My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2506 BAKER AVE 2022-01-19
>
Address Records
>
BAKER AVE
>
2506
>
2506 BAKER AVE 2022-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 9:33:13 AM
Creation date
8/16/2021 8:10:46 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2506
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br />WASHINGTON <br />June 9, 2020 <br />Mr. Douglas Acheson <br />2506 Baker Avenue <br />Everett, WA 98201 <br />CITY OF EVERETT <br />Permit Services <br />Email Address: dda17@comcast.net <br />RE: Owner: Douglas Acheson <br />Job Address: 2506 Baker Avenue <br />Plan Check Number: B2005-039, First Building Review <br />Dear Mr. Acheson, <br />The proposed project has been reviewed for compliance with the provisions of the building codes <br />adopted and amended by the state of Washington and the city of Everett. The comments below <br />must be addressed before a permit can be issued. These comments address building issues only. <br />Additional revisions or additions may be required by other departments including Public Works, <br />Planning, and Fire. <br />Code citations provided in the following comments reference the 2015 International Residential <br />Code (IRC), the 2015 International Building Code (IBC), and the 2015 Washington State Energy <br />Code (WSEC). <br />In order for the processing of your application to continue, the following documentation shall be <br />submitted to the Building Division for review: <br />a. Itemized letter addressing the comments provided below. <br />b. Two complete sets of revised construction drawings. <br />c. Two copies of supplemental structural calculations. <br />Submittal documents shall contain sufficient information and detail to review the proposed project <br />for compliance with the adopted codes. Upon submittal of the revised documents, your application <br />will be given priority and plan reviews will recommence. <br />General: <br />1. The project appears intended to comply with the requirements of the IRC. However, the <br />proposed structural construction does not conform with the prescriptive design provisions of <br />this code. The design has been reviewed per the provisions of the IBC per IRC Section <br />R301.1.3. The comment does not require a response unless the applicant intends to clarify <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.