ---- __ IE_� � � CITY OF EVERETT <br /> r (-----, _ _ <br /> _ _ <br /> (E) PLINTH &COL REVIEWED FOR PERMIT <br /> I 1 - - - — <br /> _ _ <br /> _ _ _ <br /> _ _ <br /> _ _ <br /> (-7 _ to <br /> II <br /> 11 1 _.. -_ I YI ) - — — - — — — — — — — — — — - i- p--- U' IUI II - - - - - <br /> LEGEND - - = sheet Title <br /> SHEAR WALL PER SHEAR WALL SCHEDULE � T '- Y '" <br /> SOUTH ADDITION <br /> SW# <br /> ----) <br /> ON S6.01 = FOUNDATION PLAN <br /> STRUCTURAL BEARING WALL PER TYPICAL - T rir r - <br /> WALL FRAMING ON S6.01 <br /> ♦--- HDU SIMPSON TENSION TIE HOLDOWN c <br /> USE (2) 2x MIN HOLDOWN STUDS; SEE S6.01 i 1I I I Ii:i Sheet Number <br /> K + t NUMBER OF KINGS PLUS TRIMMERS, UP <br /> FROM THIS LEVEL K„, _,_ <br /> S2 K <br /> FOUNDATION PLAN — SO ADDITION <br /> _ • O3� Scale. 1/8 = 1 0 <br /> North <br />