Laserfiche WebLink
.......... <br /> PROCESS PUMP SCHEDULE <br /> ELECTRICAL <br /> CAPACITY SIZE PERFORMANCE MOTOR DATA BASIS OF DESIGN <br /> FLUID SUCTION DISCHARGE IMPELLER DIAMETER EQUIPMENT ACCESSORIES AUTOCLAVE <br /> TAG SERVICE TEMP°F GPM FT HD (IN) (IN) (IN) EFF% NPSHA FT NPSHR FT DRIVE TYPE BHP HP RPM PUMP TYPE VOLTS/PH MANUFACTURER MODEL UNIT WEIGHT(LBS) LEVEL AND NOTES INSTALL PHASE <br /> OPMP-710E COLD WELL/AUTOCLAVE COOLING WATER SUPPLY 76 3,100 105 10 10 13.25 71 24.3 10.5 VFD 102 125 1,800 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. T10A-B-1 3,440 AUTOCLAVE PIT 1,2, 3,4,5 AUTOCLAVE 1 <br /> OPMP-720E COLD WELL/AUTOCLAVE COOLING WATER SUPPLY 76 3,100 105 10 10 13.25 71 24.3 10.5 VFD 102 125 1,800 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. T10A-B-1 3,440 AUTOCLAVE PIT 1,2,3,4,5 AUTOCLAVE 1 <br /> OPMP-730E COLD WELL/AUTOCLAVE COOLING WATER SUPPLY 76 3,100 105 10 10 13.25 71 24.3 10.5 VFD 102 125 1,800 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. T10A-B-1 3,440 AUTOCLAVE PIT 1,2,3,4,5 AUTOCLAVE 1 <br /> OPMP-740E COLD WELL/AUTOCLAVE COOLING WATER SUPPLY 76 3,100 105 12 8 17.43 79 33.1 9.6 VFD 104 _ 125 1,170 HORIZONTAL SPLIT-CASE CENTRIFUGAL PUMP 480/3 WORTHINGTON 8LR-18S 3,768 AUTOCLAVE PIT 1 2,4,5,7,8 AUTOCLAVE 2 <br /> OPMP-750E HOT WELL/COOLING TOWER WATER 140 3,100 125 12 10 18.00 77 18.4 7.0 VFD 127 - 150 1,150 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. 112C-B-1 4,175 AUTOCLAVE PIT 1,2,4,5,6 AUTOCLAVE 1 <br /> OPMP-760E HOT WELL/COOLING TOWER WATER 140 3,100 125 12 10 18.00 77 18.4 7.0 VFD 127 150 1,150 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. 112C-B-1 4,175 AUTOCLAVE PIT 1,2,4, 5,6 AUTOCLAVE 1 <br /> OPMP-770E HOT WELL/COOLING TOWER WATER 140 3,100 125 12 10 18.00 77 18.4 7.0 VFD 127 150 1,150 SELF-PRIMING CENTRIFUGAL PUMP 480/3 THE GORMAN RUPP CO. 112C-B-1 4,175 AUTOCLAVE PIT 1,2,4,5,6 AUTOCLAVE 2 <br /> NOTES: <br /> 1.REFER TO SPECIFICATION SECTION 23 21 24-PROCESS HYDRONIC PUMPS. <br /> 2.COORDINATE PUMP MOTOR WITH VFD(FURNISHED AND INSTALLED BY DIV 23,WIRED BY DIV 26). NOTES <br /> 3.COORDINATE 4"THICK CONCRETE HOUSEKEEPING PAD WITH GENERAL CONTRACTOR. GENERAL <br /> 4.PROVIDE WITH A CYCLONE-TYPE GRIT FILTER ASSEMBLY AND FLUSHING LINE TO PUMP VOLUTE. <br /> 5.PROVIDE WITH HEAVY DUTY FABRICATED STEEL BASES FULLY COMPLIANT WITH PIP RESP 002.BASE SHALL HAVE MOTOR ALIGNMENT ADJUSTERS. 1. EQUIPMENT, PIPING, ETC. THAT IS GREYED OUT IS <br /> 6.COORDINATE 12"THICK CONCRETE HOUSEKEEPING PAD WITH GENERAL CONTRACTOR TO ELEVATE PUMP HIGH ENOUGH FOR 16"0 ELBOW. EITHER EXISTING OR TO BE INSTALLED WITH <br /> 7.PROVIDE FOOT VALVE AND MANUAL PRIMING CONNECTION TO PROCESS WATER FOR PRIMING 14"0 SUCTION PIPING. SUBSEQUENT AUTOCLAVES AT A LATER DATE. <br /> 8.PROVIDE MULTI-LEVEL PAD&SOLEPLATES FOR PUMP&MOTOR.COORDINATE WITH GENERAL CONTRACTOR TO ELEVATE PUMP SUCTION INLET HIGH ENOUGH FOR 14"0 ELBOW.REFER TO D/S526-2 FOR TYP.PUMP PAD DETAIL. REFER TO AUTOCLAVE SUBSYSTEM SCHEDULES <br /> FOR INDICATION OF INSTALLATION PHASE. <br /> PROCESS COOLING TOWER SCHEDULE <br /> NO.OF FANS FAN MOTORS SUMP HEATERS BASIS OF DESIGN CONNECTION SIZE/TYPE AUTOCLAVE <br /> • <br /> TOTAL TOWER EWT LWT AMB.TEMP TOWER BASIN PER MOTOR HP VOLTS/ OPERATING WEIGHT ACCESSORIES INSTALL <br /> TAG FLOW(GPM) CELLS (°F) (°F) (°F)WB VOLUME(GAL) MATERIAL PER CELL TYPE SPEED(RPM) CFM EACH CELL EA. PH PER CELL kW VOLTS/PH MANUFACTURER MODEL (LBS) SUPPLY RETURN OVERFLOW DRAIN MAKEUP EQUALIZER EQUIPMENT LEVEL AND NOTES PHASE <br /> OPCT-810E 1,675 1 118 73 65.4 1,565 STAINLESS STEEL 1 AXIAL PROPELLER 323 321,900 1 75 480/3 1 9.0 480/3 MARLEY NC8414WAS 51,545 12`/FLANGE 12"/FLANGE 4"/NPT 4"INPT+1 1/2"/NPT 2"/NPT_ 12"/FLANGE BUMP-OUT ROOF ALL AUTOCLAVE 1 <br /> OPCT-820E 1,675 1 118 73 65.4 1,565 STAINLESS STEEL 1 AXIAL PROPELLER 323 321,900 1 75 480/3 1 9.0 480/3 MARLEY NC8414WAS 51,545 12"/FLANGE 12"/FLANGE 4"/NPT 4"INPT+1 1/2"INPT 2"/NPT 12"/FLANGE BUMP-OUT ROOF ALL AUTOCLAVE 1 <br /> OPCT-830E 1,675 1 118 73 65.4 1,565 STAINLESS STEEL 1 AXIAL PROPELLER 323 321,900 1 75 480/3 1 9.0 480/3 MARLEY NC8414WAS 51,545 12"/FLANGE 12"/FLANGE 4"/NPT 4"/NPT+1 1/2"/NPT 2"/NPT 12"/FLANGE BUMP-OUT ROOF ALL AUTOCLAVE 1 <br /> OPCT-840E 1,675 1 118 73 65.4 1,565 STAINLESS STEEL 1 AXIAL PROPELLER 323 321,900 1 75 480/3 1 9.0 480/3 MARLEY NC8414WAS 51,545 12"/FLANGE 12"/FLANGE 4"/NPT 4"/NPT+1 1/2"/NPT 2"/NPT 12"/FLANGE BUMP-OUT ROOF ALL AUTOCLAVE 2 <br /> NOTES: <br /> 1.PROVIDE WITH MOTORS IN THE AIR STREAM. <br /> 2.TOWERS SHALL BE INSTALLED ON EXISTING WELDED STRUCTURAL FRAME. <br /> 3.PROVIDE WITH PIPING CONNECTION ORIENTATION AS INDICATED ON DRAWINGS. PROVIDE WITH BOTTOM DEPRESSED SUMP BOX SIDE OUTLET WITH SUCTION <br /> SCREEN AND ANTI-VORTEX PLATES,AND BOTTOM INLET CONNECTIONS. <br /> 4.PROVIDE WITH HIGH TEMPERATURE FILL UP TO 140°F. <br /> 5.PROVIDE WITH ADDITIONAL 4"DRAIN IN BOTTOM OF BASIN AS INDICATED. <br /> 6.TOWERS ARE TO BE PROVIDED AS INDICATED ON DRAWINGS TO MEET THE DESIGN REQUIREMENTS. <br /> 7.PROVIDE EACH CELL WITH VR STACK AND FAN DECK EXTENSION. <br /> 8.EXTEND GEAR REDUCER LUBRICATION LINES TO EXTERIOR OF UNIT ON SOUTH FACE OF EACH CELL(COORDINATE PLACEMENT WITH PLANS). <br /> AUTOCLAVE VACUUM SYSTEM SCHEDULE <br /> VACUUM <br /> PRESSURE VACUUM INLET/OUTLET MANUFACTURER ACCESSORIES AUTOCLAVE <br /> TAG SERVICE TYPE ACFM (INCHES Hg) SIZE MOTOR HP V/PH/Hz &MODEL WEIGHT(LBS) SERVICE LEVEL AND NOTES INSTALL PHASE <br /> OPMP-410E AUTOCLAVE PROCESS VACUUM ROTARY VANE VACUUM PUMP 726 29.0 6"/4" 50 480/3/60 BUSCH R5 1600 2,833 AUTOCLAVE PIT ALL AUTOCLAVE 1 <br /> OPMP-420E AUTOCLAVE PROCESS VACUUM ROTARY VANE VACUUM PUMP 726 _ 29.0 6"/4" 50 480/3/60 BUSCH R5 1600 2,833 AUTOCLAVE PIT ALL AUTOCLAVE 1 <br /> OPMP-430E AUTOCLAVE PROCESS VACUUM ROTARY VANE VACUUM PUMP 726 29.0 6"/4" 50 480/3/60 BUSCH R5 1600 2,833 AUTOCLAVE PIT ALL AUTOCLAVE 2 <br /> OPMP-440E AUTOCLAVE PROCESS VACUUM ROTARY VANE VACUUM PUMP 726 29.0 6"/4" 50 480/3/60 BUSCH R5 1600 2,833 AUTOCLAVE PIT ALL AUTOCLAVE 3 <br /> NOTES: <br /> 1.PROVIDE ONE PROCESS VACUUM PUMP AND SPACE FOR ONE FUTURE PROCESS VACUUM PUMP. <br /> 2.VFD PROVIDED BY ELECTRICAL. <br /> 3.REFER TO SPECIFICATION SECTION 23 6216-AUTOCLAVE PROCESS VACUUM SYSTEM. <br /> 4.PROCESS VACUUM PUMP MANUFACTURER SHALL PROVIDE INSTRUMENTATION NOTED ON P&ID SHIPPED LOOSE.CONTROLS CONTRACTOR SHALL INSTALL AND INTEGRATE INTO CONTROL SYSTEM. <br /> ttW Amprf y F Sir <br /> ', ,1:, -/ T , h i -ail:. „; 60,,:., ''',A 14: <br /> WWW.b1.CC111 Copyright i 201$ x • <br /> Architects Engineers, Inc. 2to, �FGISTER�°�..y ii' <br /> SW oriNaftlan IMO33fttMON, $30 coped A rlraton ``:iivl..rSIONA7 -?,-) ,'� <br /> LYm vod,Washir01.b6 No.603235512 %r`;..rvim-Irv^.' <br /> 42.921,35O1 No. 37 <br /> m <br /> a. <br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE of WASH, ACCEPTABILITY 09/11/18 AUTOCLAVE SUBSYSTEM SCHEDULES 1 e <br /> W2548317 09/11/18 <br /> �`` 0r THIS DESIGN AND/OR V CHECKED 09/11/18 v <br /> ea <br /> 0 ISSUE FOR CONSTRUCTION JXK JLC 06/12/18 �P o SHEET <br /> 5 2 SPECIFICATION IS APPROVED co <br /> ® BE ENGINEERS <br /> ENGINEER TITLE Boeing 777X CWC BUILDING <br /> 1 REVISION RELEASE 99 ANP JLC 09/11/18 7 ENGINEERS INC. APPROVED BY DEPT. DATE JLC 09/11/18 0 ^lvii Q <br /> N0.3137 CHECKED <br /> BUILDING 40-58cr, <br /> ��'� IcI APPROVED JOB NO. COMP NO. <br /> /F/calf OF AUSN�co"' APPROVED 40-58-M2o-a Yx� <br /> MECHANICAL MASTER EVERETT,WA DWG NO 40-58-M2o-a <br /> , . <br />