<br /> PROCESS PUMP SCHEDULE
<br /> ELECTRICAL
<br /> CAPACITY SIZE PERFORMANCE MOTOR DATA BASIS OF DESIGN
<br /> FLUID SUCTION DISCHARGE IMPELLER DIAMETER EQUIPMENT ACCESSORIES AUTOCLAVE
<br /> TAG SERVICE TEMP°F GPM FT HD (IN) (IN) (IN) EFF% NPSHA FT NPSHR FT DRIVE TYPE BHP HP RPM PUMP TYPE VOLTS/PH MANUFACTURER MODEL UNIT WEIGHT(LBS) LEVEL AND NOTES INSTALL PHASE
<br /> OPMP-710E COLD WELL/AUTOCLAVE COOLING WATER SUPPLY 76 3,100 105 10 10 13.25 71 24.3 10.5 VFD 102 125 1,800 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. T10A-B-1 3,440 AUTOCLAVE PIT 1,2, 3,4,5 AUTOCLAVE 1
<br /> OPMP-720E COLD WELL/AUTOCLAVE COOLING WATER SUPPLY 76 3,100 105 10 10 13.25 71 24.3 10.5 VFD 102 125 1,800 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. T10A-B-1 3,440 AUTOCLAVE PIT 1,2,3,4,5 AUTOCLAVE 1
<br /> OPMP-730E COLD WELL/AUTOCLAVE COOLING WATER SUPPLY 76 3,100 105 10 10 13.25 71 24.3 10.5 VFD 102 125 1,800 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. T10A-B-1 3,440 AUTOCLAVE PIT 1,2,3,4,5 AUTOCLAVE 1
<br /> OPMP-740E COLD WELL/AUTOCLAVE COOLING WATER SUPPLY 76 3,100 105 12 8 17.43 79 33.1 9.6 VFD 104 _ 125 1,170 HORIZONTAL SPLIT-CASE CENTRIFUGAL PUMP 480/3 WORTHINGTON 8LR-18S 3,768 AUTOCLAVE PIT 1 2,4,5,7,8 AUTOCLAVE 2
<br /> OPMP-750E HOT WELL/COOLING TOWER WATER 140 3,100 125 12 10 18.00 77 18.4 7.0 VFD 127 - 150 1,150 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. 112C-B-1 4,175 AUTOCLAVE PIT 1,2,4,5,6 AUTOCLAVE 1
<br /> OPMP-760E HOT WELL/COOLING TOWER WATER 140 3,100 125 12 10 18.00 77 18.4 7.0 VFD 127 150 1,150 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. 112C-B-1 4,175 AUTOCLAVE PIT 1,2,4, 5,6 AUTOCLAVE 1
<br /> OPMP-770E HOT WELL/COOLING TOWER WATER 140 3,100 125 12 10 18.00 77 18.4 7.0 VFD 127 150 1,150 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. 112C-B-1 4,175 AUTOCLAVE PIT 1,2,4,5,6 AUTOCLAVE 2
<br /> NOTES:
<br /> 1.REFER TO SPECIFICATION SECTION 23 21 24-PROCESS HYDRONIC PUMPS.
<br /> 2.COORDINATE PUMP MOTOR WITH VFD(FURNISHED AND INSTALLED BY DIV 23,WIRED BY DIV 26). NOTES
<br /> 3.COORDINATE 4"THICK CONCRETE HOUSEKEEPING PAD WITH GENERAL CONTRACTOR. GENERAL
<br /> 4.PROVIDE WITH A CYCLONE-TYPE GRIT FILTER ASSEMBLY AND FLUSHING LINE TO PUMP VOLUTE.
<br /> 5.PROVIDE WITH HEAVY DUTY FABRICATED STEEL BASES FULLY COMPLIANT WITH PIP RESP 002.BASE SHALL HAVE MOTOR ALIGNMENT ADJUSTERS. 1. EQUIPMENT, PIPING, ETC. THAT IS GREYED OUT IS
<br /> 6.COORDINATE 12"THICK CONCRETE HOUSEKEEPING PAD WITH GENERAL CONTRACTOR TO ELEVATE PUMP HIGH ENOUGH FOR 16"0 ELBOW. EITHER EXISTING OR TO BE INSTALLED WITH
<br /> 7.PROVIDE FOOT VALVE AND MANUAL PRIMING CONNECTION TO PROCESS WATER FOR PRIMING 14"0 SUCTION PIPING. SUBSEQUENT AUTOCLAVES AT A LATER DATE.
<br /> 8.PROVIDE MULTI-LEVEL PAD&SOLEPLATES FOR PUMP&MOTOR.COORDINATE WITH GENERAL CONTRACTOR TO ELEVATE PUMP SUCTION INLET HIGH ENOUGH FOR 14"0 ELBOW.REFER TO D/S526-2 FOR TYP.PUMP PAD DETAIL. REFER TO AUTOCLAVE SUBSYSTEM SCHEDULES
<br /> FOR INDICATION OF INSTALLATION PHASE.
<br /> PROCESS COOLING TOWER SCHEDULE
<br /> NO.OF FANS FAN MOTORS SUMP HEATERS BASIS OF DESIGN CONNECTION SIZE/TYPE AUTOCLAVE
<br /> •
<br /> TOTAL TOWER EWT LWT AMB.TEMP TOWER BASIN PER MOTOR HP VOLTS/ OPERATING WEIGHT ACCESSORIES INSTALL
<br /> TAG FLOW(GPM) CELLS (°F) (°F) (°F)WB VOLUME(GAL) MATERIAL PER CELL TYPE SPEED(RPM) CFM EACH CELL EA. PH PER CELL kW VOLTS/PH MANUFACTURER MODEL (LBS) SUPPLY RETURN OVERFLOW DRAIN MAKEUP EQUALIZER EQUIPMENT LEVEL AND NOTES PHASE
<br /> OPCT-810E 1,675 1 118 73 65.4 1,565 STAINLESS STEEL 1 AXIAL PROPELLER 323 321,900 1 75 480/3 1 9.0 480/3 MARLEY NC8414WAS 51,545 12`/FLANGE 12"/FLANGE 4"/NPT 4"INPT+1 1/2"/NPT 2"/NPT_ 12"/FLANGE BUMP-OUT ROOF ALL AUTOCLAVE 1
<br /> OPCT-820E 1,675 1 118 73 65.4 1,565 STAINLESS STEEL 1 AXIAL PROPELLER 323 321,900 1 75 480/3 1 9.0 480/3 MARLEY NC8414WAS 51,545 12"/FLANGE 12"/FLANGE 4"/NPT 4"INPT+1 1/2"INPT 2"/NPT 12"/FLANGE BUMP-OUT ROOF ALL AUTOCLAVE 1
<br /> OPCT-830E 1,675 1 118 73 65.4 1,565 STAINLESS STEEL 1 AXIAL PROPELLER 323 321,900 1 75 480/3 1 9.0 480/3 MARLEY NC8414WAS 51,545 12"/FLANGE 12"/FLANGE 4"/NPT 4"/NPT+1 1/2"/NPT 2"/NPT 12"/FLANGE BUMP-OUT ROOF ALL AUTOCLAVE 1
<br /> OPCT-840E 1,675 1 118 73 65.4 1,565 STAINLESS STEEL 1 AXIAL PROPELLER 323 321,900 1 75 480/3 1 9.0 480/3 MARLEY NC8414WAS 51,545 12"/FLANGE 12"/FLANGE 4"/NPT 4"/NPT+1 1/2"/NPT 2"/NPT 12"/FLANGE BUMP-OUT ROOF ALL AUTOCLAVE 2
<br /> NOTES:
<br /> 1.PROVIDE WITH MOTORS IN THE AIR STREAM.
<br /> 2.TOWERS SHALL BE INSTALLED ON EXISTING WELDED STRUCTURAL FRAME.
<br /> 3.PROVIDE WITH PIPING CONNECTION ORIENTATION AS INDICATED ON DRAWINGS. PROVIDE WITH BOTTOM DEPRESSED SUMP BOX SIDE OUTLET WITH SUCTION
<br /> SCREEN AND ANTI-VORTEX PLATES,AND BOTTOM INLET CONNECTIONS.
<br /> 4.PROVIDE WITH HIGH TEMPERATURE FILL UP TO 140°F.
<br /> 5.PROVIDE WITH ADDITIONAL 4"DRAIN IN BOTTOM OF BASIN AS INDICATED.
<br /> 6.TOWERS ARE TO BE PROVIDED AS INDICATED ON DRAWINGS TO MEET THE DESIGN REQUIREMENTS.
<br /> 7.PROVIDE EACH CELL WITH VR STACK AND FAN DECK EXTENSION.
<br /> 8.EXTEND GEAR REDUCER LUBRICATION LINES TO EXTERIOR OF UNIT ON SOUTH FACE OF EACH CELL(COORDINATE PLACEMENT WITH PLANS).
<br /> AUTOCLAVE VACUUM SYSTEM SCHEDULE
<br /> VACUUM
<br /> PRESSURE VACUUM INLET/OUTLET MANUFACTURER ACCESSORIES AUTOCLAVE
<br /> TAG SERVICE TYPE ACFM (INCHES Hg) SIZE MOTOR HP V/PH/Hz &MODEL WEIGHT(LBS) SERVICE LEVEL AND NOTES INSTALL PHASE
<br /> OPMP-410E AUTOCLAVE PROCESS VACUUM ROTARY VANE VACUUM PUMP 726 29.0 6"/4" 50 480/3/60 BUSCH R5 1600 2,833 AUTOCLAVE PIT ALL AUTOCLAVE 1
<br /> OPMP-420E AUTOCLAVE PROCESS VACUUM ROTARY VANE VACUUM PUMP 726 _ 29.0 6"/4" 50 480/3/60 BUSCH R5 1600 2,833 AUTOCLAVE PIT ALL AUTOCLAVE 1
<br /> OPMP-430E AUTOCLAVE PROCESS VACUUM ROTARY VANE VACUUM PUMP 726 29.0 6"/4" 50 480/3/60 BUSCH R5 1600 2,833 AUTOCLAVE PIT ALL AUTOCLAVE 2
<br /> OPMP-440E AUTOCLAVE PROCESS VACUUM ROTARY VANE VACUUM PUMP 726 29.0 6"/4" 50 480/3/60 BUSCH R5 1600 2,833 AUTOCLAVE PIT ALL AUTOCLAVE 3
<br /> NOTES:
<br /> 1.PROVIDE ONE PROCESS VACUUM PUMP AND SPACE FOR ONE FUTURE PROCESS VACUUM PUMP.
<br /> 2.VFD PROVIDED BY ELECTRICAL.
<br /> 3.REFER TO SPECIFICATION SECTION 23 6216-AUTOCLAVE PROCESS VACUUM SYSTEM.
<br /> 4.PROCESS VACUUM PUMP MANUFACTURER SHALL PROVIDE INSTRUMENTATION NOTED ON P&ID SHIPPED LOOSE.CONTROLS CONTRACTOR SHALL INSTALL AND INTEGRATE INTO CONTROL SYSTEM.
<br /> ttW Amprf y F Sir
<br /> ', ,1:, -/ T , h i -ail:. „; 60,,:., ''',A 14:
<br /> WWW.b1.CC111 Copyright i 201$ x •
<br /> Architects Engineers, Inc. 2to, �FGISTER�°�..y ii'
<br /> SW oriNaftlan IMO33fttMON, $30 coped A rlraton ``:iivl..rSIONA7 -?,-) ,'�
<br /> LYm vod,Washir01.b6 No.603235512 %r`;..rvim-Irv^.'
<br /> 42.921,35O1 No. 37
<br /> m
<br /> a.
<br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE
<br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE of WASH, ACCEPTABILITY 09/11/18 AUTOCLAVE SUBSYSTEM SCHEDULES 1 e
<br /> W2548317 09/11/18
<br /> �`` 0r THIS DESIGN AND/OR V CHECKED 09/11/18 v
<br /> ea
<br /> 0 ISSUE FOR CONSTRUCTION JXK JLC 06/12/18 �P o SHEET
<br /> 5 2 SPECIFICATION IS APPROVED co
<br /> ® BE ENGINEERS
<br /> ENGINEER TITLE Boeing 777X CWC BUILDING
<br /> 1 REVISION RELEASE 99 ANP JLC 09/11/18 7 ENGINEERS INC. APPROVED BY DEPT. DATE JLC 09/11/18 0 ^lvii Q
<br /> N0.3137 CHECKED
<br /> BUILDING 40-58cr,
<br /> ��'� IcI APPROVED JOB NO. COMP NO.
<br /> /F/calf OF AUSN�co"' APPROVED 40-58-M2o-a Yx�
<br /> MECHANICAL MASTER EVERETT,WA DWG NO 40-58-M2o-a
<br /> , .
<br />
|