Laserfiche WebLink
Page 3 of 5 <br />2. COST ESTIMATE (TIME AND MATERIALS): <br />Description Estimate <br />Professional Labor <br />Surface Soil and Derelict Drum Characterization and Offsite Disposal $4,861 <br />Compliance Groundwater Monitoring, Additional Quarterly Event $2,699 <br />Regulatory Support $5,817 <br />Subtotal Labor Estimate $13,377 <br />Reimbursables <br />GeoEngineers Equipment and Mileage $257 <br />Subcontracted Soil and Drum Removal and Disposal and Subcontracted Chemical Analysis $9,956 <br />Subcontracted Chemical Analysis, Additional Quarterly Groundwater Monitoring Event $4,370 <br />Subtotal Reimbursables $14,583 <br />Grand Total $27,960 <br />3. CHANGE ORDER/CHANGES: (To be completed, initialed and dated by Project Engineer and <br />GeoEngineers prior to work being performed). <br />4. SCHEDULE: We anticipate the services outlined under this scope of work will extend over approximately <br />2 months from authorization to completion of compliance groundwater monitoring. <br />5. TERMS AND CONDITIONS AND HOURLY BILLING RATES ARE INCLUDED AS EXHIBIT B. <br />6. ACCEPTED: <br />/ku <br />City of Everett GeoEngineers by Dana Carlisle, Principal <br />Date <br />06/09/2021 <br />Date <br />GeoEngineers, Inc. <br />File No. 0661-108-03 <br />