My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2828 COLBY AVE CASCADE BANK 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2828
>
CASCADE BANK
>
2828 COLBY AVE CASCADE BANK 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 10:17:32 AM
Creation date
8/12/2021 11:09:36 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2828
Tenant Name
CASCADE BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U� <br />To File <br />FR1 1. Joe Y,ozlovski <br />DATE January 27, 1976 <br />SUBJECT CASCADE SAVINGS & LOAN <br />RIGHT-OF-WAY PERMIT <br />CITY OF EVERETT. EVERETT. WASHINGTON <br />4. No permit for use of the sidewalk or pedestrian walkways will <br />be granted in front of the Kress building where Nordstrom's is <br />in process of remodel. <br />5. The location of the fence and pedestrian walkway at the corner <br />of Hewitt and Colby will be set back one grid pattern of <br />aggregate concrete (eight feet) to allow West Coast to complete <br />erection of the spanners, lights, traffic signals, and pulling <br />the wiring through the sidewalk level handholds. This loca- <br />tion may be realigned closer to the corner when West Coast <br />Construction does not require the area for their work. <br />6. Cascade will be responsible for removal of all existing planted <br />trees on project, their storage during demolition -construction <br />and the replanting after the sidewalk is put back into finished <br />condition September 1, 1976. <br />7. The City will delete from the West Coast contract all quarry <br />tile installation within the area between the diagonal lines of the <br />aggregate concrete located in the Woolworth section to the Kress <br />section. This work will be done by Cascade after the use of the <br />sidewalk for construction purposes has been completed. The <br />spaces between the aggregate concrete squares will be finished <br />by West Coast Construction before the demolition takes place and <br />will be accepted by the City in the finished state so that no addi- <br />tional work between the aggregate concrete squares will be <br />necessary to finish after construction of the bank is complete. It <br />will be the responsibility of Cascade however, to protect the <br />existing work from damage of demolition -construction and any <br />damage to the underground irrigation lines and utilities or finished <br />surfaces that occur due to the demolition -construction will be re- <br />placed at the expense of Cascade. <br />8. The City has responsibility to purchase from West Coast all <br />tile which is already purchased by them for the project. The <br />City will buy this at invoice cost. It is this material that will <br />be provided to Cascade for the completion of the sidewalks <br />once the demolition -construction is completed on the bank <br />building. (Mr. Newland asked the Engineering Department tb <br />provide him a square foot area of the tile work which is to be <br />done by him. This would not include the rounded corner at <br />the very tip of the two street intersection.) <br />V <br />
The URL can be used to link to this page
Your browser does not support the video tag.