Laserfiche WebLink
PROJECT No. 1905.09.01 2020-149 G(1-1) <br />EVERETT C <br />ADDRESS: <br />2000 TOWER STREET <br />EVERETT, WA 98201 <br />0 <br />ISSUED F R PERMIT <br />U"f 1*0 111­1q�­ <br />ADMINISTRATIVE INFORMATION <br />TO EV & ALSO TGW ALL THOSE PTNS VAC OAKES AVE, <br />ROCKEFELLER AVE, 9TH ST & ALLEYSLY ADJ TO & ABTG ABV <br />PARCEL NUMBER: 29051700201800 <br />DESC TRS AS VAC PER CITY OF EV ORD NO 3378 DATED JUNE <br />PARCEL ADDRESS: 801 WETMORE AVE <br />3,1952 & NO 4092 DATED JULY 6,1965 & NO 4262 REC AF NO <br />EVERETT, WA 98201 <br />2026756 & NO 1283-86 REC AF NO 8611050050 TGW 9TH ST ABTG <br />PROPERTY ADDRESS: 2000 TOWER STREET, <br />LOT 18 BLK163 & LOT 34 BLK 180 SWALLWELL'S 4TH ADD VAC PER <br />EVERETT, WA, 98204 <br />ORD 428-76 REC AFN 7701240128 <br />NEIGHBORHOOD: 5308000 <br />PROPERTY CLASS: 682 University, College, Junior College, Etc. <br />STRUCTURE INFORMATION <br />STRUCTURE CLASS: COMMERCIAL <br />OWNERSHIP <br />OCCUPANCY: BUSINESS <br />SNOHOMISH CO PROP MGMT <br />3000 ROCKEFELLER AVE M/S 404 <br />STRUCTURE TYPE: CONCRETE <br />EVERETT, WA 98201 <br />STRUCTURE CONSTRUCTION TYPE: III -A <br />YEAR BUILT:1973 <br />Section 17 Township 29 Range 05 Quarter NW - BEG NXN E LN <br />ROOF COVER: BUILT-UP BITUMEN <br />LOMBARD AVE & N LN SWALWELLS 4TH ADD TH N ON E LN <br />LOMBARD PROD FOR 285FT TH ANG LEFT 67*12 02 FOR 416.79FT <br />TH ANG LEFT 22*46 57 FOR440.77FT TO E LN OF PLAT OF 1 ST ADD <br />TO LEGION PARK TH ANG LEFT 89*28 47 FOR 443.77FT TO NXN N <br />LN SWALWELLS 4TH ADD TH ANG LEFT 90*2015 FOR 829.16FT TO <br />POB TGW LOTS 3 THRU 9 BLK 166 OF LEGION PARK 1STADD & <br />TGW ALL OF BLKS 163, 164, 165, 166,177,179 & 180 OF <br />SWALWELLS 4TH ADD & TGW ALL BLK 179 & 180 OF BAILEYS ADD <br />I� I ji� iT� "Mm, � <br />N.T.S. <br />Rainier Hall <br />10th St <br />• <br />• <br />mm <br />ARCHITECTURAL: <br />G1.0 COVERSHEET AND GENERAL INFO. <br />G1.1-R PHOTO DETAILS <br />G1.2-R PHOTO DETAILS <br />G1.3-R PHOTO DETAILS <br />A1.2-R SITE PLAN <br />A1.3-R KEY PLANS <br />A2.1-R 1st FLOOR PLANS <br />A2.2-R 2nd FLOOR PLANS <br />A2.3-R 3rd FLOOR PLANS <br />A3.1-R 1st FLOOR REFLECTED CEILING PLANS <br />A3.2-R 2nd FLOOR REFLECTED CEILING PLANS <br />A3.3-R 3rd FLOOR REFLECTED CEILING PLANS <br />A4.2-R INTERIOR ELEVATIONS <br />A4.3-R INTERIOR ELEVATIONS <br />A4.4-R INTERIOR ELEVATIONS <br />A5.1-R FINISH MATERIALS, SCHEDULES & DETAILS <br />MECHANICAL: <br />M0.1-R MECHANICAL LEGEND, NOTES, AND SCHEDULES <br />M0.1-R MECHANICAL LEGEND, NOTES, AND SCHEDULES <br />M1.1-R 1st FLOOR PLUMBING PLANS <br />M1.2-R 2nd FLOOR PLUMBING PLANS <br />Tower St <br />0 <br />*In W I : to] 9 911 Oki # Id I M Oki' I NV <br />OWNER <br />ARCHITECT <br />ELECTRICAL ENGINEER <br />EVERETT COMMUNITY COLLEGE <br />OAI, P.S. <br />CASE ENGINEERS <br />2000 TOWER ST <br />1011 SW KLICKITAT WAY <br />19515 NORTH CREEK PARKWAY <br />EVERETT, WA 98032 <br />STE. 208 <br />STE 302 <br />SEATTLE, WA 98134-1162 <br />BOTHELL, WA 98011 <br />RICHARD RADCLIFF <br />P: 425.388.9516 <br />JERRY OSBORN, AIA - PRINCIPAL <br />TIM NICHOLS <br />E: rradcliff@everettcc.edu <br />P: 206.920.6348 <br />P: 425.402.9400 X119 <br />E: JOSBORN@OAIPS.COM <br />TIM@CASEENG.COM <br />OWNER'S REPRESENTATIVE <br />DEPARTMENT OF ENTERPRISE SERVICES <br />MECHANICAL ENGINEER <br />E & A SERVICES <br />BOGARD ENGINEERS.- <br />1500 JEFFERSON ST. SE, 2-NORTH <br />22121 17TH AVE SE <br />E W <br />�.: � �R �e'�� :SSUANCOF <br />PO <br />PO BOX 41012 <br />STE 111 <br />y%IORKS, MECHANICAL, FIRE <br />OLYMPIA, WA 98504 <br />BOTHELL, WA 98021 <br />SUPPpESSiCN, ELECTRICAL OR <br />PLIJ0PERMITS. <br />SUSAN SMITH <br />LEE BOGARD <br />P: 360.407.7978 <br />P: 425.415.6100 <br />ji <br />For This Include, <br />E: susan.smith@des.wa.gov <br />E: LBOGARD@BOGENG.NET <br />Plumbing Sprinkler <br />Mechanical Ir^� Fire Alarm <br />Electrical <br />M1.3-R 3rd FLOOR PLUMBING PLANS <br />1. ALL WORK TO BE PERFORMED IN COMPLIANCE WITH ALL APPLICABLE CODES, LAWS AND REGULATIONS OF ALL AUTHORITIES <br />HAVING JURISDICTION OVER THE WORK. <br />ELECTRICAL: <br />2. CONTRACTOR TO VERIFY ALL DIMENSIONS, PROPERTY LINES, MEASUREMENTS AND CONDITIONS IN THE FIELD BEFORE <br />E0.1 ELECTRICAL LEGEND AND SCHEDULES <br />BEGINNING WORK. ANY DISCREPANCIES, ERRORS OR OMISSIONS TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT <br />ED2.1 1st FLOOR DEMOLITION ELECTRICAL PLAN <br />IMMEDIATELY. <br />ED2.2 2nd FLOOR DEMOLITION POWER PLAN <br />ED2.3 3rd FLOOR DEMOLITION ELECTRICAL PLAN <br />3. THE ARCHITECT WILL HAVE A REPRESENTATIVE ON SITE, PART-TIME TO OBSERVE THE CONSTRUCTION FOR COMPLIANCE WITH <br />E2.1 1st FLOOR ELECTRICAL PLAN <br />THE DESIGN INTENT AND TO ASSIST THE CONTRACTOR IN RESOLVING VARIATIONS IN THE EXISTING CONSTRUCTION. THESE <br />E2.2 2nd FLOOR ELECTRICAL PLAN <br />DOCUMENTS ADDRESS ALL KNOWN CONDITIONS, BUT IT IS ANTICIPATED THAT HIDDEN CONDITIONS WILL BE ENCOUNTERED <br />E2.3 3rd FLOOR ELECTRICAL PLAN <br />DURING CONSTRUCTION. THE ARCHITECT WILL OBSERVE ALL SUCH HIDDEN CONDITIONS AND ISSUE CLARIFICATIONS OR <br />E9.1 RAINIER HALL RISER DIAGRAM <br />MODIFICATIONS OF THE DESIGN TO ADDRESS SUCH CONDITIONS AND WILL DOCUMENT ALL CHANGES. <br />4. UNLESS OTHERWISE NOTED, ALL ANGLES TO BE RIGHT ANGLES, ALL LINES WHICH APPEAR PARALLEL ARE TO BE PARALLEL, <br />AND ALL ITEMS WHICH APPEAR CENTERED ARE TO BE CENTERED. CONTRACTOR TO BE RESPONSIBLE FOR MAINTAINING ALL <br />LINES TRUE, LEVEL, PLUMB AND SQUARE. <br />5. DETAILED AND/OR LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER GENERAL AND SMALLER SCALE DRAWINGS. POSTED <br />DIMENSIONS WILL TAKE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTOR TO VERIFY SCALED DIMENSIONS WITH <br />ARCHITECT BEFORE PROCEEDING WITH WORK. <br />6. ALL ATTACHMENTS, CONNECTIONS AND FASTENINGS OF ANY NATURE ARE TO BE PROPERLY AND PERMANENTLY SECURED IN <br />CONFORMANCE WITH THE BEST PRACTICES OF THE BUILDING INDUSTRY. DRAWINGS SHOW ONLY SPECIAL REQUIREMENTS TO <br />ASSIST THE CONTRACTOR AND DO NOT SHOW EVERY DETAIL. <br />7. DETAILS SHOWN IN THESE DRAWINGS ARE TYPICAL AND WILL APPLY UNLESS OTHERWISE NOTED OR SHOWN. DETAILS OF <br />CONSTRUCTION NOT FULLY SHOWN ARE TO BE OF THE SAME NATURE AS THOSE DRAWN FOR SIMILAR CONDITIONS. <br />8. CONTRACTOR TO COORDINATE ALL OPERATIONS WITH OWNER, INCLUDING: SITE ACCESS, MATERIALS STORAGE AND STAGING, <br />INTERRUPTION OF ELECTRICAL, MECHANICAL, FIRE -ALARM, LOW -VOLTAGE SERVICES AND TIMING OF NOISY OR DISRUPTIVE <br />DETAIL NUMBER <br />OPERATIONS. CONTRACTOR TO VERIFY SEQUENCE OF WORK WITH OWNER. <br />1 1 SECTION NUMBER A1.0 DRAWING SHEET <br />A1.o DRAWING SHEET 9. ALL LUMBER OR PLYWOOD IN CONTACT WITH CONCRETE OR LUMBER INSTALLED AS NAILERS (EXCEPT PLYWOOD DECK OR <br />CRICKETS) SHALL BE PRESSURE -TREATED WITH WATER -BORNE PRESERVATIVES. <br />10. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING DUST BARRIERS AT ALL WORK LOCATIONS AND DURING ALL PHASES OF THE <br />0 KEYNOTE NUMBER DR# DOOR NUMBER WORK. <br />11. THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION <br />i f_ <br />IoII=1l_I_iit/ <br />1 ENLARGED PLAN i <br />A1.0 ® DRAWING SHEET <br />PHOTO NUMBER <br />DRAWING SHEET <br />_(j) NORTH ARROW <br />NORTH <br />1 DIMENSION <br />1 ELEVATION NUMBER <br />A1.0 A DRAWING SHEET <br />I�, <br />RICHARD RADCLIFF <br />FACILITIES MANAGER, EVERETT COMMUNITY COLLEGE <br />SUSAN SMITH <br />PROJECT MANAGER, DEPT. OF ENTERPRISE SERVICES (DES) <br />NANCY DEAKINS <br />ASSISTANT PROJECT MANAGER, DEPT. OF ENTERPRISE SERVICES (DES) <br />9W <br />Permit#: B2001-039 <br />Site Address: 2000 TOWER Sr RAINIER HA <br />Owner: EVERETT COMMUNITY COLLEGE <br />Tenant: RAINIER HALL <br />App.Date: 1/24/2020 <br />Proposed Use: SCHOOL <br />Description: MODIFY TOILET ROOMS ON FLOORS 1,2,3 <br />AND MAKE TOILET ROOMS <br />Date. ct1 <br />Reviewed 8y,� �=�-- <br />. Office Set lob Site Set Fire/Planning Set <br />6273 <br />REGISTERED <br />ARCHITECT` <br />aE D. 0880M <br />A7E0FWA8H GMN <br />CO <br />H <br />0 <br />Z <br />W w <br />Ce w <br />J <br />r- <br />® w N <br />W <br />U w <br />J o, 00 r- <br />® �7_ a� <br />ME w <br />J � r <br />O <br />w � <br />®~OY <br />Q <br />_ ® w N <br />LU N <br />w <br />W w <br />Z <br />00 <br />V <br />ma� <br />C <br />F <br />UJI <br />O <br />®� <br />CD <br />LU <br />® <br />Cl) <br />o <br />cv <br />N <br />U <br />°- <br />Z <br />m <br />CnCU <br />ti <br />, <br />c <br />*ks <br />® <br />U <br />Sheet No / Title: <br />GOmO <br />COVERSHEET AND <br />GENERAL INFO <br />r r *r <br />Project #: 2020-149 G(1-1) <br />© copyright 2019 <br />