Laserfiche WebLink
„ _ _ :.�.�„.�...4., _,_._. _ .._,,._-.,_a. �.__a,..=-_ _ _ m_.-. .�.� �� _ �� �� �, �� � �. . a A. a�_. K m <br /> 1 GENERALNOTE REVISIONS <br /> CONFORMANCE ENERGY CODE //�\ I' <br /> „ All material and construction methods shall conform to Chapter 246-260 WAC, Provide pool/spa equipment, covers, piping insulation, motors, etc. in l� <br /> 1 -2_f___e_ k "Water Recreation Facilities” published by the Washington State Department accordance with the applicable portions of WSEC Sections C404.11.1 <br /> ' of Health, King County Title 14 - "Water Recreation Facilities", 2015 through C404.1`I,4 <br /> International Building Code, International Electrical Code and International C404.10.1 Heaters. Heat pump pool heaters shall have a minimum <br /> Mechanical Code, 2009 ICC A117.1, 2010 ASCE 7-10, 2015 Washington State COP of 4.0 determined in accordance with ASHRAE Standard 146. <br /> i 2" `. (4) #3 CONT. Energy Code, latest editions, as modified by the local agency having jurisdiction. Other pool heating equipment shall comply with the applicable 1111.11111111111111 <br /> Jr <br /> to <br /> 4 © 1O.C. #4 @ 12" O.C. © Comply with IBC Sections 1910.4.3, 1910.5, 1910.9 and 1910.10. efficiencies in Section C404.2. <br /> - <br /> Of <br /> - - ----___ _- -- _ -__ / J -_---_-- - -- -_- -_ .--_-_-- __--- CONCRETE The electric power to all heaters shall be controlled by a readily t <br /> j �009 _ _ -- Gunite: 1 part cement, 4-1/2 parts sand, based on dry and loose volume; accessible on-off switch that is an intergral port of the heater, - <br /> A BARS r 2,500 psi @ 28 days. or external to and within 3 feet of the heater. Operation of such <br /> -'-� PLACE STEEL Portland Cement Type I or II, ASTM C-`I50, seven sack mix. switch shall not change the setting of the heater thermostat. Such <br /> } "A°, BARSswessnonoapower the <br /> - - © WALL r heL heaterh Ga r iredahemers tsshall notuitbebrequip ed rwith consanto <br /> ° #4 © 12" O.C. ' CENTERLINE REINFORCEMENT equipped <br /> burning pilot lights. <br /> �o #4 © 12" 0.C. Reinforcing steel, deformed intermediate grade, fy == 40,000 psi, ASTM A 15. i <br /> HORIZ. Lap splices 40 diameters; support on concrete blocks and tie with 16 gage <br /> 11111111 1 (TYP ) 404.10.2 Time Switches, Time switches or other control method 1 <br /> annealed wire; 2 minimum cover between earth and steel <br /> to 0a� 0�moa®o®mmmm_mo__do that can automatically turn oft' and on heaters and pump motors <br /> ------- Non-contact splices - minimum 2 inch clear between bars. Contact splices according to a preset schedule shall be installed for heaters and <br /> in°__reins=�m�o���soa must be constructed with the bars aligned so that a line through the center pump motors. Heaters and pump motors that have built in time <br /> m DEPTH RADIUS of the two spliced bars is perpendicular to the surface of the surface of the ;: : n: ' <br /> be in compliance with this sectionC\ ref t' Ill Ell II <br /> as <br /> 1 - _ 0 1, Where publicstandards require <br /> �ao� <br /> ��mmo�v 000=o� _ FLOOR SLAB REINFORCEMENT CONSTRUCTION 24-hour <br /> healthi�o I- { <br /> ome oo�oo 00 - _ h ur operation. <br /> �4 pump ope t' # I } <br /> �m a ql \,11, Maximum length of pool without control joint is o0'-0". Gunite is to be a) 1�.' (NI <br /> I #4 @ 12" O.C. (EACH WAY) B A a, placed monolithic and pneumatically. 2. Pumps that are required to operate solar- <br /> and i ' ��, <br /> SMOOTH -waste-heat-recovery pool heating ru < I <br /> TRANSITION systems. - CA 1 <br /> a <br /> co tf) <br /> FLOOR SLAB REINFORCEMENT ® �� � ' dt �®; CURVE C404.10.3 Covers. Heated pools and in-ground permanent spas shall 0 <br /> NOTE: ) �< <br /> - <br /> 1 #4 © 1 2" 0.C. (EACH WAY) REINFORCING IN SPA SIMILAR TO be provided with a vapor-retardant cover on or at the water surface. co - I, <br /> 1 SHALLOW END OF POOL Pools heated to more than 90°F shall have a pool cover with a <br /> minimum insulation value of R-12, and the sides and bottom of the <br /> pool shall also have a minimum insulation value of R-12. <br /> C404.10.4 Heat Recovery. Heated indoor swimming pools, spas or hot '' <br /> i <br /> tubs with water surface area greater than 200 square feet shall W� <br /> l provide for energy conservation by an exhaust air heat recovery i 1�.1 - <br /> _ system that heats ventilation air, pool water or domestic hot water. Z c <br /> The heat recovery system shall be configured to decrease the exhaust t. S <br /> ' �C � �C�� SECTION � � � air temperature t design heating conditions (80`F indoor) by 36T • <br /> i <br /> ic) <br /> __ _ NTS10°C). Lou Z <br /> SiS1` S1 NTS Si Si• <br /> PQL _ Exception: Pools, spas or hot tubs that include r <br /> system(s) that provide equivalent recovered <br /> energy on an annual basis through one of the <br /> following methods: t: <br /> 1. Renewable energy; <br /> 2. Dehumidification heat recovery; <br /> 3. Waste heat recovery; or <br /> 4. A combination of these system sources <br /> capable of and configured to provide at <br /> least 70 percent of the heating energy <br /> (4) #4 CONT. required over an operating season. i <br /> 1 -#4 @ 12" O.C. <br /> C404.13 Service water-heating system commissioning and completion <br /> RR _�__- __ `�� _-. _ requirements. Service water-heatingsystems, swimming pool water- <br /> i la heating systems, spa water-heatin systems and the controls for those <br /> ;;:::::::.,t,,,: <br /> ,, , POOL DECK SIB systems shall be commissioned and completed in accordance with <br /> @ 12' O.C. (TYP) y p � <br /> IM <br /> Section C408. � �A F ; <br /> sF" f s <br /> i <br /> i ,_ _ _ _ Ai <br /> _ 2 '3 SLAB �1 ; <br /> a, <br /> ( ) # BARS i <br /> ` CO DECK ANCHOR , , <br /> s • <br /> •• <br /> ��' 'Y 07 11-19i <br /> ___ - <br /> �, r 11-0" MINIMUM DIA. �, <br /> ! ...w X 3'-0" DEEP POST <br /> • '��-���-d' HOLE FOOTING /// i� # t <br /> PLASTER FINISH " F <br /> ( . 11 <br /> i �r <br /> \:, <br /> oo <br /> 1 SPA NTS S i S 3oLl° ROTATION\ r <br /> \ T Q <br /> a I <br /> �, - SPECIAL INSPECTION REQUIREMENTS POOL SPA LIFT FOOTING I — J,al 'l ' cp w <br /> OPERATION CONTINUOUS PERIODIC REMARKS <br /> NTS '' + ' CO <br /> yi <br /> CONCRETE PLACEMENT X <br /> REINFORCING PLACEMENT Xj__ a � , _ ,._ <br /> --- /:/ // <br /> NOTE: „ (2) #3 TIES , . . <br /> ip_r_37.1 <br /> ALL ITEMS MARKED WITH AN "X" SHALL BE INSPECTED IN ACCORDANCE WITH IBC CHAPTER 17. SPECIAL 18 MAX 6°' MIN. @DECK ANCHOR \� `�`,` (t1 <br /> F THEVFY VJ/ MFR RADIUS ' ! \'� 1, __ 1 =J <br /> INSPECTION SHALL BE PERFORMED BY A QUALIFIED TESTING AGENCY DESIGNATED BY THE OWNER. 1 '1'' <br /> ENGINEER AND BUILDING OFFICIAL SHALL BE FURNISHED WITH COPIES OF ALL RESULTS. ANY INSPECTION — ? ~'-,4 t W <br /> (2) 3 SLAB BARS I Y ; i <br /> FAILING TO MEET THE PROJECT SPECIFICATIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF 18" 12" _' �g 1� T=`� I ° I <br /> DESIGN TEAM. �T` '1`1 <br /> L ie <br /> _ { 1--- <br /> THE <br /> f F 1 , <br /> _ ` <br /> - c1 lPOOL COPING — L' v"Aye Hurt :::_r: <br /> L� I <br /> ri " `— <br /> i // t <br /> bi C�'' <br /> ® POOL LIFT DECK ANCHOR I <br /> #4 @ 12" OC TOP ,/ 2" MIN. POOL FOR SPECTRUM PRODUCTS Q <br /> MOTION TREK .350, PROVIDED `I-r w I--@STAIR ` - r. BY LIFT MANUFACTURER. I <br /> o, ti #4 © 12 OC EACH PLACE SLAB, ANCHOR & ;-, o <br /> I I , REINF. PER PLAN zo 0 POST HOLE © SAME TIME ��-=- _,_�� *MOTION TREK LIFT PROVIDE) o $� � _ <br /> / » » �- ,� 350 LB LIFTING CAPACITY I DATE <br /> n� / NOTE: a31/s°,�taxrP.iup.� 07- `l 1 -19 <br /> `' » PROVIDE ELECTRICAL z�rBa+rs{ 9 1/8 I DRAWN <br /> • NOTE: <br /> •I - BONDING FOR ASSEMBI Y. J.M.A. <br /> II 1�" r I / DIMENSIONS VARY ITH SPEC:I"rIC`APPLICATIONS.SPEC:IFICATIGN$ARE NOMINAL AND ARE SUBJECT TO CHANGE_ <br /> -- -- __- <br /> PLEASE cONTF CT SPECTRUM AQUATICS r0 cusroM APPLICATIONS. DESIGNED <br /> s MIN. �_- -- _, _ o,. . . <br /> • <br /> s J.J.D. <br /> 3'-0" E I R I �,- AT E <br /> 1 , , * ;- APPROVED <br /> • <br /> © • 1 PRODUCT: MOTION TREK 350 <br /> Aquatics PRODUCT 153121 — _ J.J.D. <br /> N ,� MATERIAL: 314C STAINLESS S1 EL I I PROJECT NO <br /> 0) a A�'LAY CORE"Cornpny REVISION: A Wednesday, April 20,201 6 11 15:0!_AM ` F , <br /> _co i <br /> 2192061 '71U0 SpectrumLaneMissoula,Montana5�r3178 ti£1fJ.791.3r�5m avvr+v. #ret trvrrrUsutt#�c S.corn ' I <br /> SHEET N©. <br /> 0 € POOL LIFT DETAIL <br /> r <br /> STEP REINFORCING BENCH REINFORCING _ -�__ _ A � _ _ � � . <br /> u - __ __ NTS NTS NTS <br /> /" 9 <br /> ! <br /> I.- _.a ._.._ of <br /> _.® - e - <br /> 1 1 1 Sheets <br />