My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2817 COLBY AVE FIRST INTERSTATE BANK 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2817
>
FIRST INTERSTATE BANK
>
2817 COLBY AVE FIRST INTERSTATE BANK 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 9:56:50 AM
Creation date
8/12/2021 10:26:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2817
Tenant Name
FIRST INTERSTATE BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ¢�12491 <br />everett <br />April 21, 1987 <br />JOHN DRAKE the Evergreen <br />FIRST INTERSTATE BANK <br />PO BOX 160 OTY OF <br />SEATTLE, MA 98111 everett <br />RE: FIRE PREVENTION INSPECTION AT 2817 COLBY AVENUE, EVERETT <br />2911 OAKES•:599>el <br />EVERETT WASHINGTON <br />A fire prevention inspection was made of the business listed above. 9eru, <br />The following are requirements of the Uniform Fire Code, as adopted, TIRE DEPARTMENT <br />which require your immediate attention: <br />1. Repair the damaged gypsum wallboard with a fire -resistive material <br />equivalent to the surrounding surfaces. <br />a. replace southwest ceiling tile on first floor <br />b. hole in ceiling of janitor closet on first floor <br />C. hole in ceiling of janitor closet on second floor <br />d. hole in northwest ceiling of equipment room on third floor <br />e. hole in ceiling of computer room closet on third floor <br />f. replace ceiling tile on northwest side of third floor electrical room <br />g. hole in ceiling of fourth floor mechanical room <br />h. southeast wall of fourth floor at windows <br />I. holes in south ceiling and south wall of fourth floor lobby room <br />J. holes throughout basement ceiling and walls <br />2. Remove combustible storage from boiler room, south basement mechanical <br />room, and third floor mechanical room. <br />3. Maintain and have available for inspection a written record of test(s) of <br />the fire protection equipment. <br />a. sprinkler systems in basement and second floor <br />4. Remove all accumulations of paint or other foreign material from the <br />sprinkler head(s) or replace the head(s), <br />If sprinkler heads are subject to paint overspray, a light coating <br />of petroleum jelly may be applied to the fusible link assembly to <br />prevent adhesion and facilitate easy cleaning. <br />a. third floor mechanical room <br />
The URL can be used to link to this page
Your browser does not support the video tag.