My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Transpo Group USA Inc. 7/12/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Transpo Group USA Inc. 7/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2021 11:11:56 AM
Creation date
7/23/2021 11:10:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Transpo Group USA Inc.
Approval Date
7/12/2021
Council Approval Date
6/30/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
California St Pedestrian & Bicycle Corridor
Tracking Number
0002989
Total Compensation
$1,016,564.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Osborn Consulting, Inc. 4/7/21 <br /> Exhibit A, Attachment A-2: Drainage and Landscape <br /> Architecture <br /> scope of services <br /> for <br /> California Street Pedestrian and Bicycle Corridor <br /> Phase 1 <br /> Task 1-4.1 Drainage Alternatives Analysis <br /> Assessment of drainage impacts of sidewalk and bike facility concepts (up to 3 concepts on each of 3 <br /> segments as described in Exhibit A:Scope of Work; <br /> • Segment A: California Street Multimodal Improvements, <br /> • Segment B:California St to Hewitt Avenue Connection: Fulton, Pine, Maple Streets, or midblock <br /> alley connections between California Street and Hewitt Avenue. <br /> • Segment C: Hewitt Avenue to US 2 Multimodal Improvements. <br /> Assumptions: <br /> • The entire project resides in the combined sewer basin. <br /> • The assessments are limited to matching existing stormwater durations and peaks and no storm <br /> water treatment is required. <br /> • No detailed stormwater modeling or memorandum. <br /> • No quantity take offs or cost estimating. <br /> Deliverables: <br /> • Assessment of drainage impacts summarized in a memorandum. <br /> Task 1-4.2 Landscape Architecture Alternatives Analysis <br /> Concepts for landscape architecture treatments to accompany the alternatives, same segments as <br /> described above <br /> Assumptions: <br /> • No quantity take offs or cost estimating. <br /> • No photo realistic renderings are included. <br /> • Maximum of 9 hand sketches <br /> • One revision for each sketch and one meeting to review <br /> Deliverables: <br />
The URL can be used to link to this page
Your browser does not support the video tag.