Laserfiche WebLink
• <br /> Project Summary PROJ-SUM Prescriptive Path, pq. 1 ENV-PRESCRIPTIVE Envelope Requirements Summary, pq 1 ENV-REQ <br /> 2015 WSEC Compliance Forms for Commercial Buntings including R2,R3,&R4 over 3 stories and ail R1 Revised Jun 2016 2015 WSEC Coxmpia ice Forms for Commercial Buildings inducing R2,R3,&R4 over 3 stories and all R1 Revised Jun 2016 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3stories and at R1 Revised Jun 2016 <br /> General Info Project Title: 1021 North Broadway Date 6/1/19 Project Title: 1021 North Broadway Date 06/01/2019 Minimum Requirements This table summarizes prescriptive compliance requirements for opaque elements end fenestration Refer to <br /> For Building Department Use for PrescriptWe Compliance Tables C4021.3 C4021.4 and C402.4 In the 2015 WSEC for important footnotes that apply to these <br /> This PROJ-SUM form PrdjecE Street Address: 1021 Mirth Broadway For Bulking Department Use Fenestration Area as%gross above-grade wail area 17.0% Max.Target: 30.08tables. Refer to Section C402 for all applicable requirements That apply for each envelope element type and <br /> shall be provided as protect City,County, p: Everett WA,98403 Skylight Area as%gross roof area Max.Target: 3.0� <br /> a cover sheet for all Co Zip: applicable exceptions. Refer to SectionC4T0 to ail applicable irAura an for refrigerated spaces. <br /> compliance a kxnrn Project Owner or Rep; KOZ Development Fenestration Alternates: None Selected an ENV-SUM able C4a2,1 3 °te`''° Table Cda2.l 4 Nolte t<t <br /> submittals. Project <br /> Tide matches prceect jurisdiction; Prescriptive Path insulation MI _e assemble me - <br /> plans title block. city of Everett Prescriptive compliance of envelope assemblies may be accomplished by prouidGrtg insulation R-valuees•per Table C4021.3 or U faclorsf factors per <br /> Tab/es C-402.1.4 and C-402.4-A sitejle prr ec1 may comply via R-valuem for some envelope assemblies and U-factoref-factors for otters_ Note Oceue nev roue MI Other Croup R Ai Other Group R <br /> ,compliance method taken for each assembly in spaces provhiecl. <br /> Opaque Elements <br /> Project Description New Construction and Additions U-Factor/F-Factor Method for Prescriptive Roofs <br /> BuildingComponent Insulation keitrely above Deck R-38 c,i. , R-38 cmU-0,027 13-0.027 <br /> Select all that to the R-Value Method for Prescri •re Compliance Compliance <br /> Select <br /> YNew Building EButdng Addition Decitio n +Existing Continuous %AreaciM Metal Building(with thermal spacer block)H°t`t R-2S+R-I I Ls R-25 +R-1 1 Ls U-0.031 U-0.031 • <br /> scope of preject. <br /> Cavity ins, ire.(CO Penetrations Assembly Attic and Other R-49 R-49 U-0.021 U-0,021 <br /> Select Added; +Existing or Existing Bunting Retrofit ,foist or single roller R-49 R-49 U-0.027 U-0,027 <br /> Alteration +Existing if the Provide plank efall e of assembly and description R-Velure R-Value' in CI' U-Factor U-Factor Source' Walls,Above grade <br /> existing btlJdrtg will be Dteratidxl EAlteration +Existing Change in Space Conditioning Mass R-9,5 c i Notefi R 13.3 e_i. t10 EU4 ' U-0.078 <br /> combined with the addition <br /> 8 Sections-Floor Assembly R-34.2 2 <br /> or alteration to demonstrateL_Cha of Occupancy CHIstoric Buildingedge No R-�`aiu ti n lire s ripti e compliance U 0._Oa U-0.200 <br /> compliance per SectionMetal Building R-19 c.i, R-19 c.i. U-0.052 U-0.052 <br /> C5t72 i or Cm3,t. <br /> Building Elements Scope -Select an that apply 6 ° Steel Framed R-13+R-I0e.i. , R-l9+R-8.5 ca. U-0.055 U-0,055 <br /> Wood Framed and Other R-2i w1 int.frame R-21 w/int.frame U 4,a5d U-a,OS4 <br /> Er Bullring Envelope CMeclnanicai Systems Blow Grade Wall note° Same as above grade Same as at ova grade <br /> EService Hot Water Systems [Lighting Systems CDlectricat Systems re 1 Freers <br /> _ Mass R-30 et. le-30 c.a. IJ-0,03 I U-0,03 I <br /> 45 Steel Joist R-38+R-10 c,i. , R-38+R-l0 el. , U-0.029 U-0,029 <br /> OM Commercial aliGroup R-R2,R3,&R4 over 0 Weed Framed and Other R-30 ,R-30 ,, U-0,929 U-0,029 <br /> 3 stories and all R1 <br /> Sfab-t7te-faade Floors <br /> Mixed Use-Buldng is greater than three stories above grade and it has both Commercial and Group R i Unheated R-10 for 24 in.porn top of slab) F-0 4 F-0.54 <br /> Occupancy Type occupancies. Heated •k I s R-l0 perimeter+&under entire slab F-0,55 F-0.55 <br /> Mixed Occupancy-Buikfmg is three stories or less above grade and it has both Commerical and Group R2, 1 Opaque Doors ; <br /> R3 or R4 occupancies. Select All Commercial to document compliance for the commercial areas of the I Swinging No R-Value for pre:cnptnye compliance - Le0.37 U-0.37 <br /> a Nonswineinelkoll-unorslidinal R-4.75 I R-475 tf-r1;4 tl-tt14 <br /> Select all that to the s of project 6 <br /> Y scope prg } Table C402_4-0-3YI of wall aria.ar <br /> 6 E Section C4023.1,3 high Performance <br /> - 30 f4 per Sec Pan C402.3.1.1 1?I Z Fenestration Option-G-; of0% wall area <br /> Ct Fully Conditioned ESernehe tede Refrigerated Warehouse, or Section Ca11iI.3.I.4 DP 1S <br /> `- in-in Cooler/Freezer, 8 Flom Plans-Wall Assembly Schelde R-21 Fenestration Assembly nlaxii�m i1 factor'cotes 1.2 • <br /> [Low Energy Space Category3 Refrigerated Display Case' �! <br /> Space Conditioning i Vertical Fenestration <br /> Categories Eligible Low Energy Spaces Nonmetal framing U-0.30 U-0.30 U-0,28 1J-0.28 , <br /> E. iMetal1ramin (fixedl U 0,38 U-0.38 U 34 _ -OVA <br /> [Unconditioned !__ energy heating/cooling capacity ! Metal framing(operable) U-0,4a ^ U a.44 U 0.3b U-0.36 <br /> [-Wireless service Entrance doors U-0,60 U-0.60 U-0.60 U-0.60 , <br /> EGr� CEquipmettt building O A Skylights <br /> :lament shelter <br /> i Skylights la.0.50 1 11.a 50 6 u-0,50 u•0.50 <br /> Fenestration Assembly Maximum SHGC Factor <br /> Floor Area and Fly Above Bullring Gross Cceditio act Floor Area Project Gross Conditioned Floor Area PF<0.2:north-SI-tt,t=0.53: Plec0.2:north-SHGeme46. <br /> Grade r. Vertical Fenestration <br /> Stories 5 40,994 49994.0 Floor Plans-Wall Assembly Schedkie R-19 R-8.5 all otherSHGCma4 all otherSHGC=0,35 <br /> 0.2 e PF a 0.5;north-SHGC-0 58: 0.2 5 PF<0.5:north-SHGC-0,51: <br /> •Prescriptive C Tel Guiding Performance Q ea all other-SIiGC 0.48 all other-3HCtC 0,42 <br /> I/9 Wall Sections 0.020 PF>n S•all nrirattatinna-Citt`,r..n rid WV 7 n i+sit erimstveinna-Gall,-n iA <br /> Prescriptive -Projects complying prescriptively shah demonstrate compliance with all applicable mandatory and • 2 ? Skylights SHGC-0.35 SHGC-035 <br /> prescriptve requirements of this code. Refer to C401.2 Item 1 for more information. Compliance forms to include <br /> General Compliance with a Prescriptive submittal` All applicable ENV, LTG, MECH and C406 • Eet C410.2 Refrigerated Spaces Insulation insulation M1finimumRValue Assembly Maximum U-factor <br /> Path Toted Building Performance -Pr ects complying via total building performance (T shall include a summaryFreezers-W'`alk-in and Harekouse <br /> of resultsPerformancea whole building energy model per Section C407 and shall demonstrate compliance with all i C Roof Coil lest R-32 U-0•030 Permit S e t <br /> applicable mandatory provisions in this Code.Refer to Section C401.2 Item 2 ex more information. Compliance o tt; Wall R-32 U-0.030 <br /> forms to inciud with a TPB submital:PROJ-SUM,C406-SUM&G406DETAJL ENV-GNfC LTG-EXT. t7G GHIf Floor Plans-Wall Assembly Schedule R-19 R-8.5 Door - R-32 13-0.030 <br /> and all MECH forms(except MECH-ECONO). B 1804-011 <br /> A a Door-transparent reach-in triple:pane,heat-reflective treated or,gas <br /> Floor R 28 U-0.035 <br /> try <br /> - <br /> Section/RCP R-30 Coolers-Walk-in and Warehouse - <br /> 0 Roof/Ceiline R-25 [7-0,039 <br /> Wall R-25 U 0.039 <br /> p et Door UM <br /> r f..0.,,) <br /> Envelope Summary EN M-S U!Y1 Watt Asst'tttlily Schedule R-30 Door-trans anent reach-in double-pane,heat-reflective treated& <br /> WSEC Compliance Firms for Commercial Buildings inducing R2,R3,&R4 over 3 stories and all R1 Revised Jun 2016 _ peta fill.or comely with freezer door rep. <br /> Project Info Project Title: 1021 North Broadway Date 06/01/2019 Flncir No Rea ui reed)t REGISTERED <br /> Compliance forms Applicant Information. Provide contact information for irtdye:1w:who can respond For Building Department Use ARCHITECT <br /> do not require a to inquiriesabout compliance form information provided No.8013 <br /> password to use. Company Name: KOZ Development <br /> Instructional and Company Address: 1830 Bickford Ave,Suite 201,Snohomish,WA 98290 <br /> calculating cells are Joshua S.Scott <br /> write-protected. ApplicarsName: Jason Andersen Prescriptive Path 2 ENV-PRESCRIPTIVE Envelope Requirements Summary, �f <br /> Applicant Phone: 2d6A22,299(I la f p q. p y, pq ENV-R E STATE OF WASHINGTON <br /> Applicant Email: jasan T,kozdevelopment.00m 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Jun 2H6 2015 WSEC Compliance Forms for Commercial Bulldogs including R2,R3,&R4 over 3stories aortal RI i;iaw Jun <br /> n21e <br /> _ - Project Title: 1021 North Broadway Date 06/01/2019 Definitions: <br /> Project Description ENew Bulking CAddition CAlteration Fenestration Area as%gross above-grade wall area 17.0% Max.Target 30.Ok For Building Department Use Ls=Liner system--A continuous membrane installed below the purls s and uninterrupted by framing members,Uncompressed,unfacsed <br /> Manila ion vests on top oldie membrane between the purling.Refer to SectionA102.2.5.4. <br /> an UCCEL T Skylight Area as%gro s roof area Max.Target 3.0% c.i,eContinuousinsulation--insulatinthatiscontnuousacrossallstructuralmemberswithoutthermatbridgesotherthanserviceopetingsaid <br /> p <br /> C All Commercial Group R-All R1 and R2, R3,R4 over 3 stories if vertical fenestration or skylight area exceeds maximum allowed C4024.i, them tine preyed must comply via penetrations by metal fasteners with ax-sectiwtal area of less than0.04%of the opaque surface area of the assembly.Components with <br /> Selection required to enable forms. Y'9N per r Y than 0.04%metal penentrations may be eligible to follow the alternate CI values below. <br /> Component Performance and provide ENV-UAand ENV-SHGC forms_ <br /> int=Intermediate flaming-••[ncEtdes insulated headers,cortrrs and interior partition wall t4 exterior wall intersections.Refer to Section Al a33 <br /> Envelope Compliance Path •Prescriptive Component Performance R-Value Method for U-Factor/F-FactorMeithodfix for framing definitions. <br /> Building Component PeetnoteSnmtoa <br /> Selection required to enable farms, g � Prescriptive Compliance Prescriptive Compliance <br /> Component Performance Perim.ins. Full Slab CI Footnote <br /> Ill Standard C Change of Occupancy/Co:Storting 0 provide planidetall#of assembly and description R-Value . R Value F-Factor F-Factor Source'' Each table in the 2015 WSEC has footnotes applicab le tospecitic information prowiied in the table.This footnom summaryprweles only <br /> Calculation Type -.alleetieleaeseeeeseerecelerieeee abbreviated detests from thc footnotes Refer to2015WSEC for complete footnote information. <br /> Steltsrrdorr required to enable ENV-UA EAdtitiorral Efficiency Package Option C406.8 Enhanced Envelope <br /> eerireeeeeoeoeeeereeeteeeeeeeize <br /> i Note l-Assetnblydesrriptiwlscanlhe found in Chapter 2 and AppendiitA <br /> and ENV-SHGC hams. a i_ , i e Note 2-Use of assembly U-factors,C-fan etorsand F-Factors fromAppendix A and ter 3 are required unless otherwise allowed <br /> To comply,demonstrate building thermal envelope performance is 15%lower than the Target UA. y Yp �I <br /> a by the provisions ofthisCode, <br /> Note 3-For metal bulking roofs where usingR-valu a compliance method a thermal spacer block isrcquired Otherwise use the U-factor <br /> Air barrier testing per Section C402.5,1.2 EAir barrier testing not required compliance method <br /> a <br /> included in project scope I 1 Note 4-Where heated slabs are below-grade,below-grade walls shall comply with the exterior insulatice requirements for heated slabs. <br /> Iris. Assembly Note 5-Heated slab F-factors shall be determined d specifically for heated slabs:Unheated slab F-factors shall not be used. ' <br /> Air Barrier Testing Additional Efficiency Package Option -C40s.9 Reduced Air Infiltration Provide ID from door sihtadttle and description R-Value U-Folio U-Factor Source" Note 6-CMU walls in all pees oodles other than GroupR maybe eligible for reduced insulation if allprovisionsstated inapplicable <br /> Cptip 6'i pp <br /> To comply,demonstrate that measured air leakage of building envelope does not exceed 0.25 s footnote are met.Refer to Footnote Din Table C402.1.4 or Footnote C in Table C4011.3 for eligibility requirements. <br /> cfm/Ri (air barrier surface area) under test pressure of 0.3 inchw.gt i &y- , ,. } Note 7-Components with continuous insulation but wit inetal penetrations i core ettions may beeligIblc for alternate continuou <br /> o `# insulationR-vahiesif all provisions inapplcabe footnote arc met. Refer to alternate prescriptiveR-values in table below <br /> Vertical Fenestration and Total Vertical Gross Exterior u} - --- and Footnote F in Table C402.13 for el ighUxv requirements. <br /> Skylight Area Calculation Fenestration Above Grade %Vertical 1 Al Alternate continuous Insulation nominal Li-values <br /> (rough opening) divided by Wall Area times 100 equals Fe nestr on ,.. �;. <br /> Prescriptive Path-Enter values for a This alternate nominal Revalue compliance option is allowed far projectscomplying with all of the following: <br /> vertical fenestration, skylights,gross walls 6416.0 T 37833.0 X 100 = 17-Q$ Soar Heat Gain Ct lent(SHGC) U-Factor for Prescriptive Compliance I,The ratio of the cross-sectional area,as measured in the plane of the surface,of metal penetrations of otherwise continuous <br /> and rodon this ENV-SUM worksheets Prijectio n _ insulation to the opaque surface area of the assembly is greater than 0.0004(0.04%),but leas than 0.0012(0,12%), <br /> Component Performance Enter values Gross lxtwitxRoof 2.The metal penetrations of othervvise continuous insulation are ieolated or discontinuous(e.g.,brick ticsor other <br /> in ENV-VA and/or ENV--UA-GROUP-R Total Skylight divided by Area times 100 equals %Skylight Factor(PF) Orientation Assembly Assembly discontinuous metal attachments.offset brackets supporting shelf angles that allow insulation toga between the:shel f <br /> worksheet, These values auto fill from Provide ID from window schedule and a iri ext if appl cable'i {N or SEW)'� SHGCt4 U-Factor U-Factor Source's angle and the rtians of wall structure No continuous metal elements a metal studs,z arts,zmhamen, <br /> ENV-VA mid are write protected do ENV- Q.Q 10927.0 X 100 = 0.Q% ' Pr+ Y'17D ) ( 8" <br /> shell'angles)penetrate the otherwise eonenuowsportion of the insulation <br /> 3.Building permit drawings shall contain deta,sshowing the locations and diniensionsof all the metal.penetrati ons(e.g., <br /> Vertical SEIP! 0'`� brick ties or other discontinuous metal attachments,offset brackets,etc.)ofotherwise continuous insulation,In addition, <br /> Fenestration VERTICAL FENESTRATION AREA COMPLIES Window ScheduleA7.05 N I 0.53 0.30 calculations shall be provided showing the ratio of the crow-sectional area ofine4uipenetrationsof otherwise continuous <br /> Area z i insulation to the overall opaque wall arca. •. <br /> Fenestration Area Compliance 8 .13 <br /> bSEW 0.40 Assemblies witb Alternate optima for"noddies with Alternate option for assembilts with <br /> S ht Area SKYLIGHT AREA COMPLIES costisaass mead <br /> ky09 Window v Schedule A7.00t N 0.53 0 38 <br /> pt>,trreniaa:,greater tlaia venal promotions,groin Mon or <br /> � 2 msalstiaa(see COO"bat toss Ourse.tlttMe eqiat toGOO"last less tLsa 0_I2N <br /> i definition) <br /> Vertical Fenestration Alternates 1 t-tr.sct pLL1:.9 i. It-i i <br /> 1 High performance fenestration U-factors arc!SHGC per C402.4.1.3 IS Window Schedule A7.05 SEW 0.40 0.40 tan act A-14.3a R-is.7ra <br /> 0Dedicated outdoor air system per C402.4.1.4 and C403.6 e N 0.53 R-13 3c1 R-16.rtci R•18 3ei <br /> Show locations of qualifying daylight zone C in bullrings e 3 stories,25%or more of NET floor area Is in daylight zones per C402.4.1.1 ° R-15 2ti 1t-14 OnR-:ta # DATE DESCRIPTION <br /> areas and ftz on project plans. Window Schedule A7.05 SEW 0.40 OM P3Oct F-35d R-toch <br /> C in buildings <3 stories,50% or more of CONDITIONED floor area is within daylight zones per a <br /> For Daylight Zone Area Calculations - C402.4.1.1 N 0.53 <br /> R-31ea R-sttxi R-53;1 Emmen <br /> Daylight Zone Calculations t• <br /> a)Sidelight areas include primary+ Y,l3 R43+R7,54:" R-13+R 9 art R-l.-R•1@.3cu <br /> secondary daylghrt zone areas. Daylight Zone Fenestration Alternate Not 5itfelight Daylight Toplight Daylight Percent Daylight R-13 4R-3ttd R-13+it 12.5a F-13*-R 13.tks O <br /> b)Include overlapping to plight and Selected.No Calculations Required Zone Area Zone Area Zane Area41 sidelight daylight zone areas wrier R-13 r Rr>e3 Sd F,-13+R-i S 4a 1?_i 3-R-17.2.n <br /> Tdpligl _ Note I-Insulation that is continuous except for fasteners may be entered here if the cross-sectional area cimetal penetration, through otherwise R-13+1t 13ci R-13+R-10 3c1 R-13-11-17.9ci <br /> c)Refer to Chapter 2 for net floor area continuous insulation is less than 0.12%. leitteIR-a:Sei 11-19+R-30 en Reach-11.7ct DEVELOPMENT , <br /> Note2-Alternate prescriptive continuous insulation R-values per Table C402.1.4, Footnote F maybe used if the cross sectional area of metal R-14+11-14cf R-14+R 17.50 R-19+B-19•3ci <br /> Spaces in Single Ste Bu.Idi penetrations exceeds 0.04% but is less than 0.12%, Calculations are required to use these alternate R-values. <br /> p List all enclosed spaces that exceed 2,500 t1'.have ceiling height greater than 15 it and are space Note 3-Opaque assembly U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1, Specify the R-19+8-161 I1.-394 R-20ci R-19+18.>23a 1830 BICKFORD AVE, <br /> Requiring Skylights types required to comply with this provision. page A-20+R-3.fct R-20+R AScs x.a+R-5,3d <br /> table number or calculation number. SUITE 201 <br /> Space Area ilz Dt2 Area Of A;per Exception Note 4-Thermal spacer blocking and liner system are required for prescriptive Ft-Value compliance in metal bilking roof assemblies. it-31+R-5a 7t-31+R 6:3si R-21+It 6.lieen <br /> Code requires a mhnimooin of 50ar1 of the floor { ) SRR or dare Fx oxt Notes-intermediate framing is required for prescriptive R-Value compliance in wood-framed wall assemblies. SNOHOMISH, WA 98290 <br /> area to be within a skylight daylight zone for Nine 8•Proposed CMU mass walls in non-Group R that meet Table C4021.4 Footnote 1}requirements can enter the target prescriptive 206.755.1290 <br /> specific space types. Reefer to C4024.2 for U-value of 0.104. gad of Envelope Requirements Semrtm r} <br /> requirements. Note 7-Mass transfer slab edges must be covered with an assembly having an(Nerd U-factor of a 2• <br /> Note 8-Refer to Table C402.1.3, Footnote E fir prescriptive R-Value requirement for steel floor joist assemblies_ <br /> DLZ=Daylight zone, Note 9 -Prescriptive slab-on-grade insulation shalt extend from tip of slab to minimum length per an approved method as defined in C40226 <br /> SRR it Skylight to roof ratio Indicate aperahre with"AP'prefix(AP 1.1%) Note 10-Slab-on-grade F-Factors shall come from Appends( A or calculated per approved method as specified in C4021•5.1. <br /> Note 11-Opaque door U-factors shall come from Appendix A or calculated per approved method as specified in C4021.5.1. A door is defined as <br /> opaque if loess than 50%of the door area has glazing <br /> Note 12-Refer to Equation C4-6 Projection Factor Calculation. 1020 North Broadway <br /> Note 13-N=Oriented within 45 degrees of true north, SEW=All other orientations. Everett,WA 98403 <br /> Note 14-Fenestration assembly U-Factor and SHGC shall be the manufacturer's NFRC product rating, which includes the glazing and frame,or <br /> shall be the default value per Section C303.1.3. <br /> WSEC - ENERGY SUMMARY <br /> FORMS <br /> DATE: Issue Date <br /> SHEET: <br /> AO . O1 <br />