My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 N BROADWAY 2019 Plans 2022-12-06
>
Address Records
>
N BROADWAY
>
1020
>
Plans
>
1020 N BROADWAY 2019 Plans 2022-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2022 1:22:35 PM
Creation date
8/4/2021 8:58:45 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1020
Permit
B1804-011
Year
2019
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br /> 5/8"GYP. BOARD, 5/8"GYP. BOARD, 4 v ' \/// =, 5/8"GWB <br /> SEE FINISH SCHEDULE SEE FINISH SCHEDULE 11 <br /> — 2 — _SPRAY INSULATION / <br /> /FRAMING SHOWN FOR FRAMING SHOWN FOR rr_____, <br /> REFERENCE ONLY REFERENCE ONLY (E)CONCRETE PANEL 4 BACKER ROD AND <br /> SEALANT <br /> TAOS STEEL CASING TA08 STEEL CASING — SHIM AS REQ'D n4 <br /> 3/8"BACKER ROD AND MTL STUD HEADER SIDING PER ELEVATION <br /> SEALANT ---_,„` a <br /> DOOR(BY OTHERS), DOOR(BY OTHERS), <br /> SEE DOOR SCHEDULE SEE DOOR SCHEDULE PRE-FINISHED SHEET i lea '� PRIMARYRESISTANT WATER Ii <br /> ^ <br /> METAL FLASHING CORNER BEAD INTERIOR <br /> FIE <br /> • �•� _` �• � � `•/ / <br /> FULL BED OF SEALANT 5/8"TYPE X GWB BARRIER(W.R.B.) PER ' <br /> r THERMALLY BROKEN HM /—i SPEC. <br /> DOOR HEAD SELF ADHERING MEMBRANE <br /> _ METAL DRIP FLASHING W END <br /> ® FILL FRAME W/SPRAY DAMS-COLOR TO MATCH SIDING <br /> FOAM INSULATION. DOOR/WINDOW WRAP AT OPENING <br /> FILL DOOR FRAME WITH <br /> TIMELY PRE-FINISHED TIMELY PRE FINISHED ' I SPRAY FOAM <br /> _ FRAME '. INSULATION <br /> KNOCKDOWN(KD) '. <br /> • <br /> KNOCKDOWN(KD) FRAME I <br /> HEAT TREATED HEAT TREATED \/\ 4 '" <br /> 1 - - HEAD <br /> CASING RETAINER CLIP CASING RETAINER CLIP y <br /> DRYWALL SCREW(1) DRYWALL SCREW(1) <br /> NEXT TO EVERY CLIP NEXT TO EVERY CLIP -- TYPICAL HEADER WITH EXTEIOR CONCRETE WALL 1 "� <br /> CONTINUOUS AIR TIGHT BACKER ROD AND <br /> WRB SEALANT AT JOINT BETWEEN DOOR FRAMEill <br /> TYPICAL JAMB HINGE TYPICAL JAMB - STRIKE DOOR/WINDOW WRAPI/ AND FLASHING. MAINTAIN CONTINUITY OF <br /> AT OPENING SEALANT JOINT FROM HEAD TO JAMBS <br /> SIDING 1 <br /> 7.2511 DOOR JAMB TRIM EXTERIOR INTERIOR <br /> 5/8"GYP. BOARD, EXTERIOR HOLLOW JAMB <br /> METAL • <br /> SEE FINISH DOOR \P <br /> L._ n — <br /> SCHEDULE �- <br /> _� ..- HOLLOW METAL DOOR <br /> JAMB BEYOND <br /> FRAMING SHOWN FOR EXTERIOR METAL DOOR <br /> REFERENCE ONLY FACE OF CONCRETE DOOR THRESHOLD <br /> PANEL BEYOND NOTCH AROUND DOOR <br /> DRYWALL SCREW(1) -- TA08 STEEL CASING FRAME TO COVER BACK . <br /> NEXT TO EVERY CLIP DOOR BOTTOM ANGLE AIR GASKET CONTINUOUS(TYP.) : <br /> WEATHER <br /> CASING FULL BED OF SEALANT, <br /> r r BARRIER PROSOCO AIR DAMREINFORCEMENT DOOR THRESHOLD PREFERRED OPTION A- ,� ,rBRACKET PRE-FINISHED SHT SHEET METAL BACK 4-SIDED CONTINUOUS METAL FRAMEHEAT TREATED MEATL, 24 GA.ASANGLE, 690GALVANIZED, •LINE OF FINISH CEILING • <br /> x aCASING RETAINER CLIP NEEDED TO PROTECT 24 GA, FULL WIDTH OF DOOR THRESHOLD OPTION BWHERE OCCURS FAST FLASH FROM UV DOOR OPENING, RUN �` ���--- , - -- -- ♦ BEHIND DOOR FRAME STANDARD METAL THRESHOLD WITH INTEGRAL <br /> _ GASKET <br /> ARCHITECT <br /> r N Z BACKER ROD AND \ cM Q i REGISTERED <br /> �I'i - ��� — \ CONTINUOUS AIR TIGHT BACKER ROD AND <br /> MI <br /> • <br /> �� �I;, p SEALANT SEALANT AT JOINT BETWEEN DOOR FRAME No. 013 <br /> 1/2"EXPANSION \ <br /> TIMELY PRE-FINISHED , MATERIAL PROSOCO FAST FLASH, AND FLASHING. MAINTAIN CONTINUITY OF I C%f�KNOCKDOWN (KD) Q TURN UP AT END SEALANT JOINT FROM HEAD TO JAMBS +..-- <br /> CONDITIONS Ix <br /> FRAME — \ /� TO FORM <br /> / <br /> V ` CL PAN .440 Joshua S.Scott <br /> WINDOW/DOOR WRAP(TYP.) STATE OF WASHINGTON <br /> EXTERIOR PAVING EXTEND ROOFING MEMBRANE OVER LIP <br /> DOOR(BY OTHERS), � SLOPEDD AWAY FROM <br /> SEE DOOR SCHEDULE -- --__ BUILDING <br /> OF ROUGH OPENING-APPROPRIATE SILL <br /> TERMINATION TBD BY ROOFING MANUF. z <br /> OR ROOFING INSTALLER -- <br /> 00 <br /> TYPICAL HEADER WITH REG. CLOSURE TYPICAL TRANSITION @ EXTEIOR CONCRETE FLOOR ROOF MEMBRANE <br /> 4 . <br /> TAPERED ROOF INSULATION <br /> T.O.ROOF <br /> 5/8"GYP. BOARD, BACKER ROD AND 3/8" <br /> SEE FINISH SCHEDULE SEALANT 2" <br /> / . <br /> FRAMING SHOWN FOR <br /> REFERENCE ONLY (E)CONCRETE PANEL <br /> HOLLOW METAL DOOR SUBFLOOR <br /> DRYWALL SCREW(1) TA08 STEEL CASING iv <br /> NEXT TO EVERY CLIP <br /> _ A <br /> • <br /> p JAMB EXPANSION ANCHOR <br /> I1P <br /> O Roof Access Door <br /> LINE OF FINISH CEILING I � <br /> HEAT TREATED WHERE OCCURS N �������!�� 3" - �'-O" <br /> CASING RETAINER CLIP ��������� <br /> �% , 2"SPRAY INSULATION <br /> -- --- SHIMASREQD ����*3:IF <br /> c `1I� N Z HOLLOW METAL JAMB i�i�D��� <br /> [ o W/FULL BACK ►_ �, <br /> FILL FRAME W/SPRAY <br /> FOAM INSULATION. <br /> TIMELY PRE-FINISHED ��� I <br /> NOTE: KNOCKDOWN KD BACKER ROD AND <br /> MAINTAIN MIN. 2"CLEARANCE FROM RABBET TO ( ) SEALANT 1/8" n` DOUBLE STUD FRAMING <br /> FRAME n 10/16/2018 PUBLIC WORKS REV <br /> FINISH CEILING FOR TA08 CASING; CLEARANCE pi URETHANE INSUL. AT <br /> PROVIDES 1/4" BETWEEN CASING AND FINISH TO DOOR(BY OTHERS), 5/8"GWB . ^4q, BASEMENT WALL FURRING n 06/22/2018 PERMIT REV 1 <br /> AID ATTACHMENT DURING ASSEMBLY. SEE DOOR SCHEDULE CONCRETE 05/29/2018 90%BID SET <br /> '---- 5/8"GWB <br /> ' -- WALL �� - °:' < <br /> 4:• - 03/12l2018 PERMIT SET <br /> s . 4, . <br /> CORNER BEAD <br /> # DATE REVISION <br /> TYPICAL HEADER - i• <br /> BACKER ROD AND SEALANT n: ::: , <br /> 4 SPRAY FOAM WITHIN <br /> TYPICAL SILL WITH EXTEIOR CONCRETE WALL STOREFRONT GLAZING ALL SHIM CAVITIES ' <br /> 0 <br /> OMisc. ; Door Details SEALANT DEVELOPMENT <br /> 3 — 1 -Q o'-21/2' <br /> 1830 Bickbord Ave., Suite 201 <br /> j I HEAD Snohomish, WA 98290 <br /> 206.755.1290 <br /> IKOZON NORTH <br /> BROADWAY <br /> STOREFRONT GLAZING 1020 North Broadway <br /> Everett,WA 9840 <br /> SPRAY FOAM WITHIN <br /> ALL SHIM CAVITIES <br /> 1 <br /> SEALANT <br /> i PROJECT# B1 <br /> 3 <br /> 804-011 <br /> .:�I__fP = on <br /> ANNODIZED ALUM. DRIP- 4 <br /> SHIM TIGHT TO STOREFRONT < <br /> 4 <br /> BELOW AND SPRAY FOAM � DOOR DETAILS <br /> BENEATH-CUT TIGHT TO a - <br /> OPENING, SCRIBING AS BACKER ROD AND SEALANT <br /> _ <br /> NECESSARY - <br /> URETHANEINSUL. AT <br /> EXPOSED CONCRETE . :`a- BASEMENT WALL FURRING <br /> WALL <br /> DATE: Issue Date <br /> SILL <br /> ® ont Det <br /> ails at Concrete SHEET: <br /> 1 1/2" = 1'-O" A7 . 02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.