Laserfiche WebLink
initial range of options and schedule. Our team will also develop an online survey linked to the City <br /> landing page and online open house.The survey will be available for approximately one month and help <br /> garner feedback from the public. The feedback will help refine the project goals/vision and gain initial <br /> feedback on a range of solutions and project elements.To reach our broadest audience,the online open <br /> house and survey will be promoted and advertised through the following outlets—Social Media <br /> (Nextdoor, Facebook, Twitter, and Instagram),advertised in the Everett Herald, and advertised on the <br /> City web pages.The online open house and survey will also be promoted during the first round of <br /> briefings. Graphic materials such as a PDF flyer will be made available to project stakeholders to <br /> promote the project to their stakeholders,for example, local churches,SnoPUD, Kaiser Permanente, <br /> Snohomish County BIKES Club, etc. <br /> Consultant Deliverables: <br /> • Project briefing kit <br /> • Draft and final versions of the online open house, online survey, and a project graphics/flyer <br /> • Draft and final media advertisements. <br /> Task 3—Alternative Selection Phase Specific Outreach. Update the briefing kit to reflect a narrowing of <br /> alternatives to move to a preferred solution.The briefing kit will also note how the solution reflects <br /> comment feedback and technical data.Assuming the COVID health restrictions are lifted or loosened, it <br /> is assumed that this next stage of outreach could use some in-person outreach. Our team will support <br /> advertising and promotion similar to the initial phase creating a project flyer and advertisements for <br /> inclusion in Social Media and paid media. Flyers with project information will also be made available at <br /> community gathering places such as churches, libraries,farmers' markets,and potentially the planned <br /> National Night Out.The team will support a single public outreach event to support the project. This <br /> event could be a walk and roll event on or near the project corridor, including information, hands-on or <br /> tactical urbanism, and information. Project partners will also be invited to participate in the event, <br /> including transit agencies, WSDOT, SnoPUD, and local businesses. An event plan would be prepared to <br /> confirm logistics and coordinate the development of materials and site preparation. <br /> Consultant Deliverables: <br /> • Updates to the briefing kit <br /> • Draft and final versions of an event plan <br /> • Draft event download <br /> Task 4-Summarize outreach. Summarize all outreach events, including events, agency, and community <br /> partner briefings, and comments collected. Include attachments such as the mailing list,specific <br /> comments, graphic materials and flyers, and photos. <br /> Consultant Deliverables: <br /> • Preliminary Draft, Draft, and Final version of the outreach summary and appendices. <br /> Acutanza STS 4/02/2021 <br />