Laserfiche WebLink
m <br />co <br />0 <br />1 <br />a <br />0 <br />N <br />0 <br />N <br />ULEAK <br />J 2nd Floor PROPOSES - -- NORTH <br />NORTH —(I) <br />GENERAL TES <br />1. (E) RESTROOMS TO HAVE ACT, FIXTURES, PARTITIONS, <br />LIGHTS, AND BASE / FLOOR TILES REMOVED. <br />2. SEE MECHANICAL FOR HVAC DEMO. <br />3. SEE ELECTRICAL FOR ELECTRICAL DEMO. <br />4. CONTRACTOR SHALL REMOVE ALL EXISTING ANCHORS, <br />PATCH ALL EXISTING DOLES, ABRASIONS, SCUFFS, AND <br />DAMAGE ON WALLS PRIOR TO PREPPING WALL TO RECEIVE <br />FINAL FINISH PER ROOM FINISH SCHEDULE. <br />5. CONTRACTOR SHALL COORDINATE LOCATION OF ALL WALL <br />MOUNTED FIXTURES (INCLUDING, BUT NOT LIMITED TO, <br />SWITCHES, PULL STATIONS, ALARMS, KEY SWITCHES, AND <br />PANELS) TO ALIGN APPROPRIATELY WITH ONE ANOTHER <br />INCLUDING WALL COVERINGS AND TRIM PIECES. ALL FIXTURE <br />MOUNTING HEIGHT SHALL MEET LOCAL CODES AND <br />JURISDICTION REQUIREMENTS. <br />PROPOSED KEY NOTES LEGEND <br />C)J (N) STAINLESS STEEL CASED OPENING — SEE DETAIL 4/A5.1—R. <br />Cl (N) PAINT ON EXIST. DOOR AND FRAME <br />(N) FULL HEIGHT TOILET PARTITIONS. INSTALL BLOCKING PER <br />MANUFACTURERS REQUIREMENTS AS NECESSARY <br />(REFER(N) COUNTER W/ UNDER MOUNTED SINKS — TYPICAL <br />rO MECHANICAL) INSTALL SOLID BLOCKING FOR FLUSH <br />MOUNTED BRACKETS MANUFACTURERS REQUIREMENTSIS _ <br />SSARY <br />(N) FIXTURES m TYPICAL (REFER TO MECHANICAL) <br />BRICKFURNISH & IRSTALL (N) WALL FURRING OVER ALL <br />WALLS INSIDE ROOM — SEE A4.3—R AND A5.2-13 FOR <br />ADDITIONAL FINISHES <br />C� (N) WALL —MOUNTED BABY CHANGING STATION <br />(E) WALL <br />(N) WALL <br />(N) WALL FINISHES <br />(N) PARTITION <br />(N) FLOOR TILE <br />DEMO KEY NOTES & LEGEND <br />D� DEMO (E) DOOR AND FRAME. <br />(D DEMO (E) FIXTURES — TYPICAL <br />D3 DEMO (E) PARTITIONS <br />D4 DEMO (E) WALL TILE BASE — TYPICAL FOR ALL WALLS <br />(E) CONSTRUCTION TO REMAIN <br />DEMO (E) WALL <br />DEMO (E) FLOOR TILES <br />— — — — — — - — — — DEMO (E) BASE AND WALL TILES (TYP.) <br />I <br />/ DEMO (E) DOOR <br />iLi <br />E= <br />� <br />G� 1 1 R/ PHOTO LOCATION <br />PROJECT BASE BID BOUNDARY (DIAGRAMATIC) <br />