Laserfiche WebLink
tk: <br />;D File <br />F Rot! Tot: Kozlo'✓sl.{i f . <br />DATE January 27, 1976 <br />SUBJECT CASCADE SAVINGS &LOAN <br />RIGHT-OF-WAY PERMIT <br />Ll <br />CITY OF EVERETT. EVERETI. WASHINGTON <br />Meeting was held Monday afternoon 3: 30 to 4: 30 p • In • January 26, 1976 to discuss the <br />Cascade Savings & Loan request for a right-of-way use permit at the existing <br />Woolworth building. <br />Mr. Newland stated that he still plans to begin demolition on February 2, ]976. <br />Fred Oehlert stated that there will be two right-of-way permits issued. The first <br />which will cover the use of the existing sidewalks and requirements for fencing and <br />pedest, ian walk 1n the Th aultsarea on Colby Avenue beneath the sidewalk.construction °f new side- <br />walks and work <br />Several items were discussed among Messrs. Newland, Warren, Oehlert and Kozlowski <br />i at tills meeting. The results of this discussion are shown Ilse permit bythe Mr following Oehlert will be <br />k, made conditions for the issuance of the right-of-way <br />division. <br />1. During demolition and construction, roofs over the pedestrian walk- <br />ways will be required on welkways that are six feet or closer to <br />construction in accordance with the building code, Section 4407-D <br />and table 44A. <br />e the peestrian walkway l be <br />ed <br />2. O feet from the newly builtcurb on Colby. OnlHewitt ittwill bet <br />set back two feet north of the westbound vehicular travelling lane. <br />und the <br />fence aro <br />demolitions project will be bu It in uction of the wkway c accordance with the building <br />tion- <br />code. <br />g. The permit for the construction fence, pedestrian walkway d <br />use of the sidewalk for demolition -construction will run until <br />September 1, 1976. Mr. Newland stated that by that time his con- <br />struction project will be enclosed and the cover and sidewalks will <br />not be required for either construction shacks or storage of <br />materials. At that time he will also have completed <br />repair required <br />sidewalk tile work and any aggregate <br />on the existing sidewalks. and landscape replacement. <br />N <br />