My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 7/26/2021 Change Order 1
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 7/26/2021 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
8/6/2021 10:53:55 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
7/26/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids & Backwash Solids Removal
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0002758
Total Compensation
-$236,673.01
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 2/1/2021
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTINUATION SHEET AIA DOCUMENT G703 PAGE OF PAGES <br /> AIA Document G702,APPLICATION AND CERTIFICATION FOR PAYMENT,containing APPLICATION NO: 1 <br /> Contractor's signed certification is attached. APPLICATION DATE: 06.1L2021 <br /> In tabulations below,amounts are stated to the nearest dollar. PERIOD TO: <br /> Use Column I on Contracts where variable retainage for line items may apply. ARCHITECTS PROJECT NO: UT 3752-1/20 <br /> A B C D E F G H I I <br /> ITEM DESCRIPTION OF WORK SCHEDULED WORK COMPLETED MATERIALS TOTAL % BALANCE RETALNAGE <br /> NO. VALUE FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED (G_L) TO FINISH OF VARIABLE <br /> APPLICATION STORED AND STORED (C-G) RATE) <br /> (D+E) (NOT IN TO DATE <br /> DORE) (DIE+F) <br /> 1 MOBILIZATION/DEMOBILIZATION S87,350.00 $87,350.00 $87,350.00 100.00% $0.00 $4,367.50 <br /> 2 DECONTAMINATION OF EQUIPMENT FOR WORK $I,500.00 $1,500.00 $1,500.00 100.00% $0.00 $75.00 <br /> AT WPCF <br /> 3 BIOSOLIDS REMOVED.DEWATERED,AND PLACED ON $632,500.00 $588.712.03 $588,712.03 93.00% $43,787.97 $29,435.60 <br /> ON WPCF BIOSOLIDS PAD(2,000 DT) <br /> 1,861.54 DT x$316.25 <br /> 4 FORCE ACCOUNT FOR WORK AT WPCF $10,000.00 $0.00 $0.00 0.00% $10,000.00 S0.00 <br /> (SECTION 00 7200) <br /> 5 DECONTAMINATION OF EQUIPMENT FOR WORK S1,500.00 $1500.00 S1500.00 100.00% $0.00 $75.00 <br /> AT WFP <br /> 6 BACKWASH SOLIDS REMOVED,DEWATERED, $206,000.00 $18,746.00 S18,746.00 9.00% $187,254.00 $937.30 <br /> AND PLACED ON WFP DRYING BED(400 DT) <br /> 36.40 DT x 5515.00 <br /> 7 FORCE ACCOUNT FOR WORK AT WFP $10,000.00 S0.00 $0.00 0.00% $10,000.00 $0.00 <br /> (SECTION CO 7200) <br /> 8 WA STATE SALES TAX@ 9.8%(WPCF PAD) $71,672.30 $66,401.08 S66,401.08 93.00% $5,271.22 $3,320.05 <br /> 9 WA STATE SALES TAX @8.4%(WE BID) $18,270.00 $1,700.66 $1,700.66 9.00% S16,569.34 $85.03 <br /> t <br /> $1,0313,79230 $765,909.77 $765,909.77 74%. 5272,88253 838,295.49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.