My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST 2020 RAINIER HALL Plans 2022-11-28
>
Address Records
>
TOWER ST
>
2000
>
RAINIER HALL
>
Plans
>
2000 TOWER ST 2020 RAINIER HALL Plans 2022-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2022 1:19:02 PM
Creation date
8/17/2021 8:50:24 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
RAINIER HALL
Permit
B2001-039
Year
2020
Notes
MODIFY TOILET ROOMS ON FLOORS 1,2,3 AND MAKE TOILET ROOM
Address Document Type
Plans
Imported From Microfiche
No
Link Groups
Link
1:
2000 TOWER ST 2020 RAINIER HALL Plans 2022-11-28
Last modified:
11/28/2022 1:19:02 PM
Path:
\Documents\Public Works\Records\Address Records\TOWER ST\2000\RAINIER HALL\Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MECHANICAL NOTES <br />GENERAL NOTES <br />ABBREVIATIONS <br />PIPING SYMBOLS <br />.� <br />t <br />THE FOLLOWING NOTES APPLY YC ALL MECHANICAL DRAWINGS. <br />PROTECT ALL DUCT OPENINGS OF FIRE RATED ASSEMBLIES PER I.B.C. 7% <br />}ADA <br />AMERICANS WITH DISABILITIES ACT <br />_ <br />BALL VAIwVE <br />� - — H fS------- <br />HEATING WATER SUPPLY <br />J PLUMBING FIXTURE <br />ADDITIONAL MECHANICAL NOTES MAY BE INDICATED ON EACH <br />AFF <br />ABOVE -'WISHED FLOOR <br />_ <br />BALANCING VALVE <br />— — — HWR — — — <br />HEATING WATER RETURN <br />IDENTIFICATION <br />MECHANICAL, PLUMBING AND FIRE PROTECTION DRAWING. <br />INSTALL SEISMIC BRACING FOR ALL DUCTWORK, EQUIPMENT AND PIPING <br />ARCH. <br />ARCHITECT / ARCHITECTURAL <br />� M�� � EQUIPMENT <br />PER I.B.C. REQUIREMENTS: <br />F <br />BOILER I�wEED <br />-�--=-�,��--_ - _. <br />-- <br />� � <br />BUTTERFLY VALVE <br />__�.------- CA � <br />COMPRESSED AIR <br />IDENTIFICATION <br />. <br />REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL <br />CONSTRUCTION INCLUDING LOUVERS, CONCRETE EQUIPMENT PADS, <br />INSTALL ALL PIPING ON ROOM SIDE OF BUILDING INSULATION. <br />CA <br />COMPRESSED AIR <br />CHECK VALVE <br />---CHS - -- <br />CHILLED WATER SUPPLY <br />FLASHING DETAILS, ETC. <br />CD <br />CEILING DIFFUSER <br />- �--� � <br />CLEAN OUT <br />— — — CI�R � � 5� <br />CHILLED WATER RETURN <br />AIR TERMINAL MARK <br />-- <br />MECHANICAL DRAWINGS ARE DIAL MMATIC IN NATURE AND DC NOT <br />CF <br />CHEMICAL FEED <br />TYPE <br />. <br />MECHANICAL DRAWINGS SHOW APPROXIMATE LOCATIONS FOR GRILLES AND <br />NECESSARILY REFLECT EVERY REQUIRED OFF -SET, FITTING OR ACCESSORY. <br />CC <br />CEILING GRILLE <br />`��' � - <br />CONTROL VALVE m 2 WAY <br />CWS <br />CONDENSER WATER SUPPLY <br />K (SEE SCHEDULE) <br />DIFFUSERS. REFER YC ARCHITECTURAL REFLECTED CEILING PLANS AND <br />ELEVATIONS FOR EXACT LOCATIONS. <br />THE MECHANICAL CONTRACTOR SHALL VISIT THE JOB SITE PRIOR YC <br />CO <br />COP <br />CLEAN{BUY <br />COEFFICIENT OF PERFORMANCE <br />0 _ _ <br />CONTROL VALVE c � JAY <br />� � CU�IR w� � �� <br />CONDENSER WATER RETURN <br />F � <br />� DESIGN CFM <br />BEGINNING WORK IN ORDER TO OBSERVE EXISTING CONDITIONS. VERIFY <br />------------ -� <br />DEMOLISHED ITEM <br />-- D --a- <br />CONDENSATE DRAIN <br />4, <br />- <br />ARRANGE HVAC EQUIPMENT SO THAT ACCESS CLEARANCES INDICATED Y <br />EXACT SIZE, LOCATION AND CONDITION OF ALL EXISTING SYSTEMS, DUCTS, <br />COND <br />CONY. <br />CONDENSATE <br />CONTINUATION <br />FLOW METER <br />x F <br />FIRE SPRINKLER PIPE <br />DETAIL REFERENCE <br />DRAWINGS, REQUIRED Y CODES O RECOMMENDED Y MANUFACTURER <br />PIPES, UTILITIES AND BUILDING STRUCTURE. <br />ARE PROVIDED. <br />VERIFY VOLT AGES AT THE SITE PRIOR TO ORDERING ANY EQUIPMENT. <br />C.V. <br />DWG <br />CHECK VALVE <br />DRAWING <br />-- - - <br />FLEX CONNECTION <br />- G — - <br />NATURAL OAS <br />DETAIL NUMBER <br />1 <br />GATE VALVE <br />- LR --� <br />LIQUID REFRIGERANT <br />PROVIDE A VOLUME DAMPER FOR EACH SUPPLY, RETURN AND EXHAUST <br />(E) <br />EXISTING ITEMS <br />M <br />. <br />OPENING 9 IN SUPPLY BRANCH WHERE THREE OR MORE OPENINGS ARE <br />CONTRACTOR SHALL PROVIDE WASTE, VENT, WATER AND GAS PIPING, <br />EA <br />EXHAUST AIR <br />a <br />PRESSURE REDUCING VALVE <br />- <br />�- SR � <br />SUCTION REFRIGERANT <br />�`- DRAWING ON WHICH <br />ASSOCIATED WITH THE NCH, AND ELSEWHERE AS NOTED ON DINGS <br />INCLUDING TRAPS, FITTINGS AND STOPS TO COMPLETE EACH EQUIPMENT <br />EAT <br />ENTERING AIR TEMP. <br />� <br />SECTION IS LOCATED <br />OR IN SPECIFICATIONS. <br />HOOKUP TO THE PC31NY OF FINAL CONNECTION, CONNECTION BETWEEN <br />PRESSURE RELIEF VALVE <br />�� <br />- RIB— <br />RAIN LEADER <br />6. <br />REFER TO PIPING DIAGRAMS AND DETAILS FOR REQUIRED FITTINGS, VALE/ES, <br />VARIOUS PIECES OF EQUIPMENT SHALL BE MADE BY TIME PLUMBING <br />CONTRACTOR AT THE TIME EQUIPMENT IS BEING INSTALLED. <br />EER <br />EFF <br />ENERGY EFFICIENCY RATING <br />EFFICIENCY' 1 EFFICIENT <br />�R <br />REDUCED PRESSURE - <br />ORL � <br />OVERFLOW I LEADER <br />SECTION REFERENCE <br />-- - --'SECTION <br />ETC. FLOOR PLANS AND SECTIONS INDICATE EQUIPMENT LOCATIONS AND <br />ELECT. <br />ELECTRICAL <br />DA KFLO i PREVENTER <br />- <br />PIPE DOWN <br />NUMBER <br />� <br />GENERAL PIPE ROUTING ONLY, PROVIDE PIPING SHOP DRAWINGS <br />FFD <br />FLOOR � 1NNEL DRAIN <br />� � - <br />THERMOMETER <br />� --g <br />PIPE UP <br />A <br />COORDINATED WITH OTHER TRADES. REFER TO SPEC, FOR ADDITIONAL SLOP <br />G.V. <br />GATE VALVE <br />DRAWING REQUIREMENTS.CONTRACTOR <br />MECHANICAL <br />UNION <br />HOSE BI / WALL HYDRANT <br />®2 � DRAWING ON WHICHMC <br />MECH. <br />MECHANICAL <br />- — — — - — — <br />VENT <br />NOSE DRAIN VALVE <br />SECTION IS LOCATED <br />7. <br />PROVIDE AIR DISTRIBUTION (SUPPLY/ RETURN/EXHAUST) SHOP DRAWINGS <br />NP <br />NON PO d ABLE <br />WASTE <br />0 <br />VENT THROUGH ROOF <br />REVISION <br />� <br />COORDINATED WITH OTHER TRADES. REFER TO SPEC. FOR ADDITIONAL SHOP <br />OSA <br />OUTSIDE AIR <br />-- --- — <br />COLD WATER (DOM). <br />IDENTIFICATION <br />DRAWING REQUIREMENTS. <br />O S Y <br />OPEN STEM & YOKE <br />HOT WATER (DO a�). <br />101 <br />FLOOR DRAIN <br />i� FLAG NOTE <br />P.O.C, <br />POINT OF CONNECTION <br />�g � � <br />FLOOR SINK <br />REFER TO ARCHITECTURAL DRAWINGS FOR ROOM ELEVATIONS. LOCATE <br />MECHANICAL DEVICES SUCH AS TEMPERATURE SENSORS, HUMIDISTATS, <br />RC <br />RETURN / RELIEF GRILLE <br />HOT WATER RECIRC. (DOM). <br />� _-_ � <br />SPRINKLER HEAD - PENDANT <br />PANELS, ETC, SO THAT THEY DO NOT CONFLICT WITH GENERAL <br />SA <br />SENS <br />SUPPLY FAIR <br />SENSOR <br />SPRINKLER HEAD a UPRIGHT <br />CONSTRUCTION, LABORATORY EQUIPMENT, OR ELECTRICAL SYSTEM (LIGHT <br />STITCHES, PANELS, OUTLETS, ETC.). <br />SG <br />SUPPLY GRILLE <br />STM <br />STEAM <br />T`STAT <br />THERMOSTAT <br />TYP <br />TYPICAL <br />U.O.N. <br />UNLESS OTHERWISE NOTED <br />V <br />VENT <br />VTR <br />THROUGH ROOF <br />�VENT <br />WASTE <br />WCO <br />WALL CLEANOUT <br />copyright 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.