Laserfiche WebLink
Submittal of a PFA to WSDOT may require submittal of this design documentation.A separate design <br /> documentation will not be provided for the WSDOT and City's purposes. Formatting and design <br /> information requirements for the WSDOT PFA will govern the content provided by the Consultant for the <br /> design documentation. <br /> Consultant Deliverables <br /> • Technical memorandum (PDF format) of design documentation at 90% design <br /> • Technical memorandum (PDF format) of design documentation at 100% design <br /> 2.5-2 NEPA and SEPA Documentation <br /> As part of the project documentation, the Consultant will assist the City with completing NEPA and SEPA <br /> documentation that was initiated in Task 1-6.3. Updated information related to project details will be <br /> added to the categorical exclusion documentation provided to the City. <br /> The Consultant will respond to up to two (2) rounds of comments from WSDOT on the NEPA <br /> documentation and the City of Everett on the SEPA documentation of the project within this scope. <br /> Further comments may result in additional scope and fee. <br /> Consultant Deliverables <br /> • Draft and Final NEPA Documentation <br /> • Draft and Final SEPA Documentation <br /> 2.5-3 Cultural Resources <br /> Supporting the NEPA and SEPA documentation, as well as the geotechnical investigation, the Consultant <br /> will provide, through a subconsultant, cultural resources assessments and mitigation plans, if necessary, <br /> for any subsurface objects of significance discovered through the design in Phase 2. <br /> Task 2-6 100% Final Design <br /> The 100% package will include completed drawings, special provisions, and the final Engineer's estimate. <br /> The Consultant and subconsultants will address any final outstanding design issues and respond to <br /> comments. The 90% PS&E Plan submittal comments will be incorporated into the submittal. The <br /> Consultant will make no further changes to the documents and plan design following completion of this <br /> task without the approval of the City. <br /> Consultant Deliverables <br /> • Comment response letter/matrix from 90% submittal. <br /> • One electronic PDF copy of Final Plans. Each sheet shall be stamped and signed by the <br /> Consultant and the City project manager. <br /> • Cost estimate in Excel format. <br /> • Special provisions (except Division 1) in Word format. <br /> • Final electronic CAD files. <br /> Task 2-7 Public and Stakeholder Involvement <br /> During Phase 2, public and stakeholder involvement will be less than in Phase 1 but will still be an <br /> important component of the project. The City will continue to lead the process, and the Consultant and <br /> Page 13 <br /> transpopro:p jr <br />