My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Transpo Group USA Inc. 7/12/2021
>
Contracts
>
6 Years Then Destroy
>
2023
>
Transpo Group USA Inc. 7/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2021 11:11:56 AM
Creation date
7/23/2021 11:10:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Transpo Group USA Inc.
Approval Date
7/12/2021
Council Approval Date
6/30/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
California St Pedestrian & Bicycle Corridor
Tracking Number
0002989
Total Compensation
$1,016,564.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Osborn Consulting, Inc. 4/7/21 <br /> Deliverables: <br /> • PDF and electronic CAD files for Drainage 60%and 90% design plans <br /> • Specifications and cost estimate (PDF,Word file for specifications, Excel file for cost estimate) <br /> • Stormwater Site Plan 60%and 90% (PDF and electronic CAD files) <br /> • Draft SWPPP, Draft (60%) and Final (90%) (PDF) <br /> Task 2-2.2 60% and 90% Design (Landscape Architecture) <br /> Development of 60%and 90% design plans, Specification and Cost Estimate(PS&E) for the preferred <br /> alternative's approved landscape architecture features. <br /> Planting plan and street tree plan, showing planting zones and tree locations up to 60%; plant locations <br /> and plant types for 90%;specifications for plant care and establishment, including instructions for truck <br /> or hand watering. Landscape architecture to be shown on 4 plan sheets at 20 scale,with 3 detail sheets <br /> for non-standard details. <br /> Assumptions: <br /> • Standard details (City of Everett and WSDOT)will referenced on the detail sheets, not included. <br /> • All design plans shall conform with City of Everett Design and Construction Standards and CAD <br /> standards as described in Exhibit A. <br /> • Edits to the City's Special Provisions will be based on the current year edition of WSDOT <br /> Standard Specifications. <br /> • Cost estimate to include a justification of quantity and unit price <br /> • No sketches or photo realistic renderings are included. <br /> • There will only be minor changes to the project design after the 90%submittal. <br /> • A list of acceptable and available street furniture will be provided by the City. <br /> • Street trees shall be per the City approved street tree list. <br /> • Irrigation design not included <br /> Deliverables: <br /> • PDF and electronic CAD files for Landscape Architecture 60%and 90% design plans <br /> • Specifications and cost estimate 60%and 90% (PDF,Word file for specifications, Excel file for <br /> cost estimate) <br /> Task 2-6.1 100% Final Design (Drainage) <br /> Development of 100%design plans, Specification and Cost Estimate (PS&E) for the preferred <br /> alternative's drainage approach. Drainage design to be shown on 8 plan sheets with pipe profiles at 20 <br /> scale, 2 detail sheets for non-standard items. <br /> Assumptions: <br /> • Standard details (City of Everett and WSDOT)will referenced on the detail sheets, not included. <br />
The URL can be used to link to this page
Your browser does not support the video tag.