Laserfiche WebLink
2020 System Development Fee Calculations <br />Permit #: B2008-033 <br />Additional Notes: <br />Project Address: 5111 Delaware Ave <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: Add new roof over deck and entry <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Prepared By: Andrew Huang Date: 10/7/2020 <br />Sewer District: Everett <br />Outside City Limits? No *Adds a 25% Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />'A <br />Reviewed By: Date: ZZ zo <br />Fee Calculations: <br />Stormwater System Development Fees: <br />B2008-033 Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />325 1 SF <br />Stormwater System Dev Fee: <br />$83.17 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />PWXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: SF <br />Stormwater System Dev Fee: 1 $0.00JAdd this fee to the Public Works Permit for hard surfaces on the ground. <br />0 <br />