My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2828 COLBY AVE CASCADE BANK 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2828
>
CASCADE BANK
>
2828 COLBY AVE CASCADE BANK 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 10:17:32 AM
Creation date
8/12/2021 11:09:36 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2828
Tenant Name
CASCADE BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File <br />f. <br />rR6�r Joe Kozlovski <br />DATE January 19, 1976 <br />SVR.IECT CASCADE SAVINGS & LOAN <br />ASSOCIATION CONSTRUG'PION <br />Page Two <br />C. <br />CITY OF EVERETT. EVERETT. WASHINGTON <br />requirements for covered walkways lighted and protected from <br />traffic. The result cf conversation was that Mr. Newland would <br />file an application for the use of public right-of-way during this <br />demolition -construction period for the use of sidewalks and the <br />parking strips. <br />4. Jack Requa indicated that there is presently need for five buses <br />on that side of Hewitt and the need would continue throughout <br />the demolition -construction period. He indicated that there is a <br />possibility that one bus could be moved to the other side of <br />Hewitt as a temporary measure during this period. Whenever <br />Mr. Newland's application is submitted he will provide a drawing <br />of the area he would like to use in construction and at that time <br />Mr. Requa could then judge what effect the application would <br />have on his bus stop operation. <br />5. Mr. Newland indicated' that the plans do not call for any side- <br />walk demolition on either Colby or Hewitt Avenue and he felt <br />that there was no responsibility of the owner to replace my <br />sidewalks unless damage occurred to the present walks during <br />the demolition -construction process. Mr. Ochlert stressed that <br />construction offered opportunity for the owner to get a new <br />sidewalk on Hewitt and that they should be encouraged to con- <br />sider this as part of their construction program. It was deter- <br />mined that both Mr. Oehlert and I would contact John Bryant, <br />the architect to make this as a recommendation to the client. <br />Meeting ended at 11:00 a.m. <br />cc: All participants <br />ei <br />
The URL can be used to link to this page
Your browser does not support the video tag.