Laserfiche WebLink
s) D , <br /> F DR CONTINUATION / . <br /> F EFER TO DRAWING <br /> M313 - <br /> ,-- 8" HPS <br /> � �D <br /> 1st LEVEL 1st LEVEL <br /> INTERIOR EXTERIOR 40-58 (LIN PAD) •. <br /> 3,'PUMPED 3"PUMPED <br /> I CONDENSATE --\ CONDENSATE <br /> 4 \ <br /> _01_ ... <br /> ,- 7 <br /> / / /�- 2" HIGH PRESSURE CONDENSATE , - - - - - - . <br /> -J _ _ SEQUENCE OF OPERATION <br /> A A 1.NITROGEN VAPORIZER CONDENSATE RECEIVER WITH DUPLEX PUMPS <br /> THE EXISTING CONDENSATE RECEIVER(OCP-900E)COLLECTS THE OVER FLOW FROM THE(2)STEAM <br /> SPARGED NITROGEN VAPORIZERS, ONE OF WHICH IS EXISTING.THE SYSTEM IS COMPRISED OF(1)400 <br /> I ji� 1 8"HPS 1 GALLON(OPERATING VOLUME)HORIZONTALLY MOUNTED RECEIVER TANK,(2)CONDENSATE PUMPS,PIPED <br /> IN A PARALLEL ARRANGEMENT,AND ALL ASSOCIATED APPURTENANCES AND DEVICES DEPICTED ON THE <br /> 4 <br /> VG;., CONTROL SYSTEM DIAGRAM. VAPORIZER A STEAM INLET NOZZLE VAPORIZER B STEAM INLET NOZZLE ,.� F --. <br /> I CONNECTION, N13,2-1/2" 150#FLG ' te; CONNECTION,N13,2-1/2" 150#FLGN 1 <br /> - - — T -�- J ' A.RUN CONDITIONS: 111 '_ <br /> T \ — — THE CONDENSATE PUMPS SHALL BE AVAILABLE TO RUN 24 HOURS A DAY,365 DAYS A YEAR TO SUPPORT <br /> HPS DRIP " II 71 <br /> HPS DRIP 7 HPS DRIP THE REQUIREMENTS OF THE NITROGEN VAPORIZERS INDEPENDENT FROM THE NITROGEN VAPORIZER / C HPS DRIP I C HPS DRIP <br /> K A LEG 1 I (-. ) LEG C , LEG CONTROL PANELS.THE CONDENSATE PUMPS SHALL BE ENABLED/DISABLED BY THE EMCS. \ LEG ' LEG <br /> VAPORIZER A STEAM TRAIN DRIP - � VAPORIZER B STEAM TRAIN DRIP _ - <br /> TRAP CONNECTION,N15,3/4"NPTFIll`'` TRAP CONNECTION, N15,3/4"NPTFIlitir- <br /> B.STAGING ORDER: ., <br /> THE CONDENSATE PUMPS ARE IN A LEAD/LAG/STANDBY TYPE CONFIGURATION INCLUDING FAILOVER.THE <br /> DOUBLE BLOCK& DESIGNATED CONDENSATE LEAD PUMP AND LAG PUMP SHALL ROTATE UPON ONE OF THE FOLLOWING <br /> BLEED W/INTEGRAL CONDITIONS(USER SELECTABLE): j <br /> BY-PASS,TYPICAL 7MANUALLY THROUGH A SOFTWARE SWITCH <br /> • IF PUMP RUNTIME OF 168 HOURS(ADJ.)IS EXCEEDED <br /> X i • MONTHLY <br /> - VAPORIZER A VAPORIZER B <br /> C.FAILOVER EXISTING BY OTHERS • <br /> --DC J I— THE EMCS SHALL MONITOR EACH CONDENSATE PUMP'S STATUS AND IF ANY CONDENSATE PUMP FAILS, <br /> — THE FAILED PUMP SHALL BE DISABLED AND THE LAG CONDENSATE PUMP SHALL BE ENABLED.AN ALARM <br /> T - SHALL BE SENT TO THE OPERATOR'S WORKSTATION AND THE FAILED PUMP SHALL BE LOCKED OUT OF j <br /> THE CONTROL SEQUENCE UNTIL AN OPERATOR HAS RESOLVED THE ISSUE AND SHALL THEN RESET THE <br /> C `\ HEPCS DRIP ALARM AT THE EMCS. tiki <br /> D.OPERATION/CONTROL 'y <br /> .41 THE EMCS SHALL CONTINOUSLY MONITOR THE WATER LEVEL VIA A WATER LEVEL TRANSMITTER IN THE J i <br /> CONDENSATE RECEIVER TANK. THE EMCS SHALL HAVE THREE SET WATER LEVELS,THE HIGH-HIGH LEVEL, j c..> 0HIGH LEVEL AND LOW LEVEL AS DETERMINED BY TEST AND BALANCE. IF THE RECEIVER TANK REACHES _ = a <br /> w THE HIGH WATER LEVEL MARK THEN THE EMCS SHALL ENABLE THE LEAD CONDENSATE PUMP. IF THE * _ <br /> �`„ <br /> =1 RECEIVER TANK WATER LEVEL CONTINUES TO RISE ABOVE THE HIGH WATER LEVEL MARK OR THE HIGH CO `' " <br /> FULL PORT / w - HIGH LEVEL(HHL)HAS BEEN REACHED,THE EMCS SHALL ENABLE THE LAG PUMP. IF THE HIGH-HIGH LEVEL <br /> J <br /> GATE VALVE o �I HAS BEEN REACHED,AN ALARM SHALL BE SENT TO THE OPERATOR'S WORKSTATION.WHEN THE WATER N.O. <br /> oo = LEVEL IN THE RECEIVER TANK REACHES THE LOW LEVEL(LL),ALL PUMPS ENABLED SHALL BE DISABLED. VAPORIZER A OVERFLOW NOZZLE -' }4 <br /> VAPORIZER B OVERFLOW NOZZLE __. <br /> o _ I CONNECTION,N8,6" 150#FLG I CONNECTION,N8,6" 150#FLG <br /> a. S E.ALARMS <br /> ALARMS SHALL BE PROVIDED TO THE EMCS FOR THE CONDENSATE RECEIVER AND PUMPS AS FOLLOWS: ' <br /> a. ` i \ / <br /> M ,V HIGH HIGH LEVEL - - - - - - <br /> • PUMP FAILURE >` <br /> • <br /> OA 6"OVERFLOW <br /> 1"HPC N.C. <br /> 1"HPC -' <br /> - - - - - - - 1�I - - 8"HPS <br /> / / 4"HPS <br /> 8„HPS n <br /> ►/ <br /> 2"PUMPED 3"PUMPED CONDENSATE _ X <br /> CONDENSATE ----. - - - - - - - V't - 1"HPC - - - - - - - - - T <br /> - - - - - - �- HPS DRIP C � <br /> - \ \ LEG \ � > <br /> / 2„VENT <br /> VENT TO ROOF- ,--�' I / ; <br /> SEE PROJECTIV i <br /> PLANS FOR — -I \ CS _ -II" CS <br /> 2" CONTINUATION _ I \ �' n' ; LT _ <br /> �F' VFD -I� II- VFD �� aAiiik <br /> 1/2"CA 1 e .A 6"VENT/ W —.. <br /> 90 PSI - m m II / / 13 GAL „ <br /> a o w a o w t <br /> 3 <br /> 0 w 0 F- 0 w v i- l w FLASH �- 1 1/2 LOW <br /> LU ' LL rn v~i w U. cn O IO TANK / PRESSURE <br /> _ w m w a O O 6"X 4" L CONDENSATE <br /> VENT FULL SIZE z a L.,-, z ¢ z a Z a 1/4" 1/4" �����n <br /> _ ¢ REDUCER V V N <br /> w COcn vy w cn a w °' COCO '- aNI OF OUTLET o o _ _ _ EMCS / 1 <br /> �t-� V /�\ VX- /-\� /�\ 0 1-1/2"HPC J _ \l\ <br /> • . <br /> A A rt- OVERFLOW 1 N.O. <br /> L- - - --X1- TO DRAIN EMCS EMCS , HHL — �I 6"OVERFLOW <br /> SXCP-05 400 GAL RECEIVER <br /> 2-1/2" TANK HL_ <br /> \ CAP OR PLUG COLD WATER <br /> OVERFLOW OCP —I \ INLET CONNECTION(NOT USED) <br /> PRESSURE REFER TO PLUMBING SHEETS 900E b I N \ <br /> 2"DRAIN <br /> POWERED 1 M110-39 AND SCHEDULE M2K _ T / N <br /> PUMP FOR FLOOR SINK - LL 2"LOW POINT PROVIDE HOSE • <br /> AUTOCLAVE PIT/GRADE LEVEL L - r r wG I - CONNECTION <br /> INFORMATION,TYP. -- I _1 DRAIN ' <br /> 1 \\ .,, <br /> GENERAL NOTES CONSTRUCTION NOTES REFERENCE DRAWINGS \- ROUTETOADJACENT <br /> 101110.- REMOVE EXISTING BLIND FLANGE FROM EXISTING 6"GATE VALVE AND CONNECT 6"OVERFLOW PIPE 1. REFER TO APCI DRAWINGS FOR EXISTING VAPORIZER. DRAIN AND TERMINATE ` <br /> 1. SEE STEAM TRAP SCHEDULE ON SHEET M2h-a FOR TRAP TYPE - ID FROM VAPORIZER B(POC N8B). 2, REFER TO M543a FOR INTERFACE SCHEDULE TO NITROGEN EQUIPMENT. DISCHARGE WITH 45°CUT <br /> 3, REFER TO SPECIFICATION SECTION 23 2213-"STEAM AND CONDENSATE PIPING"FOR STEAM AND , _N. F `,,\::::Ar <br /> 2. SEE SHEET M513a FOR STEAM PIPING AND SPECIALTIES DETAILS. © REMOVE EXISTING BLIND FLANGE FROM EXISTING 3/4"GATE VALVE AND CONNECT 3/4" HPC PIPE FROM CONDENSATE PIPING ON THIS DIAGRAM. ''; )ii v off• <br /> VAPORIZER B(POC N15B), <br /> 3. EQUIPMENT,PIPING, ETC.THAT IS GREYED OUT IS EITHER EXISTING OR TO BE ,• ,'' o <br /> INSTALLED WITH SUBSEQUENT AUTOCLAVES AT A LATER DATE. REFER TO AUTOCLAVE EXISTING I FLANGE AND CONNECT 4"HP PIPE FROM VAPORIZER B(POC N13B VIA : -,f Q © REMOVE EX ST NG BLIND FLA G CO C S ( 0 )SUBSYSTEM SCHEDULES FOR INDICATION OF INSTALLATION PHASE. FLANGE. www,brpli.corn <br /> Copyright 0 2018 <br /> Architects Engineers, Inc. f-- ��o� �,�5147 g�� �A, . <br /> stet otwao on �: GISTS ,\ ib <br /> AntltectweNo. f3235512 SS j VAL y� <br /> E25-2t3500 y •wining. 2 <br /> aliment;No,2133 Q <br /> r <br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE �? <br /> SI'M REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE of WASH ACCEPTABILITY JXK 06/12/18 STEAM AND CONDENSATE <br /> W2548317 0 06/12/18 <br /> �` r THIS DESIGN AND/OR CHECKED r F; <br /> 0 ISSUE FOR CONSTRUCTION JXK JLC 06/12/18 5P SPECIFICATION IS APPROVED JEW 06/12/18 FLOW AND CONTROL DIAGRAM SHEET <br /> ., ® co <br /> BRPHARCHITECTS ENGINEER TITLE Boeing777X CWC BUILDINGo <br /> l' i1/� 1 31\—a N <br /> eNciNR wc• APPROVED BY DEPT. DATE JLC 06/12/18 -J ` <br /> _ . <br /> No.3137 CHECKED <br /> BUILDING 40-58 <br /> `p,F\ tiP�� APPROVED JOB No. COMP No. 40-58-M313A-a x <br /> qTF OF A„���R` APPROVED MECHANICAL MASTER EVERETT, WA DWG No. 40-58-M313A-a <br />