• •Lei 1:] :1
<br />PROJECT ADDRESS: 1020 North Broadway
<br />Everett, WA 98403
<br />ABBREVIATIONS PROJECT SUMMARY
<br />AB ANCHOR BOLT H HIGH / HEIGHT (R) RELOCATED
<br />PARCEL NUMBER
<br />29051700203200,& 00385422201402
<br />LEGAL DESCRIPTION
<br />Section 17 Township 29 Range 05 Quarter NW - COMB FOR TAX PURP ONLY - BAAP 1139FT E OF NW COR SW1/4
<br />NW1/4 TPB TH S 222.98FT TH E 194.07FT TH N 223.41 FT TH W 196.17FT TPB LESS ST RD 1 LESS TH PTN LY E OF ST
<br />RD 1 LESS N 122.98FT THOF TGW TH PTN SW1/4 NW1/4 SD SEC DAF BEG AAP OF INT OF PLL LN 117.33FT S OF SD
<br />SUB & NWLY MGN S/HY 1 TH WLY ALG SD PLL LN WH IS 117.33FT S OF N LN SD SUB 102.08FT M/L TO E MGN
<br />BRDWY TH NLY ALG E MGN BRDWY 25FT TH ELY ALG A LN 92.33FT S OF N LN SD SUB TAP 49.25FT FIR E MGN
<br />BRDWY TH N ALG A LN PLT E MGN BRDWY 40FT TAP 52 .33FT S OF N MGN SD SUB TH ELY ALG A LN 52.33FT S OF
<br />N LN SD SUB FOR 9OFT M/L TO ITS INT WITH NWLY MGN S/HY 1 TH SWLY ALG NWLY MGN SD S/HY 80FT M/L TO
<br />POB LESS SLY 25FT THOF & TGW PTN SW1/4 NW1/4 SD SEC BEG INT N LN SW1/4 NW1/4 & E MGN BRDWY TH E
<br />ALG N MGN SD SUB 49.25FT TH S 92.33FT ALG A LN PLT E MGN BRDWY TAP 25FT NLY OF PLL LN 177.33FT S OF N
<br />LN SD SUB TH ELY PLT N LN SD SUB 49.25FT TO E MGN BRDWY TH NLY ALG SD ELY MGN BRDWY 92.33FT TO INT
<br />N LN SD SUB & POB & TGW S 25FT OF FDT BEG NECOR SW1/4 NW1/4 TH S01"19 15W ALG E LN SD SW1/4 NW1/4
<br />26.2FT TO INT NWLY R/W LN ST HWY 1 TH SWLY ALG SD R/W LN 117.33FT TH W 102.08FT TO INT E RAN LN BRDWY
<br />AVE TH N ALG E R/W LN OF BRDWY 122.98FT TO S LN BLK 222 BAILEY ADD TH ELY ALG S LN SD BLK 222 TO TPB &
<br />ALSO TGW BAAP 221.90FT N OF SE COR N1/2 SW1/4 NW1/4 TH W 148.87FT TH N 222.98FT TH E 148. 87FT TH S
<br />222.98FT POB LESS ST RD 1 LESS ALL TH PTN LY E ST RD NO 1
<br />AC AIR CONDITIONING HB HOSE BIB R RADIUS OR RISER (PIPING) NEW CONSTRUCTION OF A 124 UNIT RESIDENTIAL BUILDING ON A PREVIOUSLY DEVELOPED SITE IN EVERETT, WA. BAILEYS ADD TO EVERETT BLK 222 D-02 - W 19.25FT OF LTS 14 TO 16 INCBLK 222
<br />ACC ACCESSIBLE HC HOLLOW CORE RA RETURN AIR THE BUILDING WILL CONSIST OF 5 LEVELS; 4 LEVELS OF RESIDENTIAL OVER 1 LEVEL OF PARKING, APPROXIMATELY
<br />ACOUS ACOUSTICAL HCP HANDICAPPED RAID RADIUS 60,660SF, WITH 62 PARKING SPACES AND 97 BIKE PARKING SPACES. SITE AREA: 22,651 SF (20,473 SF + 2,178 SF) THESE DOCUMENTS HAVE NOT BEEN
<br />AD AREA DRAIN HDW HARDWARE RB RESILIENT BASE APPROVED FOR THE ISSUANCE OF
<br />ADJ ADJUSTABLE HS HEAT STRENGTHEND RCP REFLECTED CEILING PLAN PUBLIC WORK, MECHANICAL, FIRE
<br />AFF ABOVE FINISH FLOOR (GLASS) RD ROOF DRAIN PERMIT INFORMATION SUPPRESSION, ELECTRICAL OR
<br />ALT ALTERNATE HM HOLLOW METAL RECOM RECOMMENDED -- PLUMBING PERMITS
<br />ALUM ALUMINUM (STEEL FRAME) RECPT RECEPTACLE
<br />ANCH ANCHOR HNDRL HANDRAIL REC RECESSED
<br />ANOD ANODIZED HO HOLDOPEN REF REFERENCE APPLICABLE CODES:
<br />ACP ACOUSTICAL CEILING PANEL HORIZ HORIZONTAL REFL REFLECTED / REFLECTIVE / Building Permit B1804-011 CITY OF EVERETT
<br />APPD APPROVED HT HEIGHT REFLECT SEPA SEPA#17-013 -CITY OF EVERETT ZONING CODE REVIEWED FOR PERMIT
<br />APPROX APPROXIMATE HVAC HEATING, VENTILATION, REFR REFRIGERATOR -2015 INTERNATIONAL BUILDING CODE (IBC)
<br />ARCH ARCHITECTURAL AIR CONDITIONING REG REGISTER -2015 INTERNATIONAL FIRE CODE (IFC)
<br />AUTO AUTOMATIC HW HOT WATER REINF REINFORCED / REINFORCING -2015 INTERNATIONAL MECHANICAL CODE (IMC)
<br />AV AUDIO VISUAL HYDR HYDRAULIC REL RELOCATE SEPARATE PERMITS -2015 UNIFORM PLUMBING CODE (UPC)
<br />AVB AIR VAPOR BARRIER REM REMOVABLE ------ -2014 NATIONAL ELECTRICAL CODE (NEC) (NFPA 70) + PART 1 AND PART 3
<br />ID INSIDE DIAMETER REQ REQUIRE / REQUIRED -2009 WASHINGTON CITIES ELECTRICAL CODE Subject TO Fl ld Inspoetion
<br />BD BOARD IN INCH RESIL RESILIENT 1. ELECTRICAL PERMIT -AMERICANS WITH DISABILITIES ACT [ADA] & FAIR HOUSING ACT [FHA] BYThe Fire Marshal
<br />BLDG BUILDING INCL INCLUDED / INCLUDING REV REVISION / REVISED 2. FIRE ALARM PERMIT -ICC/ANSI 117.1 - 2009
<br />BM BEAM INFO INFORMATION RM ROOM 3. FIRE SPRINKLER PERMIT
<br />BOT BOTTOM INSUL INSULATION RO ROUGH OPENING 4. PLUMBING PERMIT WASHINGTON STATE CODE AMENDMENTS
<br />BSMT BASEMENT INT INTERIOR RTD RATED 5. MECHANICAL PERMIT -2015 WASHINGTON STATE ENERGY CODE
<br />BT BOLT INV INVERT RTG RATING 6. ELEVATOR PERMIT -APPLICABLE ZONING AND CITY CODES
<br />IPS INTERNATIONAL PIPE RWL RAIN WATER LEADER
<br />CAB CABINET STANDARD A building footprint and lot layout for the project shall be provided to the Fire Marshal's Office on CD/DVD
<br />CAT CATEGORY S SOUTH - ---- ---
<br />CB CATCH BASIN JAN JANITOR SA SUPPLY AIR DEFERRED SUBMITTALS ZONING: BMU - BROADWAY MIXED USE
<br />CBU CEMENTITIOUS BACKER JC JANITOR'S CLOSET SAF SELF -ADHERED FLASHING
<br />UNIT JST JOIST SAM SELF -ADHERED MEMBRANE -- -
<br />CER CERAMIC JT JOINT SAN SANITARY AIR ROOF ANCHORS OVERLAY ZONE: INSTITUTIONAL OVERLAY
<br />CIS CORNER GUARD SC SOLID CORE PRE-ENGINEERED STEEL STAIRS, CANOPIES, & GUARDRAILS
<br />CH CHILLER KIT KITCHEN SCHED SCHEDULE OCCUPANCY GROUPS: RESIDENTIAL R-2, AND PARKING S-2
<br />CHAN CHANNEL KO KNOCKOUT SD STORM DRAIN / PRE-ENGINEERED HOLD DOWN SYSTEMw
<br />CI CAST IRON SOAP DISPENSER TYPE OF CONTRUCTION: (4) STORIES TYPE V-A OVER (1) STORY 1-A
<br />CIP CAST IN PLACE LDG LANDING SECT SECTION
<br />CJ CONTROL JOINT LAM LAMINATE / LAMINATION STS SELF TAP METAL SCREW FIRE PROTECTION: SPRINKLERED PER NFPA 13
<br />CL CENTER LINE LAV LAVATORY SF SQUARE FEET/FOOT EXTERIOR VIEW
<br />CLG CEILING LB POUND SH SPRINKLER HEAD BUILDING AREA:
<br />CLR CLEAR LF LINEAR FOOT SHT SHEET - LEVEL 1 13,187 SF
<br />CNTR COUNTER LKR LOCKER SHR SHOWER LEVEL 2 11,942 SF
<br />CO CLEANOUT LN LINE SIM SIMILAR LEVEL 3 11,942 SF
<br />COL COLUMN LT LIGHT SM SHEET METAL OR LEVEL 4 11,942 SF
<br />CONC CONCRETE SQUARE METER LEVEL 5 11,942 SF
<br />COND CONDITION MACH MACHINE (METRIC DOCS) TOTAL AREA 60,955 SF
<br />CONN CONNECTION MAINT MAINTENANCE SND SANITARY NAPKIN
<br />CONT CONTINUOUS MATL MATERIAL DISPENSER LEVEL NUMBER OF TYPE B UNITS NUMBER OF TYPE -A UNITS UNIT NUMBER
<br />CONTR CONTRACTOR MAX MAXIMUM SP STANDPIPE LEVEL 1 0 0
<br />COORD COORDINATE MB MACHINE BOLT SPEC SPECIFICATION - LEVEL 2 29 2 213,228
<br />CORR CORRIDOR MDF MEDIUM DENSITY SPR SPRINKLER LEVEL 3 29 2 313, 328
<br />CT CERAMIC TILE FIBERBOARD SPKR SPEAKER y ���}t�� ,. _'� LEVEL 4 29 2 413,428
<br />CTR CENTER MEP MECHANICAL, ELECTRICAL, SQ SQUARE LEVEL 5 29 2 513, 528
<br />CTSK COUNTER SUNK PLUMBING SSE STRUCTURE SLAB >.-- - SUBTOTAL 116 8
<br />CW COLD WATER (PIPING) MDO MEDIUM DENSITY OVERLAY ELEVATION„ TOTAL UNITS: 124
<br />PLYWOOD SST STAINLESS STEEL
<br />D DEEP, DEPTH MECH MECHANICAL SSK SERVICE SINK UNITS:
<br />DBL DOUBLE MEMB MEMBRANE STA STATION MINIMUM 5% TOTAL TYPE A UNITS PER WA STATE 2015 IBC AMENDMENT
<br />DEG DEGREE MET METAL STD STANDARD 124 UNITS X 5% _ (6.2) 7 UNITS REQUIRED
<br />DEMO DEMOLITION MEZZ MEZZANINE STL STEEL
<br />DEPT DEPARTMENT MFR MANUFACTURER STLJST STEEL JOIST I
<br />DET DETAIL MH MANHOLE STOR STORAGE
<br />DF DRINKING FOUNTAIN MIN MINIMUM STRG STRINGER
<br />DIA DIAMETER MISC MISCELLANEOUS STRL STRUCTURAL
<br />DIFF DIFFUSER MS MACHINE SCREW SUBCATSUBCATEGORY
<br />DIM DIMENSION MTD MOUNTED SUSP SUSPENDED
<br />DISP DISPENSER MTG MOUNTING SYM SYMMETRICAL
<br />DMPF DAMPPROOFING MTL METAL SYS SYSTEM PROJECT LOCATION
<br />DN DOWN MULL MULLION
<br />DO DOOR OPENING T&G TONGUE AND GROOVE
<br />DR DOOR N NORTH T TREAD/THERMOSTAT
<br />DRN DRAIN NA NOT APPLICABLE TB TOWEL BAR
<br />DW DISHWASHER NC NOISE CRITERIA TIC TOP OF CURB
<br />DWG DRAWING NIC NOT IN CONTRACT TCONC TOP OF CONCRETE
<br />DWR DRAWER NO NUMBER TEL TELEPHONE OR TELECOM
<br />NOM NOMINAL TEMP TEMPERATURE
<br />E EXISTING NTS NOT TO SCALE TER TERRAZZO
<br />EA EAST TGB TOGGLE BOLT
<br />EJ EXPANSION JOINT OA OUTSIDE AIR THK THICKNESS
<br />EL ELEVATION OC ON CENTER THRES THRESHOLD
<br />ELEC ELECTRICAL OFCI OWNER FURNISHED, THRU THROUGH BUILDING ENCLOSURE
<br />ELEV ELEVATOR CONTRACTOR INSTALLED TKBD TACKBOARD
<br />EMERG EMERGENCY OFOI OWNER FURNISHED,
<br />TMPD TEMPERED --- --
<br />EP ELECTRICAL OWNER INSTALLED TO TOP OF (SEE OTHER WORD) THE SIGNED AND STAMPED BUILDING ENCLOSURE DRAWINGS CONTAINED WITHIN THE BUILDING PERMIT
<br />PANELBOARD OFF OFFICE TOS TOP OF SLAB / DRAWINGS ARE APPROPRIATE TO SATISFY THE REQUIREMENTS OF RCW 64.55.005 THROUGH 64.55.090
<br />EQ EQUAL OH OVER HEAD TOP OF STRUCT
<br />EQUIP EQUIPMENT OPH OPPOSITE HAND TOSTL TOP OF STEEL ; . • MIN. SCOPE OF INSPECTION PER RCW 64.55
<br />EXH EXHAUST OPNG OPENING TP TOP OF PAVEMENT
<br />EXP EXPANSION OPP OPPOSITE TPD TOILET PAPER DISPENSER ALL MULTIUNIT RESIDENTIAL BUILDINGS SHALL HAVE THE BUILDING ENCLOSURE INSPECTED BY A QUALIFIED
<br />EXIST EXISTING OPPHD OPPOSITE HAND TRACT TRACTION INSPECTOR DURING THE COURSE OF INITIAL CONSTRUCTION AND SHALL AT A MIN. INCLUDE THE FOLLOWING:
<br />EXT EXTERIOR ORD OVERFLOW ROOF DRAIN TV TELEVISION
<br />OUTS OUTSIDE TW TOP OF WALL
<br />FA FIRE ALARM OVHD OVERHEAD TYP TYPICAL :< (A) WATER PENETRATION RESISTANCE TESTING OF A REPRESENTATIVE SAMPLE OF WINDOWS AND WINDOW
<br />INSTALLATIONS. SUCH TESTS SHALL BE CONDUCTED ACCORDING TO INDUSTRY STANDARDS. WHERE
<br />FD FLOOR DRAIN FDC FIRE DEPT CONNECTION P PAINT UNFIN UNFINISHED APPROPRIATE, TESTS SHALL BE CONDUCTED WITH AN INDUCED AIR PRESSURE DIFFERENCE ACROSS THE
<br />"� `tl"� FND FOUNDATION PAV PAVING UON UNLESS OTHERWISE NOTED WINDOW AND WINDOW INSTALLATION.(B) AN INDEPENDENT PERIODIC REVIEW OF THE BUILDING ENCLOSURE DURING THE COURSE OF CONSTRUCTION
<br />FE FIRE EXTINGUISHER PARTN PARTITION UR URINAL OR REHABILITATIVE CONSTRUCTION TO ASCERTAIN WHETHER THE MULTIUNIT RESIDENTIAL BUILDING HAS BEEN
<br />FEC FIRE EXTINGUISHER PBD PARTICLEBOARD 1 CONSTRUCTED, HAS BEEN PERFORMED, IN SUBSTANTIAL COMPLIANCE WITH THE BUILDING ENCLOSURE DESIGN
<br />CABINET PDF POWER DRIVEN FASTENER VAC VENTILATION AND AIR VICINITY MAP DOCUMENTS.
<br />FF&E FURNITURE, FINISHES & PERF PERFORATED CONDITIONING
<br />EQUIPMENT PERIM PERIMETER VCT VINYL COMPOSITION TILE
<br />CERTIFICATION -CERTIFICATE OF OCCUPANCY.
<br />FFEL FINISH FLOOR PERP PERPINDICULAR VERT VERTICAL
<br />VEST VESTIBULE - _- - - _ - --- UPON COMPLETION OF AN INSPECTION REQUIRED BY RCW 64.55, THE QUALIFIED INSPECTOR SHALL PREPARE AND
<br />ELEVATION PL PLATE EvereaCcmmunty
<br />FIN FINISH PLAM PLASTIC LAMINATE VIF VERIFY L FIELD ttCorre " SUBMIT TO THE APPROPRIATE BUILDING DEPARTMENT A SIGNED LETTER CERTIFYING THAT THE BUILDING
<br />FIXT FIXTURE VR VAPOR RETARDER ENCLOSURE HAS BEEN INSPECTED DURING THE COURSE OF CONSTRUCTION AND THAT IT HAS BEEN
<br />PLBG PLUMBING_ LL CONSTRUCTED IN SUBSTANTIAL COMPLIANCE WITH THE BUILDING ENCLOSURE DESIGN DOCUMENTS.
<br />FL FLOOR PLYWD PLYWOOD VT VINYL TILE l„MBA
<br />FLASH FLASHING
<br />Coge
<br />PNL PANEL E eet CommUnt
<br />i[q
<br />snuwen„°n £ lt e 4'J
<br />VWC VINYL WALL COVERING r WSEC MIN. REQUIRED TESTING
<br />FO FACE OF POL POLISHED ,�"�"` V Everert Untve si7y Center
<br />FP FIRE PROTECTION PR PAIR W/ WITH t �' ° k Evcc,
<br />FPG FIREPROOFING PREFAB PREFABRICATED r Unf-gmn5tste Mane, AIR BARRIER WHOLE BUILDING TEST
<br />- ^i `£ £ U I PiSilY Everei
<br />W WIDE, WIDTH/WEST
<br />PROJ PROJECT t _ ' I
<br />FIR FRAME WC WATER CLOSET l
<br />FT FEET PSF POUNDS PER SQUARE WD WOOD -- ------
<br />FRT FIRE RETARDANT TREATED FOOT WDS WOOD SCREW E,emeMaySChoot„
<br />AM
<br />FTG FOOTING PT POINT / WDW WINDOW 4 [
<br />-v
<br />„ , 1 PROJECT DIRECTORY
<br />FURN FURNITURE W/O WITHOUT n ------------- - -- -----
<br />;e'
<br />PRESSURE -TREATED ,h a,ns a • _ ;a, z a•5, r Taq"ea•ElPost&v
<br />PTD PAPER TOWEL DISPENSER / WP WATERPROOFING _nvo _
<br />GA GAUGE/GAGE PAINTED WPM WATERPROOF MEMBRANE A E"�°vewti n f - _ - _v Architect/Applicant/Owner: Structural Engineer: Electrical
<br />GALV GALVANIZED PTN PARTITION WPT WORK POINT `� L ' :.r_- KOZ Development Fossatti Pawlak AWA Electrical Consultants, Inc.
<br />WR WATER RESISTANT / m 7 1 Washington St ate gmande Apanntent=
<br />GB GRAB BAR PTR PAPER TOWEL Site Department oElicensmg 1830 Bickford Ave, Suite 201 1735 Westlake Ave N, Suite 205 19015 36th Ave West, Suite E
<br />GC GENERAL CONTRACT(OR) RECEPTACLE REPELLANT / AmencanEnsure-A,E& 4 , Snohomish WA, 98290 Seattle, WA 98109 Lynwood, WA 98036
<br />GFRG GLASS FIBER REINFORCED WRB WEATHER RESISTANT / , ,,' t°LL 206.755.1290 206.456.3076 425.775.1799
<br />GYPSUM BARRIER `&
<br />Q QUARRY TILE H / '"" - „„ n
<br />Everett Town Car Serviy
<br />GL GLASS QTY QUANTITY WS WEATHERSTRIPPING ° r M�. Contractor: Civil: Mechanical/Plumbing:
<br />GR GRADE WSCT WAINSCOT x ) KirtleyCole Associates LLC Red Barn Engineering Design/Build
<br />GRID GROUND WT WEIGHT Meadows 2820 Oakes Avenue, Suite B 24209 29th Ave W
<br />GWB GYPSUM WALLBOARD WW WALL TO WALL I' 25 Gm.p Financial Everett, WA 98201 Brier, WA 98036
<br />425.609.0410 206.200.7174
<br />Permit#: B1804-011
<br />Site Address: 1020 N BROADWAY
<br />DRAWING INDEX Owner: KOZON N BROADWAY LLC
<br />Tenant: [TenName]
<br />SHEET App. Date: 4/3/2018
<br />NUMBER SHEET NAME REVISION REV DATE REV DESCF Proposed Use: APARTMENTS OVER RETAIL, PARKING
<br />Description: 124 UNIT STUDENT HOUSING OVER
<br />ARCHITECTURAL - GENERAL PARKING
<br />AN.01 COVER SHEET 3 11/13/19 Set 11 R
<br />AN.02 GENERAL NOTES Reviewed By: ` Date: '''k i
<br />Lt Office Set Job Site See_Fire/PlaGinh Set
<br />ARCHITECTURAL CODE SUMMARY
<br />AO.01 WSEC - ENERGY SUMMARY FORMS
<br />AO.02 BUILDING CODE LIFE SAFTEY ANALYSIS 3 11/13/19 Set II Rey
<br />AO.03 ZONING CODE ANALYSIS 2 09/01/19 Set II Rev 1
<br />AO.04 ZONING CODE ANALYSIS
<br />AO.05 TYPICAL ACCESSIBILITY DETAILS
<br />AO.06 ACCESSIBILITY DETAILS - TYPE "A" UNIT
<br />AO.07 ACCESSIBILITY DETAILS - TYPE "B" UNIT
<br />CIVIL DRAWINGS Additional Permits Are Required
<br />CO.0 COVER, LEGEND, & NOTES
<br />C0.1 GENERAL NOTES For This Project To Include:
<br />CO.2 EXISTING CONDITIONS Plumbing M Sprinkler
<br />C1.0 TESC
<br />C1.1 TESC DETAILS Mechanical 5D Fire Alarm
<br />C2.0 GRADING & DRAINAGE PLAN - NORTH Electrical
<br />C2.1 GRADING & DRAINAGE PLAN - SOUTH
<br />C2.2 FOUNDATION DRAINAGE PLAN
<br />C2.3 DRAINAGE DETAILS
<br />C3.0 PAVING PLAN -NORTH
<br />C3.1 PAVING PLAN - SOUTH MONITORED AUTOMATIC FIRE
<br />C3.2 PAVING DETAILS ODETECTION SYSTEM REQUIRED
<br />C4.0 WATER & SEWER PLAN - NORTH
<br />C4.1 WATER & SEWER PLAN - SOUTH ZSPRINKLER
<br />SUPERVISED AUTOMATIC
<br />C5.0 STORM PLAN & PROFILE - N. BROADWAY SYSTEM REQUIRED
<br />ARCHITECTURAL DRAWINGS
<br />A1.01 SITE PLAN 2 09/01/19 Set If Rev 1
<br />A1.02 LANDSCAPING PLAN 2 09/01/19 Set 11 Rev 1
<br />A1.03 ENLARGED LANDSCAPE PLANS 2 09/01/19 Set II Rev 1
<br />A2.00 ARCHITECTURAL FOUNDATION PLAN 2 09/01/19 Set II Rev 1
<br />A2.00b FOUNDATION FOOTING PLAN 2 09/01/19 Set II Rev 1
<br />A2.00c PT DECK TRADE COORDINATION 2 09/01/19 Set II Rev 1
<br />A2.01 LEVEL 01 - FLOOR PLAN 3 11/13/19 Set II Rev 2
<br />A2.02 LEVEL 02 - FLOOR PLAN 2 09/01/19 Set II Rev 1
<br />A2.03 LEVEL 03-05 - FLOOR PLAN 2 09/01/19 Set II Rev 1
<br />A2.04 ROOF PLAN 3 11/13/19 Set II Rev 2
<br />A3.01 LEVEL 01 - RCP 3 11/13/19 Set 11 Rev 2 Permit Set
<br />A3.02 LEVEL 02-05 - RCP (Typical)
<br />A4.01 ELEVATIONS - NORTH & SOUTH 2 09/01/19 Set 11 Rev 1 B1804-011
<br />A4.02 ELEVATIONS - EAST & WEST
<br />A4.03 PERSPECTIVE ELEVATIONS -_- -- -
<br />A4.05 WALL SECTIONS
<br />A5.01 BUILDING SECTIONS 2 09/01/19 Set II Rev 1
<br />A5.02 BUILDING SECTIONS 2 09/01/19 Set II Rev 1
<br />A5.03 BUILDING SECTIONS 2 09/01/19 Set II Rev 1 REGISTERED
<br />A6.01 WALL, FLOOR AND ROOF ASSEMBLIES 3 11/13/19 Set II Rev 2 ARCHITECT
<br />A6.02 EXTERIOR WALL DETAILS No. 8013
<br />A6.03 SHAFT AND FRAMING DETAILS
<br />A6.04 FIRESTOPPING DETAILS Joshua S. Scott
<br />A6.05 INTERIOR SIGNAGE DETAILS STATE OF WASHINGTON
<br />A7.01 DOOR SCHEDULE & DETAILS 2 09/01/19 Set li Rev 1
<br />A7.02 DOOR DETAILS
<br />A7.03 OVERHEAD DOOR DETAILS
<br />A7.04 WINDOW SCHEDULE & DETAILS _
<br />A7.05 WINDOW WRAP DETAILS
<br />A7.06 STOREFRONT SCHEDULE & DETAILS
<br />A7.07 STOREFRONT DETAILS KAWNEER 451 SERIES
<br />A7.08 EXTERIOR GRILLE DETAILS
<br />A8.01 WOOD STAIR DETAILS
<br />A8.02 STAIR PLANS & SECTIONS 2 09/01/19 Set II Rev 1
<br />A8.03 STAIR PLANS & SECTIONS 2 09/01/19 Set 11 Rev 1
<br />A8.04 ELEVATOR DETAILS 2 09/01/19 Set 11 Rev 1
<br />A8.05 GENERIC ELEVATOR PLANS & SECTIONS
<br />A9.01 ENLARGED UNIT PLANS 2 09/01/19 Set II Rev 1
<br />A9.02 ENLARGED UNIT BATHROOMS AND INT. ELEVATIONS 2 09/01/19 Set II Rev 1
<br />A9.03 ENLARGED UNIT KITCHENS AND INT. ELEVATIONS
<br />A9.04 ENLARGED GARBAGE ROOM 2 09/01/19 Set II Rev 1
<br />A9.05 ENLARGED NORTH PLAN 3 11/13/19 Set II Rev 2
<br />A9.06 ENLARGED TYPICAL UNITS - RCP
<br />A9.07 ENLARGED LAUNDRY AND ENTRY PLANS 2 09/01/19 Set II Rev 1 -
<br />A9.08 FINISH PLANS & SCHEDULES
<br />STRUCTURAL DRAWINGS
<br />S1.1 GENERAL STRUCTURAL NOTES 2 09/01/19 Set II Rev 1
<br />S1.2 GENERAL STRUCTURAL NOTES 2 09/01/19 Set II Rev 1
<br />S1.3 ABBREVIATIONS & SYMBOLS 2 09/01/19 Set II Rev 1
<br />S2.1 FOUNDATION PLAN 2 09/01/19 Set II Rev 1
<br />S2.2-1 PT SLAB L2 PLAN 2 09/01/19 Set II Rev 1
<br />S2.2-2 MILD REINF L2 PLAN 2 09/01/19 Set II Rev 1
<br />S2.2-3 L2 FRAMING PLAN 2 09/01/19 Set II Rev 1
<br />S2.3 L3 FRAMING PLAN 2 09/01/19 Set II Rev 1 - 11.113119 Set 11 R;av 2
<br />S2.4 L4 FRAMING PLAN 2 09/01/19 Set II Rev 1 2 09/01/19 Set II Rev 1
<br />S2.5 L5 FRAMING PLAN 2 09/01/19 Set II Rev 1 # DATE DESCRIPTION
<br />S2.6 ROOF FRAMING PLAN 2 09/01/19 Set 11 Rev 1
<br />S3.1 TYPICAL CONCRETE SECTIONS & DETAILS 2 09/01/19 Set 11 Rev 1
<br />S3.2 TYPICAL PT DETAILS 2 09/01/19 Set II Rev 1
<br />S3.3 TYPICAL PT DETAILS 2 09/01/19 Set 11 Rev 1 Cr
<br />S3.4 CONCRETE SECTION DETAILS 2 09/01/19 Set II Rev 1
<br />S3.5 CONCRETE DETAILS 2 09/01/19 Set II Rev 1 DEVELOPMENT
<br />S4.1 TYPICAL WOOD SECTIONS & DETAILS 2 09/01/19 Set II Rev 1
<br />S4.2 TYPICAL ROOF SECTIONS & DETAILS 2 09/01/19 Set II Rev 1 1830 BICKFORD AVE,
<br />S4.3 TYPICAL LATERAL SECTIONS & DETAILS 2 09/01/19 Set II Rev 1 SUITE 201
<br />SNOHOMISH, WA 98290
<br />S4.4 WOOD SECTIONS & DETAILS 2 09/01/19 Set II Rev 1 206.755.1290
<br />S4.5 HOLD-DOWN SECTIONS & DETAILS 2 09/01/19 Set II Rev 1
<br />ELECTRICAL PLANS
<br />EO.00 ELECTRICAL COVER SHEET
<br />E1.10 ELECTRICAL SITE PLAN 1020 North Broadway
<br />E2.11 LEVEL 1 LIGHTING PLAN Everett, WA 98403
<br />E2.12 LEVEL 2 LIGHTING PLAN
<br />E2.13 LEVEL 3-5 LIGHTING PLAN
<br />E3.11 LEVEL 1 POWER PLAN
<br />E3.12 LEVEL 2 POWER PLAN COVER SHEET
<br />E3.13 LEVEL 3-5 POWER PLAN
<br />E3.14 ROOF POWER PLAN
<br />E4.00 TYPICAL ENLARGED UNIT PLANS
<br />E5.00 ELECTRICAL RISER DIAGRAM
<br />E6.00 ELECTRICAL PANEL SCHEDULES
<br />E7.00 WSEC - LIGHTING ALLOWANCE FORMS DATE: Issue Date
<br />SHEET:
<br />ANmOl
<br />
|