Laserfiche WebLink
Osborn Consulting, Inc. 4/7/21 <br /> • Concepts to be summarized using hand sketches,with photos of similar treatment to provide <br /> clarity. <br /> Task 1-5 Preliminary (30%) Design <br /> Development of 30%design plans for the preferred alternative's drainage and landscape architecture <br /> features <br /> Assumptions: <br /> • Drainage design to be shown on 8 plan sheets at 20 scale, no profiles or details <br /> • Landscape architecture treatments—showing areas of plantings by zones and street tree <br /> locations to be shown on 4 plan sheets at 20 scale, with example photo of similar treatment <br /> when required for clarity, no details or site furnishings. <br /> • No planting schedule <br /> • No detailed stormwater modeling or memorandum. <br /> • No specifications <br /> Deliverables: <br /> • Drainage 30%design plans <br /> • Landscape Architecture 30% design plans <br /> • Drainage 30% cost estimate <br /> • Landscape Architecture 30%cost estimate <br /> Phase 2 <br /> Task 2-2.1 60% and 90% Design (Drainage) <br /> Development of 60%and 90% design plans, Specification and Cost Estimate (PS&E) for the preferred <br /> alternative's drainage approach. Drainage design to be shown on 8 plan sheets with pipe profiles at 20 <br /> scale, 2 detail sheets for non-standard items. <br /> Assumptions: <br /> • Standard details (City of Everett and WSDOT)will referenced on the detail sheets, not included. <br /> • All design plans shall conform with City of Everett Design and Construction Standards and CAD <br /> standards as described in Exhibit A. <br /> • Edits to the City's Special Provisions will be based on the current year edition of WSDOT <br /> Standard Specifications. <br /> • Cost estimate to include a justification of quantity and unit price <br /> • Utility conflict can be resolved at the point of conflict with simple adjustment of the utilities or <br /> storm drainage locations. Relocating utilities is not included. <br /> • There will only be minor changes to the project design after the 90%submittal. <br />