Interwest Construction Inc. 7/19/2021 Change Order 26
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/19/2021 Change Order 26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:11 AM
Creation date
7/30/2021 10:13:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/19/2021
Council Approval Date
7/7/2021
Department
Public Works
Department Project Manager
Heather Griffin/Keith Alewine
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
26
Tracking Number
0000801
Total Compensation
$19,847.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A—Description of Changed Work <br /> This Change Order No. 26 adds three (3) new items to Schedule B as shown below. <br /> Item #B-122—Architectural Railing Systems-HSS Support for Guard Railing System <br /> Modifications. Add new item# B-122 entitled, "Architectural Railing Systems-HSS Support for <br /> Guard Railing System Modifications" at the agreed to Lump Sum Price of$40,392.00, resulting in a <br /> Contract increase of$40,392.00. <br /> Item #B-123—Bridge Lighting Router/Antenna Modifications. Add new item#B-123 entitled, <br /> "Bridge Lighting Router/Antenna Modifications" at the agreed to Lump Sum Price of$4,223.00, <br /> resulting in a Contract increase of$4,223.00. <br /> Item #B-124—Disputes Review Board (DRB) Chairman Reimbursement. Add new item#B-124 <br /> entitled, "Disputes Review Board (DRB) Chairman Reimbursement" at the Contract requirement of <br /> 50% of total Chairman costs, by crediting $24,768.00 to the City of Everett, resulting in a Contract <br /> decrease of$24,768.00. <br /> Justification <br /> Item #B-122—Architectural Railing Systems-HSS Support for Guard Railing System <br /> Modifications. This new item is being added to account for all field and fabrication shop costs <br /> associated with modifying the architectural railing systems on the bridge. Following the concrete <br /> placement for the bridge decks, the steel stringers supporting the concrete decks deflected more than <br /> anticipated. Since the railing frames were already designed and fabricated, the straight frames needed <br /> to be modified to fit the final curved surface caused by the additional deflection. This modification <br /> work required transporting material to the contractor's fabrication shop, cutting frame material, <br /> redesigning the railing support system to fit, new layout of railing support system, acquiring new <br /> materials, welding materials, and transporting modified railing support system to the jobsite and <br /> installing the modified railing support system. This additional work required 27.5 working days. <br /> Item #B-123—Bridge Lighting Router/Antenna Modifications. This new item is being created to <br /> account for costs for a new antenna, and to relocate the router and antenna for the bridge lighting in a <br /> location that allows the signal to reach all areas of the bridge, so that all of the color lighting may be <br /> used to illuminate the lower parts of the bridge. These modifications will enable the colored bridge <br /> lighting to work throughout the entire length of the bridge. <br />