My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2828 COLBY AVE CASCADE BANK 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2828
>
CASCADE BANK
>
2828 COLBY AVE CASCADE BANK 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 10:17:32 AM
Creation date
8/12/2021 11:09:36 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2828
Tenant Name
CASCADE BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRYANT, BUTTERFIELD do FRETS <br />January 23, 1976 <br />City of Everett - Engineering Department <br />City Hall <br />Everett, Washington 98201 <br />Attention: Fred Oehlert <br />• ARCHITECTS <br />A.I . �� I l <br />rOn.: <br />• 1 <br />JAN zg1976 <br />Subject: An Office Building for Cascade Savings and Loan Association <br />Hewitt and Colby, Everett, Washington <br />..... - .A. <br />FETT, <br />This is to confirm the results of an on -site meeting Thursday, January 22, 1976, <br />attended by you and Mr. Czerinski of the Engineering Department, Mr. Bud Krom <br />of the Water Department and me. <br />It is my understanding that the subgrade space under the sidewalk will remain <br />and that the existing Detector Check meter (6" fire service) and the two 2" domes- <br />tic water supply connections will remain. Fire service connection for the subject <br />structure will be connected to the existing Detector Check meter and if required, <br />the existing key -operated shut-off valve will be replaced by c, wheel operated <br />valve -- other equipment as required by the Fire Department will be installed down- <br />stream from the Detector Check meter and inside the property sine. <br />Domestic water service piping for the subject structure will be connected to one <br />of the existing 2" connections in the void space and the other one will be capped. <br />It is my further understanding that it will be necessary for the owner to secure a <br />special permit for this space and that the Engineering Department will prepare what- <br />ever documents are required to secure this permit for execution by a duly authorized <br />representative of the owner. <br />Please advise me immediately if any of the above is not correct and what further <br />action may be required on my part in behalf of the owner's interests. <br />Very truly yours, <br />YANT, B TT ELD & FRETS - ARCHITECTS - A.I.A. <br />Vim <br />j hn C. Bryant <br />(� Don Totten, CS&L <br />cc: Bud Krom, Water Department Newland Construction, Attn: Ben Newland <br />Joe Kozlovski, Community Development Ervin Engineers, Attn: Jim Halvorson <br />p. O. DOS 086 • 717 AIEDICAL DENTAL BLDG. • EVERE-rT. NA U8206 • PHONE 252.3304 <br />
The URL can be used to link to this page
Your browser does not support the video tag.