Laserfiche WebLink
EXHIBIT A <br /> Scope of Work <br /> Client Name: City of Everett <br /> Project Name: California Street Ped/Bike Corridor(CM-0420(024)) <br /> Exhibit Dated: April 7, 2021 TG: 1.20312.00 <br /> Scope of Services <br /> Transpo Group USA, Inc. (Consultant)will provide engineering services to the City of Everett(City)for the <br /> development and analysis of alternatives, public outreach, and design of bicycle and pedestrian <br /> improvements in the City of Everett, Washington. The City does not currently have a preferred alternative <br /> design for the corridor and is seeking assistance from the Consultant in identifying the preferred <br /> alternative. <br /> The Consultant will lead the project and work in coordination with subconsultants, AcutanzaSTS, Osborn <br /> Consulting, and KBA, Inc., to provide a consistent overall project delivery, including outreach, alternatives <br /> design and analysis and final design across all related engineering disciplines. The scope of services to <br /> be provided by these subconsultants is provided as an attachment to this Scope of Work. <br /> The Consultant work program is organized into four sequential phases: <br /> Phase 1. Preliminary Analysis and Design <br /> Phase 2. Design Engineering <br /> Phase 3. Bid Support Services <br /> Phase 4. Construction Engineering <br /> Each Phase is further broken down into Tasks as described below. <br /> Added services to the Scope of services described herein may require a negotiated fee and schedule <br /> modification between the Consultant and the City. The Consultant will notify the City as soon as possible <br /> of the anticipated impact of changes to project elements on fee and schedule. <br /> The City reserves the right to terminate consultant services at the end of each phase or task described <br /> below. This termination notice will be delivered in writing. Upon termination of services, the Consultant will <br /> deliver to the City all electronic files prepared for all tasks and phases preceding termination as described <br /> below. <br /> Project Definition <br /> The Consultant has developed this scope with the assumption that the specific project elements identified <br /> in the RFQ are the basis of design. The following describes the key project components. <br /> Segment A: California Street Multimodal Improvements <br /> Project Limits: Broadway and California Street intersection to Maple Street and California Street <br /> intersection. Approximately 2,500 linear feet. <br /> Project Elements: Provide a bicycle facility on or adjacent to California Street between the project <br /> limits. Bicycle facility shall consist of pavement markings, signage, wayfinding signage, and may <br /> include vertical elements (concrete or physical devices) in buffers, and stop control modifications. <br /> Provide sidewalk in any sidewalk gaps on both sides of the road within the project limits. Upgrade <br /> all ADA ramps within the project limits which do not meet current ADA standards. <br /> Segment B: California Street to Hewitt Avenue Connection <br /> Page 1 <br /> transpogroup 'r <br />