|
GENERAL NOTES SYMBOLS ABBREVIATIONS
<br /> NELsoN
<br /> THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE AND OTHER 1A V ANGLE FLUOR FLUORESCENT PS PAINT SYSTEM
<br /> ORDINANCES,CODES AND REGULATIONS LISTED IN THE SPECIFICATIONS OR SEPARATE PERMITS,WHEN REQUIRED AND/OR WHEN WORK ITEMS ARE 49. UPON SUBSTANTIAL COMPLETION OF WORK THE CONTRACTOR SHALL A V1(1ND0 WINDOW SYMBOL
<br /> ON THE DRAWINGS,AND REQUIRED BY LOCAL BUILDING AUTHORITIES.THE DESIGN/BUILD IN NATURE,SHALL BE OBTAINED BY THE CONTRACTOR FOR PREPARE A"PUNCHLIST"OF CORRECTIONS AND UNSATISFACTORY AND/OR \ CENTER LINE FM FACTORY MUTUAL PSF POUNDS PER SQUARE FOOT
<br /> GOVERNING CODES, RULES AND REGULATIONS ARE COLLECTIVELY REFERRED MECHANICAL,PLUMBING, FIRE SPRINKLERS,ELECTRICAL AND FIRE ALARM. INCOMPLETE WORK FOR REVIEW BY THE ARCHITECT. 0 DIAMETER OR ROUND FOC FACE OF CONCRETE PSI POUNDS PER SQUARE INCH Nelco Architecture, Inc
<br /> TO AS"THE CODE."THE CONTRACTOR SHALL REPORT ANY INCONSISTENCIES, DESCRIPTIVE, DETAILED DESIGN AND REQUIRED SUBMITTAL DOCUMENTS 50. THE CONTRACTOR SHALL MAINTAIN AT THE SITE,ONE RECORD COPY OF ALL # NUMBER OR POUND FOF FACE OF FINISH PT PRESSURE TREATED
<br /> CONFLICTS OR OMISSIONS DISCOVERED TO THE ARCHITECT FOR INFORMATION SHALL BE PROVIDED FOR REVIEW BY THE REGULATING DRAWINGS,PERMITS,SUBMITTALS AND SAMPLES ON WHICH TO RECORD ALL II COLUMN LINE/GRID LINE AJ PENNY FDIC FURNISHED BY OWNER PTD PAPER TOWEL DISPENSER
<br /> INTERPRETATION PRIOR TO PERFORMING THE WORK. AUTHORITIES AND BY THE OWNER/TENANT/ARCHITECT FOR APPROVAL CHANGES DURING CONSTRUCTION.ACCESS TO THESE SHALL BE PROVIDED FOR INTERIOR ELEVATION(S) 1
<br /> 2. THE GENERAL CONTRACTOR SHALL CONTACT BUILDING MANAGEMENT TO PRIOR TO ANY WORK BEING PERFORMED.SEE SPECIFICATIONS FOR THE USE OF ALL TRADES,CLIENT REPRESENTATIVES AND THE ARCHITECT, A. PERPENDICULAR INSTALLEDBY CONTRACTOR PTD/R PAPER TOWEL DISPENSER
<br /> DETERMINE THE RULES OF THE BUILDING RELATIVE TO CONSTRUCTION;WHEN REQUIREMENT FOR DESIGN/BUILD FIRE SPRINKLER SYSTEM.SUBMIT PLAN DURING ALL PHASES OF CONSTRUCTION. D'(AX.X)13------- ELEVATION IDENTIFICATION PLATE FOIO FURNISHED BY OWNER AND RECEPTACLE
<br /> AND HOW DELIVERIES CAN BE MADE,WHAT PHASES AND TYPES OF TO AND OBTAIN PERMIT FROM THE AUTHORITY HAVING JURISDICTION FOR 51. DURING THE COURSE OF CONSTRUCTION,ACTUAL LOCATIONS SHALL BE SHEET WHERE ELEVATION IS INSTALLED BY OWNER PTN PARTITION
<br /> CONSTRUCTION MAY BE DONE ON REGULAR OR OVERTIME BASIS,AND IN FIRE SPRINKLER SYSTEM INSTALLATION OR MODIFICATION. ALL WORK INDICATED TO SCALE IN RED INK ON THE OWNERS RECORD DRAWINGS FOR ALL 'VDRAWN AB ANCHOR BOLT FOS FACE OF STUD PTR PAPER TOWEL RECEPTACLE 1200 Fifth Ave.
<br /> GENERAL ANY SPECIAL BUILDING REQUIREMENTS WHICH WILL AFFECT THE SHALL COMPLY WITH CURRENT GOVERNING CODES. RUNS OF MECHANICAL AND ELECTRICAL WORK INCLUDING CONCEALED WORK AC ACOUSTICAL FS FULL SIZE PVMT PAVEMENT Suite 1300
<br /> COST OF ALL WORK BORNE BY THE GENERAL CONTRACTOR. ALL WORK SHALL WHICH DEVIATES FROM THE DRAWINGS. UPON COMPLETION OF THE PROJECT, DOOR/RECITE NUMBER A/C AIR CONDITIONING FT FEET Seattle, WA 98101
<br /> CONFORM TO ALL BASE BUILDING STANDARD SPECIFICATIONS AND BUILDING ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH CURRENT INCLUDING ALL PUNCHLIST ITEMS,THIS INFORMATION SHALL BE NEATLY CORRESPONDS TO ROOM ENTERING ACP ACOUSTICAL CEILING PANEL FTG FOOTING QT QUARRY TILE Phone: (206)408-8500
<br /> REGULATIONS,WHICH THE CONTRACTOR SHALL OBTAIN PRIOR TO GOVERNING CODES. NOTHING IN THESE DRAWINGS IS TO BE CONSTRUED AS TRANSFERRED BY THE CONTRACTOR TO A SET OF DRAWINGS,WHICH SHALL BEROOM IDENTIFICATION ACT ACOUSTICAL TILE FTIC FURNISHED BY TENANT
<br /> SUBMISSION OF BID. TO PERMIT WORK WHICH IS NOT CONFORMING TO CURRENT GOVERNING MARKED"AS BUILT SET"AND COPIES SHALL BE PROVIDED TO BOTH THE o 1076 TITLE1 WWW.NELSONWORLDWIDE.COM
<br /> OWNER AND THE ARCHITECT.WITHIN THREE TITLE2�\ ADH ADHESIVE INSTALLED BY CONTRACTOR R RISER
<br /> 3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUB- CODES. (3)WEEKS(15 BUSINESS DAYS) TITLES ROOM NAME ADJ ADJACENT FTIO FURNISHED BY TENANT RA RETURN AIR
<br /> CONTRACTORS'RECEIPT OF COMPLETE SETS OF THESE DOCUMENTS,AS WELL 22. THE CONTRACTOR SHALL CREATE AND IMPLEMENT AN EROSION AND OF THE RECEIPT OF THE"AS BUILT SET."APPROVAL FOR FINAL PAYMENT TO
<br /> AS ALL FUTURE ADDENDA, BULLETINS, FIELD DIRECTIVES AND CHANGE SEDIMENTATION CONTROL PLANFOR ALL SITE CONSTRUCTION ACTIVITIES THE CONTRACTOR SHALL BE GRANTED OR REASONABLE CAUSE SHOWN WHY 0.
<br /> KEY NOTE ROOM# ROOM NO. AF ACCESS FLOOR INSTALLED BY OWNER RAD RADIUS
<br /> ORDERS. ASSOCIATED WITH THE PROJECT. SUCH APPROVAL HAS BEEN DENIED. AFF AT/ABOVE FINISH FLOOR FURR FURRING R&S ROD&SHELF
<br /> 4. THE AIA STANDARD DOCUMENT"A201"TITLED"GENERAL CONDITIONS OF THE THE PLAN MUST CONFORM TO THE EROSION AND SEDIMENTATION 52. PRIOR TO THE COMPLETION OF THE WORK,THE CONTRACTOR SHALL AHJ AUTHORITY HAVING JURISDICTION FUT FUTURE RB RESILIENT BASE
<br /> CONTRACT FOR CONSTRUCTION"SHALL BE CONSIDERED PART OF THE REQUIREMENTS OF THE 2003 EPA CONSTRUCTION GENERAL PERMIT OR ASSEMBLE AND FURNISH THE CLIENT A COMPLETE SET OF MANUFACTURERS' WT-. PARTITION TYPE +s'6" FINISHED CEILING HEIGHT AL ALUMINUM FUTURE- FUTURE ROUGH IN ONLY RCP REFLECTED CEILING PLAN
<br /> GENERAL CONDITIONS OF THIS WORK. LOCAL STANDARDS AND CODES,WHICHEVER IS MORE STRINGENT. CATALOG,OPERATING INSTRUCTIONS,START-UP CHECK LISTS,MAINTENANCE ALT ALTERNATE RIO RD ROOF DRAIN
<br /> 5. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING MANAGEMENT 23. ALL REQUIRED PERMITS MUST BE OBTAINED FROM THE FIRE DEPARTMENT INSTRUCTIONS AND SIMILAR DATA,AS WELL AS ALL GUARANTEE(S) FOR ALL O AP ACCESS PANEL RD
<br /> THE STORAGE OF MATERIALS AND SHALL PROVIDE PROTECTION AS NECESSARY PRIOR TO START OF CONSTRUCTION. EQUIPMENT AND OPERABLE DEVICES FURNISHED OR INSTALLED BY THE / ROOF DRAIN OVERFLOW
<br /> TO PREVENT VANDALISM AND LOSS OF MATERIALS BY THEFT OR DAMAGE 24. ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBILITY CONTRACTOR UNDER THIS CONTRACT,AND SHALL ORIENT AND INSTRUCT REVISION NUMBER _ - PROPERTY LINE APC ACOUSTICAL PANEL CEILING GA GAGE REBAR REINFORCING BAR
<br /> SUSTAINED DUE TO EXPOSURE TO INAPPROPRIATE ENVIRONMENTAL OF THE CONTRACTOR, UNO THE PERSONNEL DESIGNATED BY THE CLIENT IN THE OPERATION OF ALL SUCH REVISION APPROX APPROXIMATE GALV GALVANIZED REF REFERENCE
<br /> CONDITIONS AND WILL REPAIR&REPLACE DAMAGE OR LOSSES AT THE 25. THE CONTRACTOR SHALL PAY THE EXPENSES FOR ALL TRANSPORTATION, EQUIPMENT. ARCH ARCHITECTURAL GB GRAB BAR REFR REFRIGERATOR
<br /> CONTRACTOR'S EXPENSE WITHOUT CHARGE TO THE OWNER. CLOUD AROUND REVISION ASPH ASPHALT GC GENERAL CONTRACTOR REINF REINFORCED
<br /> HOISTING AND ELEVATOR USE CHARGES ON ALL MATERIALS OR EQUIPMENT 53. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER IN THE EVENT NEW OR FINISHED CONTOURS
<br /> 6. WHERE ADJACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION AREA WILL TO THE POINT OF USE,AND SHALL BE RESPONSIBLE FOR ALL UNLOADING, THAT MOLD OR ASBESTOS IS UNCOVERED.THE OWNER SHALL RETAIN A - 78 BD BOARD GL GLASS OR GLAZING REQ'D REQUIRED
<br /> BE OCCUPIED DURING THE CONSTRUCTION PERIOD,THE CONTRACTOR SHALL: CHECKING AND STORAGE OF THE SAME IN CONNECTION WITH THIS QUALIFIED CONSULTANT WHO SHALL ARRANGE FOR THE PROMPT GLB GLU-LAM BEAM REV REVISION
<br /> A. CONFORM TO OWNERS AND TENANT REQUIREMENTS FOR HOURS OF CONTRACT. IDENTIFICATION,TESTING,TREATMENT,REMEDIATION AND STORAGE OF THE MATCH LINE BETW BETWEEN GND GROUND RH RIGHT HAND OR ROBE HOOK
<br /> CONSTRUCTION OPERATIONS,ACCESS TO TENANT SPACES AND 26. OF THE INEVITABLE WASTE THAT IS GENERATED,AS MANY OF THE WASTE MOLD OR ASBESTOS AS REQUIRED BY LAW AND GOOD CONSTRUCTION I DO//�� EXISTING CONTOURS BLK BLOCK
<br /> ALLOWABLE NOISE LEVEL DURING TENANT BUSINESS HOURS MATERIALS AS ECONOMICALLY FEASIBLE SHALL BE REUSED,SALVAGED,OR PRACTICES.THE ARCHITECT SHALL BEAR NO RESPONSIBILITY FOR WORK - SHADED PORTION IS THE SIDE 71 BLDG BUILDING GR GRADE RESIL RESILIENT
<br /> B. CONSTRUCTION OPERATIONS SHALL NOT BLOCK HALLWAYS ACCESSIBLE RECYCLED. WASTE DISPOSAL IN LANDFILLS SHALL BE MINIMIZED. RELATED TO THESE MATERIALS. NIMPF CONSIDERED BM BEAM GWB GYPSUM WALL BOARD RM ROOM
<br /> ROUTES OR MEANS OF EGRESS FOR TENANTS OF BUILDING. CONTRACTOR SHALL COORDINATE WASTE MATERIALS HANDLING AND RO ROUGH OPENING
<br /> C. CONSTRUCTION OPERATIONS SHALL NOT CAUSE INTERRUPTIONS OF 54. THE CONTRACTOR IS ADVISED THAT THE PREMISE HAS NOT BEEN TESTED FOR c34 BRG BEARING RT RESILIENT TILE
<br /> SEPARATION FOR ALL TRADES.CONTRACTOR SHALL PROVIDE SEPARATION, 1 HB HOSE BIB
<br /> ELECTRICAL SERVICES TO THE TENANTS OF THE BUILDING WITHOUT LEAD PAINT OR OTHER POTENTIALLY HAZARDOUS MATERIALS.THE WORK POINT CONTROL POINT • • BOT BOTTOM
<br /> HANDLING,TRANSPORTATION, RECYCLING,SALVAGE,AND LANDFILLING FOR TOP OF WALL HC HOLLOW CORE OR HANDICAP RUB RUBBER
<br /> PRIOR NOTIFICATION AND APPROVALS. PROPERLY PROTECT ALL CONTRACTOR SHALL USE ALL APPROPRIATE PRECAUTIONS IN THE CARRYING • OR DATUM POINT BSMT BASEMENT
<br /> FLOORS,MAIL CHUTES AND STAIR DOORS IN PUBLIC AREAS SUBJECT ALL DEMOLITION AND WASTE MATERIALS. RECYCLABLE MATERIALS CAN BE OUT OF ALL CONSTRUCTION OPERATIONS WHICH MIGHT DISTURB SUCH HDR HEADER RW RAIN WATER
<br /> TO CONSTRUCTION TRAFFIC. SHOE WIPING MATS WILL BE INSTALLED COMMINGLED IN DUMPSTERS ON SITE AS LONG AS PROVISION IS MADE FOR MATERIALS. BUR BUILT UP ROOF HDWD HARDWOOD RWL RAIN WATER LEADER
<br /> HAULING TO A TRANSFER STATION WHERE SEPARATION WILL OCCUR.
<br /> AT ALL OPENINGS BETWEEN CONSTRUCTION AREAS AND ALL PUBLIC 0 HDWE HARDWARE
<br /> TRANSFER STATION MUST PROVIDE DOCUMENTATION REPORT TYPES OF 55. ALL CONTRACTORS SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY '\IO
<br /> SPACES.ALL ACTIVE AREAS SHALL BE KEPT CLEAN AND FREE FROM 0492) EQUIPMENT NUMBER C TOP OF CURB HM HOLLOW METAL
<br /> MATERIALS SEPARATED BY LOAD AND PERCENTAGE OF EACH LOAD. FINAL INSURANCE AS REQUIRED BY ANY GOVERNING AGENCIES HAVING ' • S SOUTH
<br /> DEBRIS. CAB CABINET
<br /> DESTINATION OF SORTED MATERIALS MUST ALSO BE REPORTED. JURISDICTION AND COMPLYING WITH STATUTORY REQUIREMENTS FOR HORIZ HORIZONTAL SC SOLID CORE
<br /> D. ERECT AND MAINTAIN TEMPORARY BRACING,LIGHTS,DUSTPROOF DISABILITY AND WORKMEN'S COMPENSATION. A CB CATCH BASIN
<br /> PARTITIONS,BARRICADES, FENCES AND WARNING SIGNS AS BUILDING SECTION CBU CEMENTITIOUS BACKER UNIT HR HOUR SCD SEAT COVER DISPENSER
<br /> DIVERSION GOALS: A MINIMUM 75%OF TOTAL PROJECT WASTE SHALL BE
<br /> NECESSARY TO PREVENT INJURY,NOISE, DUST AND INCONVENIENCE DIVERTED FROM LANDFILL. THE FOLLOWING WASTE CATEGORIES,AT A CEM CEMENT HT HEIGHT SCHD SCHEDULE
<br /> TO OTHER TENANTS,THE PUBLIC,AND TO PREVENT DAMAGE TO Ah
<br /> R TOP OF PAVEMENT HTG HEATING
<br /> ADJACENT CONSTRUCTION WHICH IS TO BE LEFT IN PLACE. MINIMUM,SHALL BE DIVERTED FROM LANDFILL. SECTION IDENTIFICATION SD SOAP DISPENSER
<br /> E. CONTRACTOR SHALL FOLLOW THE RECOMMENDED CONTROL a. CLEAN DIMENSIONED WOOD, PALLET WOOD AX.X SHEET WHERE SECTION IS DRAWN 1� CER CERAMIC
<br /> Ce CFM CUBIC FEET PER MINUTE HVAC HEATING/VENTILATION/ SECT SECTION
<br /> MEASURES OF THE SHEET METAL AND AIR CONDITIONING NATIONAL b. PLYWOOD,OSB,AND PARTICLEBOARDAIR CONDITIONING SF SQUARE FEET
<br /> CONTRACTORS ASSOCIATION (SMACNA)IAQ GUIDELINES FOR c. CONCRETE CFTGCONDUCTIVERNERGUARD FLOOR TILE HWH HOT WATER HEATER Q
<br /> OCCUPIED BUILDINGS UNDER CONSTRUCTION, 2ND EDITION 2007, d. CARDBOARD,PAPER, PACKAGING CG CORNER
<br /> SHTG SHEATHING CLIENT.'
<br /> ANSI/SMACNA 008-2008(CHAPTER 3). ?PROTECT STORED ON-SITE e. METALS C CHALK BOARD IBC INTERNATIONAL BUILDING CODE SIM SIMILAR
<br /> PROJECT CI CAST IRON ID INSIDE DIAMETER/ SNK SINK
<br /> f. GYPSUM DRYWALL(UNPAINTED)
<br /> AND INSTALLED ABSORPTIVE MATERIALS FROM MOISTURE DAMAGE. SLR SEALER
<br /> F. IF PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING g. ACOUSTIC TILE NORTH CJT CONTROL JOINT
<br /> DETAIL SECTION DIMENSION SND SANITARY NAPKIN
<br /> CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM EFFICIENCY h. PAINT N CLF CHAIN LINK FENCE IEC INTERNATIONAL ELECTRIC
<br /> REPORTING VALUE(MERV)OF 8 MUST BE USED AT EACH RETURN AIR I. GLASS < SECTION IDENTIFICATION ,� PROJECT NORTH CLG CEILING DISPENSER
<br /> AX.X CODE COUNCIL SNR SANITARY NAPKIN
<br /> GRILLE. j. PLASTICS CJ CONSTRUCTION JOINT IFC INTERNATIONAL FIRE CODE
<br /> k. CARPET AND PAD SHEET WHERE SECTION IS DRAWN RECEPTACLE
<br /> 7. ALL CUTTING,CHASING,DRILLING OR DEMOLITION OF WALLS,SLABS,ETC. CLK CAULKING IG INSULATED GLAZING
<br /> REQUIRING THE USE OF JACKHAMMERS OR OTHER HEAVY HAND OR POWER I. BEVERAGE CONTAINERS CLO CLOSET IHM INSULATED HOLLOW METAL SPEC SPECIFICATION
<br /> TOOLS SHALL BE PERFORMED AFTER REGULAR BUSINESS HOURS ON AN CLR CLEAR SQ SQUARE PA NATTO N I
<br /> 27. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY
<br /> OVERTIME BASIS IF NECESSARY,UNLESS THE BUILDING MANAGEMENT AND 9'-0" DENOTES CHANGE IN IN INCH SST STAINLESS STEEL
<br /> ALL COSTS FOR TEMPORARY WATER,PLUMBING, POWER,LIGHTING, CMU CONCRETE MASONRY UNIT DEVELOPMENT
<br /> ANY AFFECTED TENANTS PROVIDE A WRITTEN WAIVER EXPRESSLY PERMITTING ELEVATION INCL INCLUDE
<br /> HEATING OR VENTILATION REQUIRED TO PROPERLY CONDUCT THE WORK. CNTR COUNTER SSK SERVICE SINK
<br /> OTHERWISE. 7-0 INSUL INSULATION
<br /> 8. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR 28. DIMENSIONS ARE TO FACE OF STUD,CONCRETE,OR MASONRY UON. CO CLEANOUT ST STONE/STONE TILE
<br /> INT INTERIOR COMPANY, LLC
<br /> JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS DO NOT SCALE THESE DRAWINGS;WRITTEN DIMENSIONS SHALL GOVERN. DETAIL OR ENLARGED PLAN COL COLUMN STA STATION
<br /> SHOULD ANY DIMENSIONAL DISCREPANCIES BE ENCOUNTERED, I
<br /> IPC INTERNATIONAL PLUMBING CODE
<br /> PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY.THIS CONC CONCRETE STC SOUND TRANSMISSION
<br /> REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO CLARIFICATIONS SHALL BE OBTAINED FROM THE OFFICE OF THE ARCHITECT. AX.X DETAIL IDENTIFICATION CONSTR CONSTRUCTION CLASS 900 SW 16TH STREET SUITE 330
<br /> NORMAL WORKING HOURS.THE CONTRACTOR SHALL PROVIDE PUBLIC 29. LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER SCALE PLANS AND SHEET WHERE DETAIL IS DRAWN PT JAN JANITOR
<br /> PROTECTION,AS NECESSARY AND REQUIRED BY GOVERNING AGENCIES ELEVATIONS. FINISH SYMBOL CONT CONTINUOUS JT JOINT STD STANDARD
<br /> PROTECTION, RENTONL , WA, 98057
<br /> HAVING JURISDICTION,UNTIL CLIENT ACCEPTANCE OF THE PREMISES. 30. INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS' 2 CORR CORRIDOR STL
<br /> 9. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PROVISION RECOMMENDATIONS.ANY DIFFICULTIES ARE TO BE REPORTED TO THE CPT CARPET STOR STORAGE
<br /> ARCHITECT IMMEDIATELY. KIT KITCHEN PROJECT:
<br /> AND MAINTENANCE OF ALL BRACING,SHORING, ENCLOSURES, BARRIERS OR CT CERAMIC TILE STRL STRUCTURAL
<br /> 31. THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL WARRANTEE ALL KO KNOCK OUT SUSP SUSPENDED GLACIER PEAK -
<br /> SCAFFOLDING REQUIRED TO PROVIDE A SAFE WORKING ENVIRONMENT AS CTR CENTER
<br /> DICTATED BY SITE CONDITIONS AND THE PROGRESS OF WORK. WORK PERFORMED BY HIM DIRECTLY FOR A MINIMUM PERIOD OF ONE(1) KS KNEE SPACE SV SHEET VINYL
<br /> YEAR AS SPECIFIED IN THE CONSTRUCTION CONTRACT. ALL DEFECTS CY CUBIC YARD INFARM
<br /> 10. DURING THE ENTIRE CONSTRUCTION PERIOD,ALL EXITS, EXIT LIGHTING, OCCURRING IN THE GUARANTEED PERIOD SHALL BE CORRECTED AT NO SYM SYMMETRICAL
<br /> LAM LAMINATE
<br /> FIRE PROTECTION DEVICES AND ALARMS SHALL BE CONTINUOUSLY ADDITIONAL COST. DBL DOUBLE
<br /> MAINTAINED IN CONFORMANCE WITH LOCAL BUILDING CODE AND OTHER LAV LAVATORY T TREAD
<br /> 32. THE CLIENT,ARCHITECT, CONSULTANTS AND ALL INSPECTORS FROM DEPT DEPARTMENT
<br /> GOVERNING ENTITY REQUIREMENTS. UNO,ALL EXISTING,SERVICES AND PERTINENT AGENCIES SHALL BE PERMI I I LD ACCESS TO THE JOB SITE AT ALL LB LAG BOLT TB TOWEL BAR
<br /> DEVICES SHALL REMAIN ACTIVE. DF DRINKING FOUNTAIN(W/O COOLER) LF LINEAL FOOT T&B TOP&BOTTOM
<br /> TIMES DURING NORMAL WORKING HOURS. DIA DIAMETER 607 RIVERSIDE ROAD
<br /> 11. THE CONTRACTOR SHALL PROTECT THE PROPERTY OF THE CLIENT AND THE
<br /> 33. THE CONTRACTOR SHALL PROVIDE ALL LABOR,MATERIALS,AND LG LENGTH TG TEMPERED GLASS
<br /> BUILDING OWNER.INCLUDING,BUT IS NOT LIMITED TO,WINDOWS, FLOOR EQUIPMENT NECESSARY TO EXECUTE ALL WORK,EXCEPT WHERE NOTED AS DIAG DIAGONAL LH LEFT HAND THK THICK EVERE I I, WA 98201
<br /> AND CEILING FINISHES,PUBLIC TOILETS, ELEVATORS, DOORS&BUCKS, NOT IN CONTRACT(N.I.C.). DIM DIMENSION LINO LINOLEUM TIG TEMPERED INSULATED
<br /> ELECTRICAL AND AIR-CONDITIONING EQUIPMENT.THE CONTRACTOR SHALL 34. MINOR DETAILS NOT SHOWN OR SPECIFIED,BUT NECESSARY FOR PROPER DISP DISPENSER
<br /> PROTECT ADJOINING PROPERTY. DAMAGE CAUSED BY THE CONTRACTOR'S CONSTRUCTION OF ANY PART OF THE WORK,SHALL BE INCLUDED AS IF THEY DN DOWN LKR LOCKER GLAZING Description: No: Date:
<br /> WORK OR WORKMEN MUST BE MADE GOOD,IN A TIMELY FASHION. LT LIGHT TO TOP OF
<br /> WERE INDICATED IN THE DRAWINGS,UNLESS OTHERWISE AGREED UPON. DR DOOR OR DRAIN FOR PERMIT 01/4/2020
<br /> PATCHING AND REPLACEMENT OF DAMAGED WORK SHALL BE PERFORMED AT TOC TOP OF CONCRETE
<br /> THE COST OF THE CONTRACTOR.THE CONTRACTOR SHALL BE FULLY WHERE THE CONTRACT,CONSTRUCTION NOTES OR DRAWINGS CALL FOR ANY DTL DETAIL
<br /> WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE MACH MACHINE TOP TOP OF PAVEMENT
<br /> RESPONSIBLE FOR ALL SUB-CONTRACTORS.IF THE CONTRACTOR FAILS TO DWR DRAWER
<br /> BUILDING CODE,OR ANY OTHER ENTITY HAVING JURISDICTION OVER THE MATL MATERIAL TOS TOP OF STEEL
<br /> COMPLETE THE REPAIRS IN A TIMELY FASHION,SAID REPAIRS WILL BE MADE WORK,THE WORK OF THE MORE STRINGENT NATURE CALLED SHALL BE DS DOWNSPOUT MAX MAXIMUM TOSL TOP OF SLAB
<br /> BY A CONTRACTOR SELECTED BY THE OWNER'S REPRESENTATIVE AND BACK FURNISHED IN ALL CASES. DW DISHWASHER
<br /> CHARGED ACCORDINGLY. 35. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH DWG DRAWING MECH MECHANICAL TOW TOP OF WALL
<br /> 12. THE CONTRACTOR SHALL INDEMNIFY AND SAVE HARMLESS THE LANDLORD, MEZZ MEZZANINE TPD TOILET PAPER DISPENSER
<br /> MATERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE-CONSUMER(POST-
<br /> THE TENANT,AND ARCHITECT AGAINST ANY AND ALL CLAIMS AND DEMANDS INDUSTRIAL)AND POST-CONSUMER RECYCLED CONTENT.THE CONTRACTOR E EAST MFR MANUFACTURER TPH TOILET PAPER HOLDER
<br /> FOR THE DAMAGE TO THE PROPERTY OF ANY PERSON,FIRM OR INDIVIDUAL SHALL FURNISH THESE MATERIALS WITHIN THE PARAMETERS OF THE BUDGET MH MANHOLE TPTN TOILET PARTITION
<br /> EA
<br /> OR FOR PERSONAL INJURIES(INCLUDING DEATH)ARISING OUT OF,OR AND SHALL NOT PURCHASE ANY COST-ADDING MATERIAL OR PAY A PREMIUM
<br /> SUFFERED WHILE ENGAGED IN,OR CAUSED,IN WHOLE OR IN PART,BY THE EACH MIN MINIMUM TS TUBULAR STEEL
<br /> EB EXPANSION
<br /> EXECUTION OF THE WORK;THE CONTRACTOR SHALL WELL AND TRULY (MORE THAN FAIR MARKET VALUE)WITHOUT PROJECT MANAGER AND OWNER ANSION BOLT
<br /> ACKNOWLEDGEMENT AND APPROVAL. EJ EXPANSION JOINT MIR MIRROR TV TELEVISION
<br /> DEFEND THE LANDLORD,TENANT AND ARCHITECT AND SHALL PAY ALL 36. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH EL ELEVATION MISC MISCELLANEOUS TYP TYPICAL
<br /> MONIES AWARDED FOR SUCH DAMAGES OR INJURIES(INCLUDING DEATH),ALL MLD MOLDING
<br /> MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE PROJECT ELEC ELECTRIC
<br /> COSTS INCLUDING ATTORNEY'S FEES SUSTAINED,AND SHALL OBTAIN A FULL MRGWB MOISTURE RESISTANT GWB UL UNDERWRITERS LABORATORY
<br /> ACQUAINTANCE AND RELEASE IN FAVOR OF THE LANDLORD,TENANT AND SITE WHERE AVAILABLE,WITHIN BUDGET,WITHIN FAIR MARKET VALUE AND ELEV ELEVATOR
<br /> DO NOT PRESENT RISK TO THE PROJECT SCHEDULE. MTD MOUNTED UNF UNFINISHED
<br /> EM ENTRY MAT
<br /> ARCHITECT, UNLESS SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGENCE MTL METAL UON UNLESS OTHERWISE NOTED
<br /> 37. FOR ALL NEW WOOD PRODUCTS INCLUDING BUT NOT LIMITED TO PARTICLE
<br /> OF THE LANDLORD,TENANT,ARCHITECT,ITS AGENTS OR EMPLOYEES. BOARD, MDF, PLYWOOD, OSB AND WOOD DOORS,THE CONTRACTOR SHALL EMER EMERGENCY MULL MULLION UR URINAL
<br /> 13. THE ARCHITECT SHALL NOT BE HELD RESPONSIBLE FOR THE PERFORMANCE OF FURNISH MATERIALS THAT CONTAIN NO ADDED UREA-FORMADALHYDE. ENCL ENCLOSURE OR ENCLOSED
<br /> ANY WORK,NOR FOR THE MEANS AND METHODS OF CONSTRUCTION CHOSEN 38. DETAILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. MINOR EP ELECTRICAL PANEL N NORTH
<br /> BY THE CONTRACTOR OR ANY SUB-CONTRACTORS,NOR SHALL THE ARCHITECT MODIFICATIONS MAY BE REQUIRED TO SUIT FIELD CONDITIONS. EWC ELECTRIC WATER COOLER VAR VARIES
<br /> GUARANTEE THE PERFORMANCE OF THEIR CONTRACTS. NIC NOT IN CONTRACT VCT VINYL COMPOSITION TILE
<br /> 14. THE CONTRACTOR SHALL PERFORM DAILY CLEANING OF THE JOB SITE REQUIRED MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK. EPX EPDXY NO/# NUMBER VERT VERTICAL
<br /> DURING THE CONSTRUCTION PERIOD AND SHALL PROTECT FINISHED WORK 39. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER BY MECHANICS EQ EQUAL NOM NOMINAL VEST VESTIBULE
<br /> FROM DAMAGE. IMMEDIATELY PRIOR TO TENANT OCCUPANCY,THE AND TRADESPERSONS SKILLED IN THEIR RESPECTIVE TRADES AND IN EQUIP EQUIPMENT NTS NOT TO SCALE
<br /> CONTRACTOR SHALL PERFORM FINAL CLEANING OF THE WORK AREA ACCORDANCE WITH THE BEST TRADE PRACTICES. VIN VINYL
<br /> EST ES I
<br /> INCLUDING, BUT NOT LIMITED TO,WET WIPING OF FURNITURE,AND 40. THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY AND DELIVERY TIMES EX EXPANSION OA OVERALL VWC VINYL WALL COVERING
<br /> CASEWORK,WASHING AND WAXING OF VCT FLOORING AND THE VACUUMING FOR ALL SPECIFIED MATERIALS&EQUIPMENT REQUIRED TO PERFORM THE OC ON CENTER
<br /> OF CARPET.ALL CLEANING SHALL BE IN ACCORDANCE WITH WORK UPON RECEIPT OF THE CONTRACT DOCUMENTS.SHOULD THE EXIST EXISTING W WEST
<br /> MANUFACTURERS' RECOMMENDATIONS AVAILABILITY OF SPECIFIED ITEMS POSE A DELAY TO THE ON-TIME EXT EXTERIOR OD OUTSIDE DIAMETER/
<br /> DIMENSION W/ WITH
<br /> 15. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL COMPLETION OF THE PROJECT,THE CONTRACTOR SHALL NOTIFY THE OFF OFFICE W/O WITHOUT
<br /> SUB-CONTRACTORS AND SHALL PERFORM SUCH MISCELLANEOUS WORK AS ARCHITECT IMMEDIATELY AND PROPOSE AN EQUIVALENT SUBSTITUTION TO FA FIRE ALARM OH OVERHEAD WC WATER CLOSET SEAL:
<br /> MAY BE NECESSARY FOR THEM TO COMPLETE THEIR WORK.IT IS EXPECTED BE REVIEWED BY THE ARCHITECT IF SUCH A DELAY IS NOT ACCEPTABLE. FBO FURNISHED BY OTHERS
<br /> THAT THE CONTRACTOR SHALL ALSO CLOSELY COORDINATE THE WORK WITH 41. SUBSTITUTION OF ALL EQUALS SHALL BE ONLY AS APPROVED BY THE FCIC FURNISHED BY CONTRACTOR OPH OPPOSITE HAND WD WOOD
<br /> THAT OF ALL OTHER VENDORS RETAINED BY THE CLIENT TO ASSURE THAT ARCHITECT.WHERE THE TERM"OR EQUAL"IS USED THE ARCHITECT SHALL INSTALLED BY CONTRACTOR OPNG OPENING WF WIDE FLANGE
<br /> ALL SCHEDULES ARE MET AND THAT WORK PROCEEDS WITHOUT DELAY. BE THE SOLE JUDGE OF EQUALITY BASED UPON THE INFORMATION FCTY FACTORY OPP OPPOSITE WG WIRE GLASS
<br /> 16. BIDDERS, BEFORE SUBMITTING PROPOSALS,SHALL VISIT AND CAREFULLY FURNISHED BY THE CONTRACTOR. SUBSTITUTIONS MUST BE ACCEPTED IN WHSE WAREHOUSE
<br /> WRITING BEFORE THEY MAY BE USED. FD FLOOR DRAIN PERP PERPENDICULAR 10194
<br /> EXAMINE THE AREA AFFECTED BY THE WORK TO FAMILIARIZE THEMSELVES WP WATER PROOF REG TERED
<br /> WITH THE EXISTING CONDITIONS AND THE DIFFICULTIES THAT WILL AFFECT 42. THE CONTRACTOR SHALL PREPARE SUBMITTALS FOR REVIEW BY THE FDN FOUNDATION PFN PREFINISHED WR WATER RESISTANT AR HITECT
<br /> THE EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL WILL BE ARCHITECT,FOR ALL MATERIALS AND EQUIPMENT SPECIFIED.IF THE FE FIRE EXTINGUISHER PL PLATE OR PROPERTY LINE WSCT WAINSCOT
<br /> CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE, CONTRACTOR,THE OWNER,OR THE OWNER'S REPRESENTATIVE SUBSTITUTES FEC FIRE EXTINGUISHER CABINET PLAM PLASTIC LAMINATE WT WEIGHT
<br /> ir(ii
<br /> AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, A MATERIAL,METHOD OF ATTACHMENT, REVISES A CONSTRUCTION DETAIL, FF FACTORY FINISH PLYWD PLYWOOD
<br /> EQUIPMENT,OR MATERIALS, REQUIRED BECAUSE OF DIFFICULTIES OR IN ANY WAY ALTERS THE WORK SUCH THAT IT NO LONGER CONFORMS TO FIN FINISH PNL PANEL XFMR TRANSFORMER AM EG/ L
<br /> ENCOUNTERED WHICH COULD HAVE BEEN REASONABLY FORESEEN HAD SUCH THESE DOCUMENTS,WITHOUT THE WRITTEN ACCEPTANCE OF THE t
<br /> AN EXAMINATION BEEN MADE.THE GENERAL CONTRACTOR SHALL VERIFY ALL ARCHITECT,SUCH ACTION WILL RELIEVE THE ARCHITECT OF ANY FL FLOOR PNT PAINT YD YARD \ ATEOFON
<br /> CONDITIONS AND DIMENSIONS ON THE JOB SITE AND REPORT ANY AND ALL RESPONSIBILITY OR LIABILITY INCLUDING,BUT NOT LIMITED TO,AESTHETIC FLG FLASHING PR PAIR
<br /> DISCREPANCIES AND/OR UNUSUAL CONDITIONS TO THE ARCHITECT PRIOR CONSEQUENCES,SUBSEQUENT FAILURE(S)AND PERSONAL OR PROPERTY
<br /> TO FINALIZING BIDS OR COMMENCEMENT OF ANY CONSTRUCTION. DAMAGE ATTRIBUTABLE TO THIS CHANGE.
<br /> 17. THE GENERAL CONTRACTOR SHALL MAKE KNOWN ANY AND ALL LIMITATIONS, 43. REVIEW OF A SPECIFIC ITEM SHALL NOT INCLUDE REVIEW OF AN ASSEMBLY
<br /> EXCLUSIONS,OR MODIFICATIONS TO THE PROJECT DURING THE BID OF WHICH THE ITEM IS A COMPONENT.
<br /> SELECTIONS PERIOD.ANY AND ALL LIMITATIONS,EXCLUSIONS,OR 44. SUBMITTALS THAT CONTAIN EXCESSIVE ERRORS OR ARE INCOMPLETE OR
<br /> MODIFICATIONS NOT ITEMIZED IN THE BID PROPOSAL DOCUMENTS ARE INADEQUATE MAY BE RETURNED WITHOUT ACTION. COSTS INCURRED FOR CITY STAMP:
<br /> PRESUMED"INCLUDED",IN WHICH CASE NO ADDITIONAL MONIES WILL BE THE RESULTANT DELAYS WILL BE THE RESPONSIBILITY OF THE
<br /> ALLOCATED FOR THIS WORK. CONTRACTOR.
<br /> 18. EXISTING CONSTRUCTION AND DIMENSIONS SHOWN ARE PER EXISTING 45. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR OF
<br /> DRAWINGS.ALL EXISTING INFORMATION MUST BE VERIFIED IN THE FIELD. OBLIGATIONS OR RESPONSIBILITIES FOR DEVIATIONS FROM THE
<br /> NEITHER THE OWNER NOR THE ARCHITECTS ARE RESPONSIBLE FOR ACCURACY REQUIREMENTS OF THESE CONTRACT DOCUMENTS,UNLESS THE ARCHITECT
<br /> OF EXISTING INFORMATION. EXISTING CONSTRUCTION CONDITIONS IN AREAS IS NOTIFIED AND SPECIFICALLY APPROVES OF,THE DEVIATIONS AT THE
<br /> WHERE NEW WORK IS NOT PLANNED MAY BE NOT COMPLETELY SHOWN. TIME OF SUBMISSION.
<br /> 19. WITHIN ONE(1)WEEK(5 BUSINESS DAYS),OF THE AWARD OF THIS 46. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR'S
<br /> CONTRACT,PRIOR TO MOBILIZATION FOR ANY WORK,THE CONTRACTOR OBLIGATION FOR COORDINATION NOR WAIVE RESPONSIBILITY FOR ERRORS
<br /> SHALL FURNISH A CONSTRUCTION SCHEDULE SHOWING CHRONOLOGICALLY AND OMISSIONS IN THE SUBMITTALS,INCLUDING"FIELD MEASURE."
<br /> THE PHASES OF THE WORK,AND ALL RELATED WORK FOR THE COMPLETION OF 47. CHANGES IN THE SCOPE OF WORK OR IN CONSTRUCTION DETAILS,
<br /> THE PROJECT.THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD TIMES, WHETHER DUE TO FIELD CONDITIONS OR OMISSIONS BY THE CONTRACTOR,
<br /> LENGTH OF TIME FOR EACH PHASE,ITS START AND COMPLETION,WITH A ARCHITECT OR OWNER,SHALL BE DOCUMENTED BY THE ARCHITECT AND GENERAL NOTES &
<br /> PROJECTED COMPLETION DATE. APPROVED,PRIOR TO EXECUTION.
<br /> 20. CONTRACTOR AND SUBCONTRACTORS SHALL ATTEND JOB MEETINGS 48. THE PRESENCE OF A REPRESENTATIVE OF THE ARCHITECT ON THE JOB SITE ABBREVIATIONS
<br /> REQUIRED BY THIS CONTRACT. DOES NOT IMPLY CONCURRENCE WITH OR THE APPROVAL OF ANY WORK.THE
<br /> 21. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FOR ALL SITE DEVELOPMENT CONTRACTOR SHALL CALL TO THE ATTENTION OF THE ARCHITECT,IN
<br /> WORK, PAY ALL FEES FOR PERMITS AND CHECK ALL GOVERNING WRITING,ALL SPECIFIC ITEMS FOR WHICH ARCHITECT'S REVIEW IS REQUIRED.
<br /> AUTHORITIES'SPECIFICATIONS FOR BUT NOT LIMITED TO,GUTTERS,
<br /> SIDEWALKS,POLES,AND OTHER STRUCTURES,INCLUDING THE REMOVAL OR Proj. No: 20.0000104.000 Reviewed By: PA/PM
<br /> RELOCATION OF EXISTING UTILITIES OR OTHER PHYSICAL OBJECTS SHOWN
<br /> ON PLANS OR NOTED OTHERWISE.
<br /> A N - 1
<br />
|