My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2019 BLDG 40-58 Plans 2022-11-09 (3)
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2019 BLDG 40-58 Plans 2022-11-09 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 10:02:42 AM
Creation date
8/5/2021 3:34:10 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
M1811-038
Year
2019
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TITLE DATE <br /> Iv ECHA\ ICAL v ECHANICAL ELECTRICAL ELECTRICAL <br /> 40-058—M1A—A KEY SHEET 06.12.18 40-058—M515A MECHANICAL SECTIONS 06.12.18 40-058—E000-19-1 AUTOCLAVE FLOOR PLAN CONDUIT COORDINATION 06.12.18 40-058-E731-06-01 OPMP-740E 06.12.18 <br /> 40-058—M1B—A P & ID LEGEND & ABBREVIATIONS 06.12.18 40-058—M530A AUTOCLAVE PIPING SECTIONS 10.09.18 40-058—EO ELECTRICAL LEGEND 06.12.18 40-058—E731-06-02 OPMP-740E 06.12.18 <br /> 40-058—M2A—A GENERAL NOTES 06.12.18 40-058—M531A AUTOCLAVE PIPING SECTIONS 10.09.18 40-058—E1 ABBREVIATIONS AND NOTES 06.12.18 40-058—E731-06-03 OPMP-740E 06.12.18 <br /> 40-058—M2C—A SCHEDULES 06.12.18 40-058—M532A AUTOCLAVE TRENCH PIPING SECTIONS 06.12.18 40-058-1E2-19A COMPOSITE AUTOCLAVE PLAN 06.12.18 40-058—E731-06-04 OPMP-740E 06.12.18 <br /> 40-058—M2E—A SCHEDULES 06.12.18 40-058—M533A AUTOCLAVE TRENCH PIPING SECTIONS 10.09.18 40-058-1E2-19B ISOMETRIC VIEW 06.12.18 40-058—E732-02-01 OPMP-770E 06.12.18 <br /> 40-058—M2H—A SCHEDULES 06.12.18 40-058—M534A AUTOCLAVE COOLING TOWER SECTIONS 10.09.18 40-058-1E2-19C ISOMETRIC VIEW 06.12.18 40-058—E732-02-02 OPMP-770E 06.12.18 <br /> 40-058—M20—A SCHEDULES 06.12.18 40-058—M535A AUTOCLAVE PIPING SECTIONS 10.09.18 40-058—E732-02-03 OPMP-770E 06.12.18 <br /> 40-058—M20—A AUTOCLAVE SUBSYSTEM SCHEDULES 09.11.18 40-058—M536A AUTOCLAVE PIPING DETAILS 10.09.18 <br /> 40-058-2E2-19 COMPOSITE AUTOCLAVE MEZZANINE PLAN 09.11.18 40-058—E732-02-04 OPMP-770E 06.12.18 <br /> 40-058—M2P—A FIRE PROTETION NOTE SHEET 06.12.18 <br /> 40-058—M538A AUTOCLAVE PIPING SECTIONS 08.28.18 40-058—E733-03-01 OPMP-430E 06.12.18 <br /> 40-058-1M10-29R REMOVAL PARTIAL HVAC PLAN 06.12.18 40-058—M539A AUTOCLAVE PIPING SECTIONS 09.11.18 40-058-3E10-34 PARTIAL LIGHTING PLAN 09.11.18 40-058-E733-03-02 OPMP-430E 06.12.18 <br /> 40-058-1 M160-24R REMOVAL PROCESS PIPING PLANS - LIQUIDS 06.12.18 40-058—M540A AUTOCLAVE PIPING SECTIONS 10.09.18 40-058-E4-14A SUB 35-4(V58-14A) ONE LINE DIAGRAM 06.12.18 40-058—E733-03-03 OPMP-430E 06.12.18 <br /> 40-058-1M160-34R REMOVAL — PROCESS PIPING PLANS — LIQUIDS 06.12.18 40-058—M541A AUTOCLAVE PIPING SECTIONS 07.03.18 40-058—E4-14B SUB 35-4(V58-14B) ONE LINE DIAGRAM 06.12.18 40-058—E733-03-04 OPMP-430E 06.12.18 <br /> 40-058—E4-15A SUB 35-6(V58-15A) ONE LINE DIAGRAM 09.11.18 40-058—E734-01-01 FOR REFERENCE OPCT-810E 07.28.15 <br /> 40-058—M2R FOR REFERENCE — FIRE PROTECTION SITE PLAN 06.12.18 40-058—M543A NITROGEN SYSTEM UTILITIES DETAILS 06.12.18 40-058—E4-15B SUB 35-5(V58-15B) ONE LINE DIAGRAM 09.11.18 40-058—E734-01-02 FOR REFERENCE — OPCT-810E 07.28.15 <br /> 40-058-1M9A AUTOCLAVE COMPOSITE PLAN 10.09.18 40-058—M930A AUTOCLAVE 1 NORTHWEST ISOMETRIC 09.11.18 40-058—E4-16A SUB 35-8(V58-16A) ONE LINE DIAGRAM 07.31.18 40-058—E734-04-01 OPCT-840E 06.12.18 <br /> 40-058—RFM9A AUTOCLAVE COMPOSITE ROOF PLAN 10.09.18 40-058—M931A AUTOCLAVE 1 NORTHEAST ISOMETRIC 06.12.18 40-058—E4-16B SUB 35-7(V58-16B) ONE LINE DIAGRAM 07.31.18 40-058—E734-04-02 OPCT-840E 06.12.18 <br /> 40-058-2M10-29A PARTIAL HVAC PLAN 06.12.18 40-058—M932A AUTOCLAVE PIT NORTHEAST ISOMETRIC 10.09.18 40-058—E4B-35 FEEDER 35 ONE — LINE DIAGRAM 07.31.18 40-058—E734-04-03 OPCT-840E 06.12.18 <br /> 40-058—RFM10-29A PARTIAL HVAC PLAN 06.12.18 40-058—E5-1B EMERGENCY ONE LINE DIAGRAM 06.12.18 40-058—E734-04-04 OPCT-840E 06.12.18 <br /> 40-058-3M110-29A PARTIAL PLUMBING PLAN 06.12.18 40-058-2E60-29 PARTIAL 120/208V POWER PLAN 07.31.18 <br /> 40-058—TN1M160-29A PROCESS PIPING PLANS — LIQUIDS 10.09.18 40-058-2E60-34 PARTIAL 120/208V POWER PLAN 07.31.18 <br /> 40-058—TN1M160-34A PROCESS PIPING PLANS — LIQUIDS 06.12.18 40-058-3E60-34 PARTIAL 120/208V POWER PLAN 09.11.18 <br /> 40-058-1M160-24A PROCESS PIPING PLANS — LIQUIDS 06.12.18 <br /> 40-058-1M160-29A PROCESS PIPING PLANS — LIQUIDS 06.12.18 40-058—TN1 E60-29 PARTIAL 120/208V POWER PLAN 06.12.18 40-058—E735-01-01 FOR REFERENCE — HEAT TRACE CONTROL PANEL 02.13.18 <br /> 40-058-1M160-34A PROCESS PIPING PLANS — LIQUIDS 06.12.18 40-058—TN1 E60-34 PARTIAL 120/208V POWER PLAN 06.12.18 40-058—E735-01-02 FOR REFERENCE — HEAT TRACE CONTROL PANEL 02.13.18 <br /> 40-058-1M160-39A PROCESS PIPING PLANS — LIQUIDS 06.12.18 40-058—TN1E110-29 PARTIAL 277/480V POWER PLAN 06.12.18 40-058—E735-01-03 FOR REFERENCE — HEAT TRACE CONTROL PANEL 02.13.18 <br /> 40-058—RFM160-34R PROCESS PIPING PLANS — LIQUIDS — DEMO 09.11.18 40-058-1E110-29 PARTIAL 277/480V POWER PLAN 07.31.18 40-058—E735-01-04 FOR REFERENCE — HEAT TRACE CONTROL PANEL 02.13.18 <br /> 40-058—RFM160-34A PROCESS PIPING PLANS — LIQUIDS 09.11.18 <br /> 40-058-1E110-34 PARTIAL 277/480V POWER PLAN 07.31.18 40-058—E735-02-01 FOR REFERENCE — HEAT TRACE CONTROL PANEL 02.13.18 <br /> 40-058—TN1M210-29A PROCESS PIPING PLANS — GASES 10.09.18 <br /> 40-058-2E110-24 PARTIAL 277/480V POWER PLAN 06.12.18 40-058—E735-02-02 FOR REFERENCE — HEAT TRACE POWER PANEL 02.13.18 <br /> 40-058—TN1M210-34A PROCESS PIPING PLANS — GASES 06.12.18 <br /> 40-058-1M210-24A PROCESS PIPING PLANS — GASES 10.09.18 40-058-2E110-29 PARTIAL 277/480V POWER PLAN 07.31.18 40-058—E735-02-03 FOR REFERENCE — HEAT TRACE POWER PANEL 02.13.18 <br /> 40-058-1 M210-29A PROCESS PIPING PLANS — GASES 09.11.18 40-058-2E110-34 PARTIAL 277/480V POWER PLAN 09.11.18 40-058—E735-02-04 FOR REFERENCE — HEAT TRACE POWER PANEL 02.13.18 <br /> 40-058-1M210-34A PROCESS PIPING PLANS — GASES 06.12.18 40-058-2E211-29a PARTIAL CONTROL SYSTEMS PLAN 06.12.18 <br /> 40-058-1 M210-39A PROCESS PIPING PLANS — GASES 06.12.18 40-058-2E410-29 PARTIAL COMMUNICATIONS PLAN 07.31.18 <br /> 40-058—RFM210-29A PROCESS PIPING PLANS — GASES 08.28.18 40-058-2E410-34 PARTIAL COMMUNICATIONS PLAN 06.12.18 <br /> 40-058—RFM210-34A PROCESS PIPING PLANS — GASES 10.09.18 40-058-3E110-29 PARTIAL 277/480V POWER PLAN 06.12.18 <br /> 40-058-1M260-24 FOR REFERENCE — PARTIAL FIRE PROTECTION PLAN 06.12.18 40-058-3E110-34 PARTIAL 277/480V POWER PLAN 06.12.18 <br /> 40-058-1M260-29A PARTIAL FIRE PROTETION PLAN 06.12.18 <br /> 40-058-2M260-24 FOR REFERENCE — PARTIAL FIRE PROTECTION PLAN 06.12.18 40-058-1 E211A COMPOSITE AUTOCLAVE VIBRATIION MONITORING 06.12.18 <br /> 40-058-2M260-29A PARTIAL FIRE PROTECTION PLAN 06.12.18 <br /> 40-058-1 E211 B NITROGEN SUPPLY CONTROL SYSTEMS PLAN 06.12.18 <br /> 40-058—M313A—A STEAM AND CONDENSATE FLOW AND CONTROL 06.12.18 <br /> 40-058-1E211-24 PARTIAL CONTROL SYSTEM PLAN 06.12.18 <br /> 40-058—M324A AUTOCLAVE PIT VENTILATION CONTROLS 06.12.18 <br /> 40-058—M330A—A P & ID INTERCONNECT 10.09.18 40-058-1 E211-29 PARTIAL CONTROL SYSTEM PLAN 06.12.18 <br /> 40-058—M330B—A P & ID COOLING WATER PROCESS FLOW DIAGRAM 09.11.18 40-058-1 E211-34 PARTIAL CONTROL SYSTEM PLAN 06.12.18 <br /> 40-058—M330C—A AUTOCLAVE POINT OF CONNECTION TABLE 08.28.18 <br /> 40-058—M331A—A P & ID GN2 SUPPLY INLET 06.12.18 40-058-2E211-29A PARTIAL CONTROL SYSTEM PLAN 06.12.18 <br /> 40-058—M331B—A P & ID GN2 PRESSURE OUTLETS 10.09.18 40-058-3E211-34A PARTIAL CONTROL SYSTEM PLAN 09.11.18 <br /> 40-058—M332A—A P & ID — COOLING TOWERS 09.11.18 <br /> 40-058—M332B—A P & ID COOLING WATER COLD WELL EAST 06.12.18 40-058-2E410-29 PARTIAL COMMUNICATIONS PLAN 06.12.18 <br /> 40-058—M332D—A P & ID — COOLING WATER HOT WELL EAST 06.12.18 40-058-2E410-34 PARTIAL COMMUNICATIONS PLAN 06.12.18 <br /> 40-058—M332F—A P & ID - COOLING WATER SUPPLY/RETURN 10.09.18 <br /> 40-058—M332G—A P & ID — COLLECTION PIPE WEST 10.09.18 <br /> 40-058—E507-130 COMMUNICATIONS DETAILS 09.11.18 <br /> 40-058—M332H—A P & ID — COLLECTION PIPE EAST 06.12.18 <br /> 40-058—E507-132 COMMUNICATIONS DETAILS 06.12.18 • <br /> 40-058—M333A—A P & ID AUTOCLAVE PROCESS VACUUM 10.09.18 <br /> 40-058—M334A—A COMMUNICATIONS DETAILS 06.12.18 <br /> P & ID — COMPRESSED AIR 09.11.18 <br /> 40-058—M335A—A P & ID — NATURAL GAS 07.31.18 40-058—E524-1 ENLARGED ELECTRICAL PLANS 06.12.18 <br /> 40-058—M336A—A P & ID WATER TREATMENT 10.09.18 40-058—E534-1 ENLARGED ELECTRICAL PLANS 06.12.18 <br /> 40-058—M336B—A P & ID PROCESS WATER 07.03.18 40-058—E534-2 ENLARGED ELECTRICAL PLANS 07.31.18 <br /> 40-058—M337 AUTOCLAVE SUPPORT SYSTEMS SEQUENCE OF OPERATIONS 10.09.18 <br /> 40-058—M337A AUTOCLAVE SUPPORT SYSTEMS SEQUENCE OF OPERATIONS - CONTINUED 10.09.18 40-058—E544 ENLARGED NITROGEN SUPPLY SYSTEM — POWER 06.12.18 <br /> 40-058—M337B AUTOCLAVE SUPPORT SYSTEMS SEQUENCE OF OPERATIONS — CONTINUED 10.09.18 <br /> 40-058—M337C AUTOCLAVE SUPPORT SYSTEMS SEQUENCE OF OPERATIONS — CONTINUED 06.12.18 40-058—E570-10 480V SUBSTATION PLAN 07.31.18 <br /> 40-058—M513A HVAC STEAM DETAILS 06.12.18 <br /> 40-058—E700-7 AUTOCLAVE SUBSYSTEM SCHEDULE 06.12.18 <br /> 40-058—E700A FOR REFERENCE — ELECTRICAL DETAILS — SHEET INDEX 06.12.18 <br /> 40-058—E700C ELECTRICAL AUTOCLAVE DETAILS INDEX 09.11.18 <br /> 'ate' ➢Km.. <br /> ; , „ ,„ Po 1 8t ; t <br /> www.brph.com Copyright©2017 <br /> Architects, Engineers, Constructors <br /> 19020 33rd Ave W,Suite 530 State of Washington <br /> Lynnwood;Washington,98036 Certificate of Authorization <br /> Lynnwood, <br /> W00 Architecture No.603235512 <br /> 425-9Engineering No.3137 <br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE <br /> ACCEPTABILITY CAG 10.09.18 THIS DESIGN AND/OR CHECKED SHEET INDEX W2548317 10.09.18 <br /> SPECIFICATION IS APPROVED KML 10.09.18 SHEET is— <br /> ENGINEER TITLE <br /> fr ® APPROVED BY DEPT. DATE KML 10.09.18 BOEING 777X CWC BUILDING G 2 3 d ,,, <br /> ,, <br /> �, <br /> ., CHECKED o <br /> APPROVED BUILDING 'I 0—F V Q V JOB NO COMP NO. 6 <br /> U <br /> APPROVED DWG No. <br /> GENERAL MASTER EVERETT, WA 40-002-G2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.